The decision table in Table 2 provides criteria for deciding which of the four primary classes of incremental and evolutionary development to use, plus the choice of single-step development.
+
The Table 2 provides some criteria for deciding which of the four primary classes of incremental and evolutionary develop mentmodels to use, plus the choice of single-step development.
  
 
<center>
 
<center>

Revision as of 13:24, 29 August 2012

As discussed in Life Cycle Characteristics, there are many organizational factors which can impact which life cycle processes are appropriate for a specific system. In addition, technical factors will also influence the types of life cycle models appropriate for a given system. For example, system requirements can be predetermined or they can be changing, depending on the scope and nature of the development for a system. These considerations lead to different life cycle model selections. This article discusses different technical factors which can be considered when selecting a life cycle process model and provides example guidance and tools from the literature to support life cycle model selection. The life cycle model selected can impact all other aspects of system design and development. (See the knowledge areas (KA's) in Part 3 for a description of how the life cycle can impact systems engineering (SE) processes.)

Fixed-Requirements and Evolutionary Development Processes

Besides the traditional pre-specified, sequential, single-step development process, there are several models of incremental and evolutionary development. But there is no one-size-fits-all approach that is best for all situations. For rapid-fielding situations, an easiest-first, prototyping approach may be most appropriate. For enduring systems, an easiest-first approach may produce an unscalable system whose architecture is incompatible with achieving high levels of performance, safety, or security. In general, system evolution now requires much higher sustained levels of SE effort, earlier and continuous integration and testing, proactive approaches to address sources of system change, greater levels of concurrent engineering, and achievement reviews based on evidence of feasibility versus plans and system descriptions.

Incremental and evolutionary development methods have been in use since the 1960s (and perhaps earlier). They allow a project to provide an initial capability followed by successive deliveries to reach the desired system-of-interest (SoI). This is valuable when

  • rapid exploration and implementation of part of the system is desired;
  • the requirements are unclear from the beginning, or are rapidly changing;
  • funding is constrained;
  • the customer wishes to hold the SoI open to the possibility of inserting new technology when it becomes mature; and/or
  • experimentation is required to develop successive versions.

In iterative development, each cycle of the iteration subsumes the system elements of the previous iteration and adds new capabilities to the evolving product to create an expanded version of the software. Iterative development processes can provide the following advantages:

  • continuous integration, verification, and validation of the evolving product;
  • frequent demonstrations of progress;
  • early detection of defects;
  • early warning of process problems; and/or
  • systematic incorporation of the inevitable rework that occurs in software development.

Primary Models of Incremental and Evolutionary Development

The primary models of incremental and evolutionary development focus on different competitive and technical challenges. The time phasing of each model is shown in Figure 1 below in terms of the increment (1, 2, 3, …) content with respect to the Definition (Df), Development (Dv), and Production, Support, and Utilization (PSU) stages in Figure 1 (A Generic System Life Cycle Model) from the Life Cycle Models article.

Figure 1. Primary Models of Incremental and Evolutionary Development. (SEBoK Original)

The Figure 1 notations of Df1..N and Dv1..N indicate that their initial stages produce specifications not just for the first increment, but for the full set of increments. These are assumed to remain stable for the pre-specified sequential model, but are expected to involve changes for the evolutionary concurrent model. The latter’s notation of Dv1 and Df2R in the same time frame; PSU1, Dv2 and Df3R in the same time frame; etc. indicates that the plans and specifications for the next increment are being re-baselined by a systems engineering team concurrently with the development of the current increment and the PSU of the previous increment. This offloads the work of handling the change traffic from the development team and significantly improves its chances of finishing the current increment on budget and schedule.

In order to select an appropriate life cycle model, it is first important to understand the main archetypes and where they are best used. Table 1 summarizes each of the primary models of single-step, incremental and evolutionary development in terms of examples, strengths, and weaknesses, followed by explanatory notes.

Table 1. Primary Models of Incremental and Evolutionary Development (Boehm 2012; created for SEBoK).
Model Examples Pros Cons
Prespecified Single-Step Simple manufactured products: Nuts, bolts, simple sensors Efficient; easy to verify Difficulties with rapid change, emerging requirements (complex sensors; human-intensive systems)
Prespecified Multistep Vehicle platform plus value-adding pre-planned product improvements (PPPIs) Early initial capability, scalability when stable Emergent requirements or rapid change, architecture breakers
Evolutionary Sequential Small: Agile

Larger: Rapid fielding

Adaptability to change, smaller human-intensive systems Easiest-first; late, costly fixes; systems engineering time gaps; slow for large systems
Evolutionary Opportunistic Stable development; Maturing technology Mature technology upgrades Emergent requirements or rapid change; SysE time gaps
Evolutionary Concurrent Rapid, emergent development; Systems of systems Emergent requirements or rapid change; stable development increments, SysE continuity Overkill on small or highly stable systems

The "pre-specified single-step" and "pre-specified sequential" models from Table 1 are not evolutionary. Pre-specified sequential models split the development in order to field an early initial operational capability, followed by several pre-planned product improvements (P3Is). An alternate version splits up the work but does not field the intermediate increments. When requirements are well understood and stable, the pre-specified models enable a strong, predictable process. When requirements are emergent and/or rapidly changing, they often require expensive rework if they lead to undoing architectural commitments.

With the "evolutionary sequential" model, an initial operational capability for the system is rapidly developed and is upgraded based on operational experience. Pure agile software development fits this model: if something is wrong, it will be fixed in 30 days in the next release. Rapid fielding also fits this model for larger or hardware-software systems. Its major strength is to enable quick-response capabilities in the field. For pure agile, the model can fall prey to an easiest-first set of architectural commitments which break when, for example, system developers try to scale up the workload by a factor of ten, or to add security as a new feature in a later increment. For rapid fielding, using this model may prove expensive when the quick mashups require extensive rework to fix incompatibilities or to accommodate off-nominal usage scenarios, but the rapid results may be worth it.

"Evolutionary opportunistic" covers the special case of deferring the next increment until a sufficiently attractive opportunity arises, until the desired new technology is mature enough to be added, or until other enablers such as scarce components or key personnel become available. It is also appropriate for synchronizing upgrades of multiple commercial-off-the-shelf (COTS) products. It may be expensive to keep the SE and development teams together while waiting for the enablers, but again it may be worth it.

"Evolutionary concurrent" has a team of systems engineers concurrently handling the change traffic and re-baselining the plans and specifications for the next increment, in order to keep the current increment development stabilized. An example and discussion are provided in Table 2, below.

Incremental and Evolutionary Development Decision Table

The Table 2 provides some criteria for deciding which of the four primary classes of incremental and evolutionary develop mentmodels to use, plus the choice of single-step development.

Table 2. Incremental and Evolutionary Development Decision Table. (Boehm and Lane 2010). Reprinted with permission of the Systems Engineering Research Center.
Model Stable, pre-specifiable requirements? OK to wait for full system to be developed? Need to wait for next-increment priorities? Need to wait for next-increment enablers*?
Pre-specified Single Step Yes Yes
Pre-specified Multi- step Yes No
Evolutionary Sequential No No Yes
Evolutionary Opportunistic No No No Yes
Evolutionary Concurrent No No No No

*Example enablers: Technology maturity; External-system capabilities; Needed resources; New opportunities


The single-step-to-full-capability process exemplified by the traditional waterfall or sequential Vee model is appropriate if the product’s requirements are pre-specifiable and have a low probability of significant change; and if there is no value or chance to deliver a partial product capability. A good example would be the hardware for an earth resources monitoring satellite that would be infeasible to modify after it goes into orbit.

The pre-specified multistep process splits up the development in order to field an early initial operational capability and several pre-planned product improvements (P3Is). It is best if the product’s full capabilities can be specified in advance, and have a low probability of significant change; and if waiting for the full system to be developed incurs a loss of important and deliverable incremental mission capabilities. A good example would be a well-understood and well-prioritized sequence of software upgrades for the on-board earth resources monitoring satellite.

The evolutionary sequential process develops an initial operational capability and upgrades it based on operational experience, as exemplified by agile methods. It is best when there is a need to get operational feedback on an initial capability before defining and developing the next increment’s content. A good example would be the software upgrades suggested by experiences with the satellite’s payload, such as what kind of multispectral data collection and analysis capabilities are best for what kind of agriculture under what weather conditions.

The evolutionary opportunistic process defers the next increment until its new capabilities are available and mature enough to be added. It is best used when the increment does not need to wait for operational feedback, but it may need to wait for next-increment enablers such as technology maturity, external system capabilities, needed resources, or new value-adding opportunities. A good example would be the need to wait for agent-based satellite anomaly trend analysis and mission-adaptation software to become predictably stable before incorporating it into a scheduled increment.

The evolutionary concurrent process, as realized in the incremental commitment spiral model (Pew and Mavor 2007; Boehm and Lane 2007) and shown in Figure 2, has a continuing team of systems engineers handling the change traffic and re-baselining the plans and specifications for the next increment, while keeping a development team stabilized for on-time, high-assurance delivery of the current increment, and employing a concurrent verification and validation (V&V) team to perform continuous defect detection to enable even higher assurance levels. A good example would be the satellite’s ground-based mission control and data handling software’s next-increment re-baselining to adapt to new COTS releases and continuing user requests for data processing upgrades.

The satellite example shows that for the complex systems of the future, different parts of the system and its software may evolve in different ways, again indicating that there will be no one-size-fits-all process for software evolution. However, the decision table 2 can be quite helpful in determining which processes are the best fits for evolving each part of the system, and the three-team model in Figure 2 provides a way for projects to develop the challenging software-intensive systems of the future that will need both adaptability to rapid change and high levels of assurance.

Figure 2. Evolutionary-Concurrent Rapid Change Handling and High Assurance (Pew and Mavor 2007, Figure 2-6). Reprinted with permission from the National Academy of Sciences, Courtesy of National Academies Press, Washington, D.C..

References

Works Cited

Boehm, B. 2006. “Some Future Trends and Implications for Systems and Software Engineering Processes.” Systems Engineering. 9(1): 1-19.

Boehm, B. and J. Lane. 2007. “Using the Incremental Commitment Model to Integrate System Acquisition, Systems Engineering, and Software Engineering.” CrossTalk. October 2007: 4-9.

Boehm, B. and J. Lane. 2010. DoD Systems Engineering and Management Implications for Evolutionary Acquisition of Major Defense Systems. SERC RT-5 report, March 2010. USC-CSSE-2010-500.

Cusumano, M. and D. Yoffee. 1998. Competing on Internet Time: Lessons from Netscape and Its Battle with Microsoft. New York, NY, USA: Free Press.

Pew, R. and A. Mavor (eds.). 2007. Human-System Integration in the System Development Process: A New Look. Washington DC, USA: The National Academies Press.

Primary References

Pew, R., and A. Mavor (eds.). 2007. Human-System Integration in the System Development Process: A New Look. Washington, DC, USA: The National Academies Press.

Additional References

Boehm, B. 2006. “Some Future Trends and Implications for Systems and Software Engineering Processes.” Systems Engineering 9(1): 1-19.

Boehm, B. and J. Lane. 2007. “Using the Incremental Commitment Model to Integrate System Acquisition, Systems Engineering, and Software Engineering.” CrossTalk. October 2007: p. 4-9.

Boehm, B. and J. Lane. DoD Systems Engineering and Management Implications for Evolutionary Acquisition of Major Defense Systems. SERC RT-5 report, March 2010. USC-CSSE-2010-500.

Cusumano, M. and D. Yoffee. 1998. Competing on Internet Time: Lessons from Netscape and Its Battle with Microsoft. New York, NY, USA: Free Press.


< Previous Article | Parent Article | Next Article >


SEBoK v. 1.9.1 released 30 September 2018

SEBoK Discussion

Please provide your comments and feedback on the SEBoK below. You will need to log in to DISQUS using an existing account (e.g. Yahoo, Google, Facebook, Twitter, etc.) or create a DISQUS account. Simply type your comment in the text field below and DISQUS will guide you through the login or registration steps. Feedback will be archived and used for future updates to the SEBoK. If you provided a comment that is no longer listed, that comment has been adjudicated. You can view adjudication for comments submitted prior to SEBoK v. 1.0 at SEBoK Review and Adjudication. Later comments are addressed and changes are summarized in the Letter from the Editor and Acknowledgements and Release History.

If you would like to provide edits on this article, recommend new content, or make comments on the SEBoK as a whole, please see the SEBoK Sandbox.

blog comments powered by Disqus