Difference between revisions of "Acceptance Criteria (glossary)"

From SEBoK
Jump to navigation Jump to search
m (Removed protection from "acceptance criteria ")
Line 11: Line 11:
  
 
{{5comments}}
 
{{5comments}}
 +
{{DISQUS}}

Revision as of 12:27, 23 May 2012

The procurement specification, in the context of the overall agreement, should clearly state the criteria by which the acquirer will accept delivery from the supplier. A verification matrix can be used to clarify these criteria. (INCOSE 2010, Section 6.1.15)

Source

INCOSE. 2010. Systems Engineering Handbook: A Guide for System Life Cycle Processes and Activities. Version 3.2.1. San Diego, CA, USA: International Council on Systems Engineering (INCOSE), INCOSE-TP-2003-002-03.2.1

Discussion

There is currently no discussion for this term. This will be completed for SEBoK version 1.0.



SEBoK v. 1.9.1 released 30 September 2018

SEBoK Discussion

Please provide your comments and feedback on the SEBoK below. You will need to log in to DISQUS using an existing account (e.g. Yahoo, Google, Facebook, Twitter, etc.) or create a DISQUS account. Simply type your comment in the text field below and DISQUS will guide you through the login or registration steps. Feedback will be archived and used for future updates to the SEBoK. If you provided a comment that is no longer listed, that comment has been adjudicated. You can view adjudication for comments submitted prior to SEBoK v. 1.0 at SEBoK Review and Adjudication. Later comments are addressed and changes are summarized in the Letter from the Editor and Acknowledgements and Release History.

If you would like to provide edits on this article, recommend new content, or make comments on the SEBoK as a whole, please see the SEBoK Sandbox.

blog comments powered by Disqus