Difference between revisions of "Matrix of Implementation Examples"
Line 376: | Line 376: | ||
|- | |- | ||
![[Quality Management]] | ![[Quality Management]] | ||
− | | | + | | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) | ||
Line 406: | Line 406: | ||
|- | |- | ||
![[Systems Engineering Standards]] | ![[Systems Engineering Standards]] | ||
− | | | + | | |
|(GPS) | |(GPS) | ||
|(MedRad) | |(MedRad) |
Revision as of 15:43, 8 July 2011
Below is a matrix with the implementation examples in this section and how they map to the knowledge areas in the SEBoK.
Abbreviations:
HST | Hubble Space Telescope Case Study |
GPS | Global Positioning System Case Study |
FBI VCF | FBI Virtual Case File Case Study |
ISS | International Space Station Case Study |
MSTI | MSTI Case Study |
Shuttle | Space Shuttle Case Study |
Light Rail (Korea) | Korean Light Rail Case Study |
Bag Handling | Denver Airport Baggage Handling System Vignette |
IDEF | GE Birth of IDEF Vignette |
VA Sub | Virginia Class Submarine Vignette |
Route Modernisation (UK) | UK West Coast Route Modernisation Project Vignette |
Water Mgt. (Singapore) | Singapore Water Management Vignette |
SEBoK Topic | HST | GPS | MedRad | FBI VCF | ISS | MSTI | Shuttle | Light Rail (Korea) | Bag Handling | IDEF | VA Sub | Route Modernization (UK) | Water Mgt. (Singapore) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
SEBoK 0.5 Introduction | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Systems | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Life Cycle Models | X | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
Mission Analysis and Stakeholders Requirements | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
System Requirements | X | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
Architectural Design | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
System Analysis | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
System Implementation | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
System Integration | X | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
System Verification and Validation | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
System Deployment | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Operation of the System | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
System Maintenance | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Logistics | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Planning | X | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
Assessment and Control | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Risk Management | X | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
Measurement | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Decision Management | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Configuration Management | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Information Management | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Quality Management | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Product and Service Life Management | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
Systems Engineering Standards | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) | |
SEBoK Topic LAST (insert link to article) | (HST) | (GPS) | (MedRad) | (FBI VCF) | (ISS) | (MSTI) | (Shuttle) | (Light Rail) | (Denver Air) | (IDEF) | (VA Sub) | (Rt. Mod. UK) | (Water Mgt. Singapore) |
References
Please make sure all references are listed alphabetically and are formatted according to the Chicago Manual of Style (15th ed). See the BKCASE Reference Guidance for additional information.
Citations
List all references cited in the article. Note: SEBoK 0.5 uses Chicago Manual of Style (15th ed). See the BKCASE Reference Guidance for additional information.
Primary References
All primary references should be listed in alphabetical order. Remember to identify primary references by creating an internal link using the ‘’’reference title only’’’ (title). Please do not include version numbers in the links.
Additional References
All additional references should be listed in alphabetical order.