Difference between revisions of "System Realization (glossary)"

From SEBoK
Jump to navigation Jump to search
Line 1: Line 1:
''<blockquote>The activities required to build a [[System (glossary)|system]], integrate disparate [[System Element (glossary)|system elements]], and ensure that a system both meets the needs of [[Stakeholder (glossary)|stakeholders]] and aligns with the [[Requirement (glossary)|requirements]] identified in the system definition stage. (Created for SEBoK)</blockquote>''
+
''<blockquote>The activities required to build a [[System (glossary)|system]], integrate disparate [[System Element (glossary)|system elements]], and ensure that a system both meets the needs of [[Stakeholder (glossary)|stakeholders]] and aligns with the [[Requirement (glossary)|requirements]] identified in the system definition stage.'' (Created for SEBoK)</blockquote>
  
 
====Source====
 
====Source====
This definition was developed for the SEBoK v. 1.0.
+
This definition was developed for the SEBoK.
  
 
===Discussion===
 
===Discussion===

Revision as of 02:53, 12 September 2012

The activities required to build a system, integrate disparate system elements, and ensure that a system both meets the needs of stakeholders and aligns with the requirements identified in the system definition stage. (Created for SEBoK)

Source

This definition was developed for the SEBoK.

Discussion

"System realization" is used in the SEBoK as a knowledge area (KA); it includes several systems engineering (SE) activities such as system implementation, integration, verification, and validation. (See System Realization KA.) This generally aligns with the "development" and "production" stages as discussed in the International Council on Systems Engineering (INCOSE) Systems Engineering Handbook (INCOSE 2012).

INCOSE. 2012. Systems Engineering Handbook: A Guide for System Life Cycle Processes and Activities, version 3.2.2. San Diego, CA, USA: International Council on Systems Engineering (INCOSE), INCOSE-TP-2003-002-03.2.2.

SEBoK v. 1.9.1 released 30 September 2018

SEBoK Discussion

Please provide your comments and feedback on the SEBoK below. You will need to log in to DISQUS using an existing account (e.g. Yahoo, Google, Facebook, Twitter, etc.) or create a DISQUS account. Simply type your comment in the text field below and DISQUS will guide you through the login or registration steps. Feedback will be archived and used for future updates to the SEBoK. If you provided a comment that is no longer listed, that comment has been adjudicated. You can view adjudication for comments submitted prior to SEBoK v. 1.0 at SEBoK Review and Adjudication. Later comments are addressed and changes are summarized in the Letter from the Editor and Acknowledgements and Release History.

If you would like to provide edits on this article, recommend new content, or make comments on the SEBoK as a whole, please see the SEBoK Sandbox.

blog comments powered by Disqus