Difference between revisions of "System Realization (glossary)"

From SEBoK
Jump to navigation Jump to search
m (Text replacement - "<center>'''SEBoK v. 2.6, released 20 May 2022'''</center>" to "<center>'''SEBoK v. 2.7, released 31 October 2022'''</center>")
(23 intermediate revisions by 7 users not shown)
Line 1: Line 1:
''<blockquote>Includes the activities required to build a [[System (glossary)]], integrate disparate system [[Element (glossary)|elements]], and ensure that the system both meets the needs of [[Stakeholder (glossary)|stakeholders]] and aligns with the [[Requirement (glossary)|requirements]] identified in the [[System Definition (glossary)]] stage.</blockquote>''
+
''<blockquote>The activities required to build a system, integrate disparate system elements, and ensure that a system both meets the needs of stakeholders and aligns with the requirements identified in the system definition stage.'' (Created for SEBoK)</blockquote>
  
====Source====
+
===Source===
This definition was developed for the SEBoK version 0.5.  ‘’Note to reviewers’’:  If you are aware of a more authoritative definition, please provide this information in your review.
+
This definition was developed for the SEBoK.
  
 
===Discussion===
 
===Discussion===
There is currently no discussion for this term. This will be completed for SEBoK version 1.0.
+
"System realization" is used in the SEBoK as a knowledge area (KA); it includes several systems engineering (SE) activities such as system implementation, integration, verification, and validation. (See [[System Realization]] KA.) This generally aligns with the "development" and "production" stages as discussed in the International Council on Systems Engineering (INCOSE) Systems Engineering Handbook (INCOSE 2012).
 +
 
 +
'''Work Cited'''
 +
 
 +
INCOSE. 2012. Systems Engineering Handbook: A Guide for System Life Cycle Processes and Activities, version 3.2.2. San Diego, CA, USA: International Council on Systems Engineering (INCOSE), INCOSE-TP-2003-002-03.2.2.
  
 
[[Category:Glossary of Terms]]
 
[[Category:Glossary of Terms]]
 +
<center>'''SEBoK v. 2.7, released 31 October 2022'''</center>

Revision as of 08:35, 10 October 2022

The activities required to build a system, integrate disparate system elements, and ensure that a system both meets the needs of stakeholders and aligns with the requirements identified in the system definition stage. (Created for SEBoK)

Source

This definition was developed for the SEBoK.

Discussion

"System realization" is used in the SEBoK as a knowledge area (KA); it includes several systems engineering (SE) activities such as system implementation, integration, verification, and validation. (See System Realization KA.) This generally aligns with the "development" and "production" stages as discussed in the International Council on Systems Engineering (INCOSE) Systems Engineering Handbook (INCOSE 2012).

Work Cited

INCOSE. 2012. Systems Engineering Handbook: A Guide for System Life Cycle Processes and Activities, version 3.2.2. San Diego, CA, USA: International Council on Systems Engineering (INCOSE), INCOSE-TP-2003-002-03.2.2.

SEBoK v. 2.7, released 31 October 2022