Difference between revisions of "Matrix of Implementation Examples"
Tag: visualeditor |
|||
Line 86: | Line 86: | ||
| | | | ||
| | | | ||
− | + | !X | |
| | | | ||
| | | | ||
Line 100: | Line 100: | ||
|[[Enterprise Systems Engineering]] | |[[Enterprise Systems Engineering]] | ||
!X | !X | ||
− | + | !X | |
− | + | !X | |
| | | | ||
| | | | ||
Line 115: | Line 115: | ||
|[[Systems of Systems (SoS)]] | |[[Systems of Systems (SoS)]] | ||
!X | !X | ||
− | + | !X | |
| | | | ||
| | | | ||
Line 129: | Line 129: | ||
|- | |- | ||
|[[Life Cycle Models]] | |[[Life Cycle Models]] | ||
− | + | !X | |
| | | | ||
| | | | ||
Line 145: | Line 145: | ||
|[[Business or Mission Analysis]] | |[[Business or Mission Analysis]] | ||
!X | !X | ||
− | + | !X | |
| | | | ||
| | | | ||
Line 159: | Line 159: | ||
|- | |- | ||
|[[Stakeholder Needs and Requirements]] | |[[Stakeholder Needs and Requirements]] | ||
− | + | !X | |
− | + | !X | |
| | | | ||
| | | | ||
Line 189: | Line 189: | ||
|- | |- | ||
|[[System Architecture]] | |[[System Architecture]] | ||
− | + | !X | |
− | + | !X | |
| | | | ||
| | | | ||
Line 206: | Line 206: | ||
| | | | ||
| | | | ||
− | + | !X | |
| | | | ||
!X | !X | ||
Line 234: | Line 234: | ||
|- | |- | ||
|[[System Integration]] | |[[System Integration]] | ||
− | + | !X | |
| | | | ||
− | + | !X | |
!X | !X | ||
!X | !X | ||
Line 251: | Line 251: | ||
| | | | ||
| | | | ||
− | + | !X | |
| | | | ||
!X | !X | ||
Line 264: | Line 264: | ||
|- | |- | ||
|[[System Validation]] | |[[System Validation]] | ||
− | + | !X | |
| | | | ||
| | | | ||
Line 339: | Line 339: | ||
|- | |- | ||
|[[Planning]] | |[[Planning]] | ||
− | + | !X | |
− | + | !X | |
| | | | ||
!X | !X | ||
Line 371: | Line 371: | ||
| | | | ||
| | | | ||
− | + | !X | |
!X | !X | ||
!X | !X | ||
Line 399: | Line 399: | ||
|- | |- | ||
|[[Decision Management]] | |[[Decision Management]] | ||
− | + | !X | |
| | | | ||
| | | | ||
Line 431: | Line 431: | ||
| | | | ||
| | | | ||
− | + | !X | |
| | | | ||
| | | | ||
Line 444: | Line 444: | ||
|- | |- | ||
|[[Quality Management]] | |[[Quality Management]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |[[Enabling Systems Engineering]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |[[Related Disciplines]] | ||
| | | | ||
| | | |
Revision as of 12:03, 26 June 2015
The following matrix maps the SEBoK Systems Engineering Implementation Examples to topics in the Systems Engineering Body of Knowledge (SEBoK), primarily Part 3. It provides both a list of potential systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset are included here for clarity. For additional information, see the implementation example of interest and the corresponding SEBoK topic.
Organization and Mapping of Case Studies to the SEBoK
The following short titles shown in Table 1 (Developed for BKCASE) are used for the Case Study implementation examples:
Case Studies | |
---|---|
BT | Business Transformation |
ATC | NextGen Air Traffic Control |
NASA | NASA's Mission to Saturn |
HST | Hubble Space Telescope |
GPS | Global Positioning System |
GPS II | Global Positioning System II |
Radiation | Medical Radiation |
FBI VCF | FBI Virtual Case File System |
MSTI | Miniature Seeker Technology Integration |
Infusion Pump | Next Generation Medical Infusion Pump |
DfM | Design for Maintainability |
LTRS | Launch and Test Range System (LTRS) |
CAS | Complex Adaptive Operating System |
Table 2 shows how the topics (each row) align with the Case Study implementation examples (each column):
SEBoK Topic (Part 3) | BT | ATC | NASA | HST | GPS | GPS II | Radiation | FBI VCF | MSTI | Infusion Pump | DfM | LTRS | CAS |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Product Systems Engineering | |||||||||||||
Service Systems Engineering | X | ||||||||||||
Enterprise Systems Engineering | X | X | X | ||||||||||
Systems of Systems (SoS) | X | X | |||||||||||
Life Cycle Models | X | ||||||||||||
Business or Mission Analysis | X | X | X | X | |||||||||
Stakeholder Needs and Requirements | X | X | X | X | X | ||||||||
System Requirements | X | X | X | X | X | ||||||||
System Architecture | X | X | X | X | X | X | |||||||
System Analysis | X | X | X | ||||||||||
System Implementation | X | X | |||||||||||
System Integration | X | X | X | X | X | X | |||||||
System Verification | X | X | X | X | X | X | |||||||
System Validation | X | X | X | X | X | X | |||||||
System Deployment | X | X | |||||||||||
Operation of the System | X | X | X | ||||||||||
System Maintenance | |||||||||||||
Logistics | |||||||||||||
Planning | X | X | X | X | X | X | |||||||
Assessment and Control | X | X | X | X | |||||||||
Risk Management | X | X | X | X | X | X | X | X | |||||
Measurement | X | ||||||||||||
Decision Management | X | X | X | X | |||||||||
Configuration Management | X | X | X | X | |||||||||
Information Management | X | X | X | ||||||||||
Quality Management | |||||||||||||
Enabling Systems Engineering | |||||||||||||
Related Disciplines |
The following short titles shown in Table 3 (Developed for BKCASE) are used for the Vignette implementation examples:
Case Studies | |
---|---|
Bag Handling | Denver Airport Baggage Handling System |
VA Sub | Virginia Class Submarine |
Route Mod | UK West Coast Route Modernisation Project |
Water Mgmt | Singapore Water Management |
FAA AAS | FAA Advanced Automation System |
Light Rail | Standard Korean Light Transit System |
Table 4 shows how the topics (each row) align with the Vignette implementation examples (each column):
SEBoK Topic (Part 3) | Bag Handling | VA Sub | Route Mod | Water Mgmt | FAA AAS | Light Rail |
---|---|---|---|---|---|---|
Business or Mission Analysis | X | X | X | |||
Stakeholder Needs and Requirements | X | X | X | |||
System Requirements | X | X | X | |||
System Architecture | X | X | X | X | X | |
System Analysis | X | X | X | X | ||
System Implementation | X | |||||
System Integration | X | X | X | |||
System Verification | X | X | X | |||
System Validation | X | X | X | |||
System Deployment | X | |||||
Operation of the System | X | X | ||||
System Maintenance | X | |||||
Logistics | X | |||||
Planning | X | X | X | X | X | |
Assessment and Control | X | X | ||||
Risk Management | X | X | X | X | X | |
Measurement | X | |||||
Decision Management | X | X | X | |||
Configuration Management | X | X | X | |||
Information Management | X | |||||
Quality Management | X |
References
Works Cited
None.
Primary References
None.
Additional References
None.
SEBoK Discussion
Please provide your comments and feedback on the SEBoK below. You will need to log in to DISQUS using an existing account (e.g. Yahoo, Google, Facebook, Twitter, etc.) or create a DISQUS account. Simply type your comment in the text field below and DISQUS will guide you through the login or registration steps. Feedback will be archived and used for future updates to the SEBoK. If you provided a comment that is no longer listed, that comment has been adjudicated. You can view adjudication for comments submitted prior to SEBoK v. 1.0 at SEBoK Review and Adjudication. Later comments are addressed and changes are summarized in the Letter from the Editor and Acknowledgements and Release History.
If you would like to provide edits on this article, recommend new content, or make comments on the SEBoK as a whole, please see the SEBoK Sandbox.
blog comments powered by Disqus