Difference between revisions of "Systems Engineering Plan Outline"
Jump to navigation
Jump to search
m (moved Systems Engineering Plan Preparation Guide to Systems Engineering Plan Outline: Title of referenced DoD material has been changed.) |
m (Text replacement - "SEBoK v. 2.9, released 13 November 2023" to "SEBoK v. 2.9, released 20 November 2023") |
||
(16 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
− | <blockquote>DoD. | + | <blockquote>DoD. 2011. ''Systems Engineering Plan Outline''. Washington, D.C., USA: Office of the Undersecretary of Defense (AT&L), U.S. Department of Defense (DoD).</blockquote> |
==Usage== | ==Usage== | ||
− | This source is considered a primary reference for the [[ | + | This source is considered a primary reference for the [[Procurement and Acquisition]] article. |
− | + | <center>'''SEBoK v. 2.9, released 20 November 2023'''</center> | |
− | |||
− | |||
− | |||
[[Category:Primary Reference]] | [[Category:Primary Reference]] |
Latest revision as of 22:11, 18 November 2023
DoD. 2011. Systems Engineering Plan Outline. Washington, D.C., USA: Office of the Undersecretary of Defense (AT&L), U.S. Department of Defense (DoD).
Usage
This source is considered a primary reference for the Procurement and Acquisition article.