Difference between revisions of "Matrix of Implementation Examples"
(Byline) |
|||
(24 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
− | The following matrix maps the | + | ---- |
+ | '''''Lead Authors:''''' ''Heidi Davidz, Alice Squires, Tom Hilburn'', '''''Contributing Authors:''''' ''Alex Lee, John Brackett, Richard Turner'' | ||
+ | ---- | ||
+ | The following matrix maps the [[Systems Engineering Implementation Examples]] to topics in the [[SEBoK Table of Contents|Systems Engineering Body of Knowledge (SEBoK)]]. It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset are included here for clarity. For additional information, see the example of interest and the corresponding SEBoK topic. | ||
− | ==Organization and Mapping of | + | ==Organization and Mapping of Examples to the SEBoK== |
− | The following short titles shown in Table 1 | + | The following short titles shown in Table 1 are used for the implementation examples: |
{| align="center" | {| align="center" | ||
− | |+'''Table 1. Short Titles for the SEBoK | + | |+'''Table 1. Short Titles for the SEBoK Examples.''' (SEBoK Original) |
|- | |- | ||
! scope="col" colspan="2" | Case Studies | ! scope="col" colspan="2" | Case Studies | ||
Line 44: | Line 47: | ||
|'''CAS''' | |'''CAS''' | ||
|Complex Adaptive Operating System | |Complex Adaptive Operating System | ||
+ | |- | ||
+ | |'''PM''' | ||
+ | |Project Management | ||
+ | |- | ||
+ | |'''TS''' | ||
+ | |Taxi Service | ||
+ | |- | ||
+ | |'''TS''' | ||
+ | |Taxi Service | ||
+ | |- | ||
+ | |'''SWFTS''' | ||
+ | |SWFTS MBSE | ||
+ | |- | ||
+ | |'''Bag Handling''' | ||
+ | |Denver Airport Baggage Handling System | ||
+ | |- | ||
+ | |'''VA Sub''' | ||
+ | |Virginia Class Submarine | ||
+ | |- | ||
+ | |'''Route Mod''' | ||
+ | |UK West Coast Route Modernisation Project | ||
+ | |- | ||
+ | |'''Water Mgmt''' | ||
+ | |Singapore Water Management | ||
+ | |- | ||
+ | |'''FAA AAS''' | ||
+ | |FAA Advanced Automation System | ||
+ | |- | ||
+ | |'''Light Rail''' | ||
+ | |Standard Korean Light Transit System | ||
+ | |- | ||
+ | |'''TMT''' | ||
+ | |Thirty-Meter Telescope | ||
|} | |} | ||
− | Table 2 shows how the topics (each row) align with the | + | Table 2 shows how the topics (each row) align with the first set of implementation examples (each column): |
{| align="center" | {| align="center" | ||
− | |+'''Table 2. Implementation Examples.''' | + | |+'''Table 2. Implementation Examples based on published case studies.''' (SEBoK Original) |
− | !SEBoK Topic | + | !SEBoK Topic |
!BT | !BT | ||
!ATC | !ATC | ||
Line 63: | Line 99: | ||
!DfM | !DfM | ||
!CAS | !CAS | ||
+ | !PM | ||
+ | !TS | ||
+ | !SWFTS | ||
+ | !NHS | ||
|- | |- | ||
|[[Systems Thinking]] | |[[Systems Thinking]] | ||
Line 77: | Line 117: | ||
!X | !X | ||
!X | !X | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
|- | |- | ||
− | |Models and Simulation | + | |[[Representing Systems with Models|Models and Simulation]] |
| | | | ||
!X | !X | ||
Line 90: | Line 134: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
|- | |- | ||
Line 105: | Line 153: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[Service Systems Engineering]] | |[[Service Systems Engineering]] | ||
Line 119: | Line 171: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[Enterprise Systems Engineering]] | |[[Enterprise Systems Engineering]] | ||
Line 133: | Line 189: | ||
| | | | ||
| | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[Systems of Systems (SoS)]] | |[[Systems of Systems (SoS)]] | ||
Line 147: | Line 207: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[Life Cycle Models]] | |[[Life Cycle Models]] | ||
Line 161: | Line 225: | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
|- | |- | ||
|[[Business or Mission Analysis]] | |[[Business or Mission Analysis]] | ||
Line 172: | Line 240: | ||
!X | !X | ||
| | | | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
!X | !X | ||
| | | | ||
Line 188: | Line 260: | ||
!X | !X | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
|- | |- | ||
Line 202: | Line 278: | ||
!X | !X | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
|- | |- | ||
Line 215: | Line 295: | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 231: | Line 315: | ||
| | | | ||
!X | !X | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[System Implementation]] | |[[System Implementation]] | ||
Line 244: | Line 332: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 258: | Line 350: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 271: | Line 367: | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 285: | Line 385: | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 300: | Line 404: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 315: | Line 423: | ||
!X | !X | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[System Maintenance]] | |[[System Maintenance]] | ||
Line 329: | Line 441: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[Logistics]] | |[[Logistics]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 355: | Line 475: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
| | | | ||
| | | | ||
Line 369: | Line 493: | ||
!X | !X | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
| | | | ||
| | | | ||
Line 385: | Line 513: | ||
| | | | ||
!X | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Measurement]] | |[[Measurement]] | ||
Line 396: | Line 528: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 413: | Line 549: | ||
| | | | ||
!X | !X | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Configuration Management]] | |[[Configuration Management]] | ||
Line 427: | Line 567: | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Information Management]] | |[[Information Management]] | ||
Line 441: | Line 585: | ||
| | | | ||
!X | !X | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Quality Management]] | |[[Quality Management]] | ||
Line 454: | Line 602: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
| | | | ||
|- | |- | ||
Line 469: | Line 621: | ||
!X | !X | ||
!X | !X | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
+ | | | ||
|- | |- | ||
|[[Related Disciplines]] | |[[Related Disciplines]] | ||
Line 483: | Line 639: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
|} | |} | ||
− | + | Table 3 shows how the topics (each row) align with the second set of implementation examples (each column): | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
{| align="center" | {| align="center" | ||
− | |+'''Table | + | |+'''Table 3. Implementation Examples Developed for SEBoK.''' (SEBoK Original) |
!SEBoK Topic (Part 3) | !SEBoK Topic (Part 3) | ||
!Bag Handling | !Bag Handling | ||
Line 702: | Line 837: | ||
---- | ---- | ||
− | <center>[[Systems Engineering Implementation Examples|< Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[ | + | <center>[[Systems Engineering Implementation Examples|< Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[Implementation Examples|Next Article >]]</center> |
+ | |||
+ | <center>'''SEBoK v. 2.1, released 31 October 2019'''</center> | ||
[[Category: Part 7]] | [[Category: Part 7]] | ||
− |
Revision as of 14:46, 26 October 2019
Lead Authors: Heidi Davidz, Alice Squires, Tom Hilburn, Contributing Authors: Alex Lee, John Brackett, Richard Turner
The following matrix maps the Systems Engineering Implementation Examples to topics in the Systems Engineering Body of Knowledge (SEBoK). It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset are included here for clarity. For additional information, see the example of interest and the corresponding SEBoK topic.
Organization and Mapping of Examples to the SEBoK
The following short titles shown in Table 1 are used for the implementation examples:
Case Studies | |
---|---|
BT | Business Transformation |
ATC | NextGen Air Traffic Control |
NASA | NASA's Mission to Saturn |
HST | Hubble Space Telescope |
GPS | Global Positioning System |
GPS II | Global Positioning System II |
Radiation | Medical Radiation |
FBI VCF | FBI Virtual Case File System |
MSTI | Miniature Seeker Technology Integration |
Infusion Pump | Next Generation Medical Infusion Pump |
DfM | Design for Maintainability |
CAS | Complex Adaptive Operating System |
PM | Project Management |
TS | Taxi Service |
TS | Taxi Service |
SWFTS | SWFTS MBSE |
Bag Handling | Denver Airport Baggage Handling System |
VA Sub | Virginia Class Submarine |
Route Mod | UK West Coast Route Modernisation Project |
Water Mgmt | Singapore Water Management |
FAA AAS | FAA Advanced Automation System |
Light Rail | Standard Korean Light Transit System |
TMT | Thirty-Meter Telescope |
Table 2 shows how the topics (each row) align with the first set of implementation examples (each column):
Table 3 shows how the topics (each row) align with the second set of implementation examples (each column):
SEBoK Topic (Part 3) | Bag Handling | VA Sub | Route Mod | Water Mgmt | FAA AAS | Light Rail |
---|---|---|---|---|---|---|
Business or Mission Analysis | X | X | X | |||
Stakeholder Needs and Requirements | X | X | X | |||
System Requirements | X | X | X | |||
System Architecture | X | X | X | X | X | |
System Analysis | X | X | X | X | ||
System Implementation | X | |||||
System Integration | X | X | X | |||
System Verification | X | X | X | |||
System Validation | X | X | X | |||
System Deployment | X | |||||
Operation of the System | X | X | ||||
System Maintenance | X | |||||
Logistics | X | |||||
Planning | X | X | X | X | X | |
Assessment and Control | X | X | ||||
Risk Management | X | X | X | X | X | |
Measurement | X | |||||
Decision Management | X | X | X | |||
Configuration Management | X | X | X | |||
Information Management | X | |||||
Quality Management | X |
References
Works Cited
None.
Primary References
None.
Additional References
None.