Difference between revisions of "Integration and Test Strategies for Complex Manufacturing Machines"
Jump to navigation
Jump to search
m (Text replacement - "{{DISQUS}}" to "SEBoK v. 1.9.1 released 5 October 2018") |
m (Text replacement - "SEBoK v. 1.9.1 released 5 October 2018" to "<center>'''SEBoK v. 1.9.1, released 16 October 2018'''</center>") |
||
Line 7: | Line 7: | ||
This PhD thesis research project goal is to reduce the duration of the integration and test phase of large complex embedded systems. It uses a Wafer Scanner as an example. The work was performed at the Embedded Systems Institute in Eindhoven. | This PhD thesis research project goal is to reduce the duration of the integration and test phase of large complex embedded systems. It uses a Wafer Scanner as an example. The work was performed at the Embedded Systems Institute in Eindhoven. | ||
− | SEBoK v. 1.9.1 released | + | <center>'''SEBoK v. 1.9.1, released 16 October 2018'''</center> |
[[Category:Primary Reference]] | [[Category:Primary Reference]] |
Revision as of 01:11, 23 October 2018
de Jong, I. 2008. Integration and Test Strategies for Complex Manufacturing Machines: Integration and Testing Combined in a Single Planning and Optimization Framework. Saarbrücken, Germany: Verlag.
Usage
This source is considered a primary reference for the Business Activities Related to Product Systems Engineering articles.
Annotation
This PhD thesis research project goal is to reduce the duration of the integration and test phase of large complex embedded systems. It uses a Wafer Scanner as an example. The work was performed at the Embedded Systems Institute in Eindhoven.