Difference between revisions of "Matrix of Implementation Examples"
Line 61: | Line 61: | ||
|- | |- | ||
![[SEBoK 0.5 Introduction]] | ![[SEBoK 0.5 Introduction]] | ||
− | | | + | | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) | ||
Line 76: | Line 76: | ||
|- | |- | ||
![[Systems]] | ![[Systems]] | ||
− | | | + | | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) | ||
Line 106: | Line 106: | ||
|- | |- | ||
![[Mission Analysis and Stakeholders Requirements]] | ![[Mission Analysis and Stakeholders Requirements]] | ||
− | | | + | | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) | ||
Line 121: | Line 121: | ||
|- | |- | ||
![[System Requirements]] | ![[System Requirements]] | ||
− | + | !X | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) | ||
Line 136: | Line 136: | ||
|- | |- | ||
![[Architectural Design]] | ![[Architectural Design]] | ||
− | | | + | | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) | ||
Line 151: | Line 151: | ||
|- | |- | ||
![[System Analysis]] | ![[System Analysis]] | ||
− | | | + | | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) | ||
Line 166: | Line 166: | ||
|- | |- | ||
![[System Implementation]] | ![[System Implementation]] | ||
− | | | + | | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) | ||
Line 181: | Line 181: | ||
|- | |- | ||
![[System Integration]] | ![[System Integration]] | ||
− | + | !X | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) | ||
Line 196: | Line 196: | ||
|- | |- | ||
![[System Verification and Validation]] | ![[System Verification and Validation]] | ||
− | | | + | | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) | ||
Line 211: | Line 211: | ||
|- | |- | ||
![[System Deployment]] | ![[System Deployment]] | ||
− | | | + | | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) | ||
Line 226: | Line 226: | ||
|- | |- | ||
![[Operation of the System]] | ![[Operation of the System]] | ||
− | | | + | | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) | ||
Line 241: | Line 241: | ||
|- | |- | ||
![[System Maintenance]] | ![[System Maintenance]] | ||
− | | | + | | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) | ||
Line 256: | Line 256: | ||
|- | |- | ||
![[Logistics]] | ![[Logistics]] | ||
− | | | + | | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) | ||
Line 271: | Line 271: | ||
|- | |- | ||
![[Planning]] | ![[Planning]] | ||
− | + | !X | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) | ||
Line 286: | Line 286: | ||
|- | |- | ||
![[Assessment and Control]] | ![[Assessment and Control]] | ||
− | | | + | | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) | ||
Line 301: | Line 301: | ||
|- | |- | ||
![[Risk Management]] | ![[Risk Management]] | ||
− | + | !X | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) |
Revision as of 15:39, 8 July 2011
Below is a matrix with the implementation examples in this section and how they map to the knowledge areas in the SEBoK.
Abbreviations:
HST | Hubble Space Telescope Case Study |
GPS | Global Positioning System Case Study |
FBI VCF | FBI Virtual Case File Case Study |
ISS | International Space Station Case Study |
MSTI | MSTI Case Study |
Shuttle | Space Shuttle Case Study |
Light Rail (Korea) | Korean Light Rail Case Study |
Bag Handling | Denver Airport Baggage Handling System Vignette |
IDEF | GE Birth of IDEF Vignette |
VA Sub | Virginia Class Submarine Vignette |
Route Modernisation (UK) | UK West Coast Route Modernisation Project Vignette |
Water Mgt. (Singapore) | Singapore Water Management Vignette |
SEBoK Topic | HST | GPS | MedRad | FBI VCF | ISS | MSTI | Shuttle | Light Rail (Korea) | Bag Handling | IDEF | VA Sub | Route Modernization (UK) | Water Mgt. (Singapore) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
SEBoK 0.5 Introduction | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Systems | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Life Cycle Models | X | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
Mission Analysis and Stakeholders Requirements | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
System Requirements | X | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
Architectural Design | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
System Analysis | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
System Implementation | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
System Integration | X | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
System Verification and Validation | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
System Deployment | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Operation of the System | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
System Maintenance | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Logistics | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Planning | X | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
Assessment and Control | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Risk Management | X | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
SEBoK Topic 16 (insert link to article) | (HST) | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
SEBoK Topic 17 (insert link to article) | (HST) | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
SEBoK Topic 18 (insert link to article) | (HST) | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
SEBoK Topic 19 (insert link to article) | (HST) | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
SEBoK Topic 20 (insert link to article) | (HST) | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
SEBoK Topic 21 (insert link to article) | (HST) | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
References
Please make sure all references are listed alphabetically and are formatted according to the Chicago Manual of Style (15th ed). See the BKCASE Reference Guidance for additional information.
Citations
List all references cited in the article. Note: SEBoK 0.5 uses Chicago Manual of Style (15th ed). See the BKCASE Reference Guidance for additional information.
Primary References
All primary references should be listed in alphabetical order. Remember to identify primary references by creating an internal link using the ‘’’reference title only’’’ (title). Please do not include version numbers in the links.
Additional References
All additional references should be listed in alphabetical order.