Difference between revisions of "Control (glossary)"
(→Source) |
|||
Line 10: | Line 10: | ||
ISO/IEC/IEEE. 2010. ''Systems and Software Engineering -- Vocabulary (SEVocab)'' Geneva, Switzerland: International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC)/Institute of Electrical and Electronic Engineers (IEEE) 2009 ISO/IEC/IEEE 24765:2010 [database online]. Available from http://pascal.computer.org/sev_display/index.action. | ISO/IEC/IEEE. 2010. ''Systems and Software Engineering -- Vocabulary (SEVocab)'' Geneva, Switzerland: International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC)/Institute of Electrical and Electronic Engineers (IEEE) 2009 ISO/IEC/IEEE 24765:2010 [database online]. Available from http://pascal.computer.org/sev_display/index.action. | ||
+ | PMI. 2008. ''A Guide to the Project Management Body of Knowledge (PMBOK guide).'' 4th ed. Newtown Square, PA, USA: Project Management Institute (PMI). | ||
− | DAU. 2003. ''Risk Management Guide for DoD Acquisition.'' Fifth Edition. Version 2. Ft. Belvoir, VA, USA: Defense Acquisition University (DAU) Press. | + | |
+ | DAU. 2003. ''Risk Management Guide for DoD Acquisition.'' Fifth Edition. Version 2. Ft. Belvoir, VA, USA: Defense Acquisition University (DAU) Press. | ||
===Discussion=== | ===Discussion=== |
Revision as of 00:04, 17 September 2011
(1) In engineering, the monitoring of system output to compare with expected output and taking corrective action when the actual output does not match the expected output. (ISO/IEC 2010)
(2) In engineering, the monitoring of system output to compare with expected output and taking corrective action when the actual output does not match the expected output. (ISO/IEC 2010)
(3) comparing actual performance with planned performance, analyzing variances, assessing trends to effect process improvements, evaluating possible alternatives, and recommending appropriate corrective action as needed (PMI 2008); (4) in an IDEF0 model, a condition or set of conditions required for a function to produce correct output (IEEE 1320.2-1998 (R2004) IEEE, 2.1.32).
(4) in risk management, the formal name for the mitigation risk handling option. (DAU 2003a)
Source
ISO/IEC/IEEE. 2010. Systems and Software Engineering -- Vocabulary (SEVocab) Geneva, Switzerland: International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC)/Institute of Electrical and Electronic Engineers (IEEE) 2009 ISO/IEC/IEEE 24765:2010 [database online]. Available from http://pascal.computer.org/sev_display/index.action.
PMI. 2008. A Guide to the Project Management Body of Knowledge (PMBOK guide). 4th ed. Newtown Square, PA, USA: Project Management Institute (PMI).
DAU. 2003. Risk Management Guide for DoD Acquisition. Fifth Edition. Version 2. Ft. Belvoir, VA, USA: Defense Acquisition University (DAU) Press.
Discussion
There is currently no discussion for this term. This will be completed for SEBoK version 1.0.