Manufacturability and Producibility

From SEBoK
Jump to navigation Jump to search

Manufacturability and producibility is an engineering specialty. The machines and processes used to build a system must be architected and designed. Manufacturing equipment and processes can sometimes cost more than the system being built, and so a systems engineering approach to manufacturing and production is necessary (Maier and Rechtin 2002). Manufacturability and producibility can be a discriminator between competing system solution concepts and therefore must be considered early in the study period, as well as during the maturing of the final design solution.

Multiple Systems

The system being built might beone-of-a-kind, or intended to be reproduced multiple times. The manufacturing system is different for each of these situations and is tied to the type of system being built. For example, the manufacture of a single board computer would be vastly different from the manufacture of an automobile. Production involves the repeated building of the designed system. Multiple production cycles require the consideration of production machine maintenance and downtime.

Manufacturing and Production Engineering

Manufacturing and production engineering involves similar systems engineering processes specifically tailored to the building of the system. Manufacturability and producibility are the key attributes of a system that determine the ease of manufacturing and production. While manufacturability is simply the ease of manufacture, producibility also encompasses other dimensions of the production task, including packaging and shipping. Both these attributes can be improved by incorporating proper design decisions that take into account the entire system life cycle (Blanchard and Fabrycky 2005).

References

Works Cited

Maier, M., and E. Rechtin. 2002. The Art of Systems Architecting, 2nd ed. Boca Raton, FL, USA: CRC Press.

Blanchard, B.S., and W.J. Fabrycky. 2005. Systems Engineering and Analysis, 4th ed. Prentice-Hall International Series in Industrial and Systems Engineering. Englwood Cliffs, NJ, USA: Prentice-Hall.

Primary References

No primary references have been identified for version 0.75. Please provide any recommendations on additional references in your review.

Additional References

No additional references have been identified for version 0.75. Please provide any recommendations on additional references in your review.


< Previous Article | Parent Article | Next Article >

Comments from SEBok 0.5 Wiki

No comments were logged for this article in the SEBoK 0.5 wiki. Because of this, it is especially important for reviewers to provide feedback on this article. Please see the discussion prompts below.


SEBoK v. 1.9.1 released 30 September 2018

SEBoK Discussion

Please provide your comments and feedback on the SEBoK below. You will need to log in to DISQUS using an existing account (e.g. Yahoo, Google, Facebook, Twitter, etc.) or create a DISQUS account. Simply type your comment in the text field below and DISQUS will guide you through the login or registration steps. Feedback will be archived and used for future updates to the SEBoK. If you provided a comment that is no longer listed, that comment has been adjudicated. You can view adjudication for comments submitted prior to SEBoK v. 1.0 at SEBoK Review and Adjudication. Later comments are addressed and changes are summarized in the Letter from the Editor and Acknowledgements and Release History.

If you would like to provide edits on this article, recommend new content, or make comments on the SEBoK as a whole, please see the SEBoK Sandbox.

blog comments powered by Disqus