Below is a matrix which maps the SEBoK [[Systems Engineering Implementation Examples]] to knowledge areas in the [[SEBoK 0.5 Outline|Systems Engineering Body of Knowledge]]. The matrix provides both a list of potential systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example.  Since the number of topics in the SEBoK is extensive, only a subset are included here for clarity.  See the implementation example of interest and the corresponding SEBoK topic for more specifics on the illustration of the topic.
+
----
 +
'''''Lead Authors:''''' ''Heidi Davidz, Alice Squires, Tom Hilburn'', '''''Contributing Authors:''''' ''Alex Lee, John Brackett, Richard Turner''
 +
----
 +
The following matrix maps the [[Systems Engineering Implementation Examples]] to topics in the [[SEBoK Table of Contents|Systems Engineering Body of Knowledge (SEBoK)]]. It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example.  Since the number of topics in the SEBoK is extensive, only a subset is included here for clarity.  For additional information, see the example of interest and the corresponding SEBoK topic.
  
 
+
==Organization and Mapping of Examples to the SEBoK==
Since space is limited in the matrix, here are the abbreviations used for the implementation examples:
+
The following short titles shown in Table 1 are used for the implementation examples:  
{|
+
 +
{| align="center"
 +
|+'''Table 1.  Short Titles for the SEBoK Examples.'''  (SEBoK Original)
 +
|-
 +
! scope="col" colspan="2" | Case Studies
 +
|-
 +
|'''BT'''
 +
|Business Transformation
 +
|-
 +
|'''ATC'''
 +
|NextGen Air Traffic Control
 +
|-
 +
|'''NASA'''
 +
| NASA's Mission to Saturn
 +
|-
 +
|'''HST'''
 +
|Hubble Space Telescope
 +
|-
 +
|'''GPS'''
 +
|Global Positioning System
 +
|-
 +
|'''GPS II'''
 +
|Global Positioning System II
 +
|-
 +
|'''Radiation'''
 +
|Medical Radiation
 +
|-
 +
|'''FBI VCF'''
 +
|FBI Virtual Case File System
 
|-
 
|-
|HST
+
|'''MSTI'''
|Hubble Space Telescope Case Study
+
|Miniature Seeker Technology Integration
 
|-
 
|-
|GPS
+
|'''Infusion Pump'''
|Global Positioning System Case Study
+
|Next Generation Medical Infusion Pump
 
|-
 
|-
|Radiation
+
|'''DfM'''
|Medical Radiation Case Study
+
|Design for Maintainability
 
|-
 
|-
|FBI VCF
+
|'''CAS'''
|FBI Virtual Case File Case Study
+
|Complex Adaptive Operating System
 
|-
 
|-
|MSTI
+
|'''PM'''
|MSTI Case Study
+
|Project Management
 
|-
 
|-
|Infusion Pump
+
|'''TS'''
|Next Generation Medical Infusion Pump Case Study
+
|Taxi Service
 
|-
 
|-
|Bag Handling
+
|'''SWFTS'''
|Denver Airport Baggage Handling System Vignette
+
|SWFTS MBSE
 
|-
 
|-
|IDEF
+
|'''Bag Handling'''
|GE Birth of IDEF Vignette
+
|Denver Airport Baggage Handling System
 
|-
 
|-
|VA Sub
+
|'''VA Sub'''
|Virginia Class Submarine Vignette
+
|Virginia Class Submarine
 
|-
 
|-
|Route Mod
+
|'''Route Mod'''
|UK West Coast Route Modernisation Project Vignette
+
|UK West Coast Route Modernisation Project
 
|-
 
|-
|Water Mgmt
+
|'''Water Mgmt'''
|Singapore Water Management Vignette
+
|Singapore Water Management
 
|-
 
|-
|FAA AAS
+
|'''FAA AAS'''
|FAA AAS Vignette
+
|FAA Advanced Automation System
 
|-
 
|-
|Light Rail
+
|'''Light Rail'''
|Korean Light Rail Vignette
+
|Standard Korean Light Transit System
 
|-
 
|-
 +
|'''TMT'''
 +
|Thirty-Meter Telescope
 
|}
 
|}
  
 +
Table 2 shows how the topics (each row) align with the first set of implementation examples (each column):
  
{|
+
{| align="center"
|+'''Implementation Examples.''' Coverage of SEBoK Topics for Each Case Study and Vignette.
+
|+'''Table 2. Implementation Examples based on published case studies.''' (SEBoK Original)
 
!SEBoK Topic
 
!SEBoK Topic
![[Hubble Space Telescope Case Study|HST]]
+
!BT
![[Global Positioning System Case Study|GPS]]
+
!ATC
![[Medical Radiation Case Study|Radiation]]
+
!NASA
![[FBI Virtual Case File System Case Study|FBI VCF]]
+
!HST
![[MSTI Case Study|MSTI]]
+
!GPS
![[Next Generation Medical Infusion Pump Case Study|Infusion Pump]]
+
!GPS II
![[Denver Airport Baggage Handling System Vignette|Bag Handling]]
+
!Radiation
![[GE Birth of IDEF Vignette|IDEF]]
+
!FBI VCF
![[Virginia Class Submarine Vignette|VA Sub]]
+
!MSTI
![[UK West Coast Route Modernisation Project Vignette|Route Mod]]
+
!Infusion Pump
![[Singapore Water Management Vignette|Water Mgmt]]
+
!DfM
![[FAA AAS Vignette|FAA AAS]]
+
!CAS
![[Korean Light Rail Case Study|Light Rail]]
+
!PM
 +
!TS
 +
!SWFTS
 +
!NHS
 
|-
 
|-
![[Systems]]
+
|[[Systems Thinking]]
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 
|
 
|
 +
!X
 +
!X
 +
!X
 +
!X
 +
!X
 +
!X
 
!X
 
!X
 
|
 
|
 
|
 
|
 +
|-
 +
|[[Representing Systems with Models|Models and Simulation]]
 +
|
 +
!X
 +
!X
 
|
 
|
 
|
 
|
 
!X
 
!X
 
|
 
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
!X
 +
!X
 +
!X
 
|
 
|
 
|-
 
|-
![[Systems Thinking]]
+
|[[Product Systems Engineering]]
 +
|
 +
|
 +
|
 +
!X
 +
!X
 +
|
 +
!X
 +
!X
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 86: Line 154:
 
|
 
|
 
!X
 
!X
 +
|-
 +
|[[Service Systems Engineering]]
 +
|
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 +
!X
 +
|
 
|
 
|
 
|
 
|
Line 93: Line 168:
 
|
 
|
 
|
 
|
 +
|
 +
!X
 +
|
 +
!X
 
|-
 
|-
![[Life Cycle Models]]
+
|[[Enterprise Systems Engineering]]
 +
!X
 +
!X
 +
!X
 +
|
 +
|
 
!X
 
!X
 +
|
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 101: Line 188:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
!X
 +
|-
 +
|[[Systems of Systems (SoS)]]
 +
!X
 +
!X
 +
|
 +
|
 +
|
 +
!X
 +
|
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 109: Line 209:
 
!X
 
!X
 
|-
 
|-
![[Mission Analysis and Stakeholders Requirements]]
+
|[[Life Cycle Models]]
 +
!X
 +
|
 +
|
 +
!X
 +
!X
 
|
 
|
 +
|
 +
|
 +
!X
 +
!X
 +
!X
 +
!X
 
|
 
|
 
|
 
|
 
!X
 
!X
 
|
 
|
 +
|-
 +
|[[Business or Mission Analysis]]
 +
!X
 
!X
 
!X
 
|
 
|
Line 120: Line 234:
 
|
 
|
 
!X
 
!X
 +
|
 
!X
 
!X
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 +
!X
 +
!X
 +
|
 +
|
 
|-
 
|-
![[System Requirements]]
+
|[[Stakeholder Needs Definition]]
 
!X
 
!X
 
!X
 
!X
Line 135: Line 256:
 
|
 
|
 
!X
 
!X
 +
|
 
|
 
|
 
!X
 
!X
 
!X
 
!X
 +
!X
 +
|
 
|-
 
|-
![[Architectural Design]]
+
|[[System Requirements]]
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
!X
 
!X
 
|
 
|
 
!X
 
!X
 +
|
 
|
 
|
 
!X
 
!X
 
!X
 
!X
 
!X
 
!X
 +
|
 
|-
 
|-
![[System Analysis]]
+
|[[System Architecture Design Definition]]
 +
!X
 +
!X
 +
|
 
|
 
|
 +
!X
 
!X
 
!X
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|[[System Analysis]]
 
|
 
|
 
|
 
|
 
!X
 
!X
 +
|
 
!X
 
!X
 +
|
 +
|
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 168: Line 314:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
![[System Implementation]]
+
|[[System Implementation]]
 +
|
 +
|
 +
|
 
|
 
|
 
!X
 
!X
Line 177: Line 328:
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
 +
|-
 +
|[[System Integration]]
 +
!X
 
|
 
|
 
!X
 
!X
|-
 
![[System Integration]]
 
 
!X
 
!X
 
!X
 
!X
 +
!X
 +
|
 
|
 
|
 +
!X
 
|
 
|
 
!X
 
!X
 
|
 
|
 
!X
 
!X
 +
!X
 +
|
 
|
 
|
 +
|-
 +
|[[System Verification]]
 
|
 
|
 
|
 
|
Line 198: Line 359:
 
|
 
|
 
!X
 
!X
|-
 
![[System Verification and Validation]]
 
 
|
 
|
!X
 
 
!X
 
!X
 
|
 
|
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|[[System Validation]]
 
!X
 
!X
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 +
!X
 
|
 
|
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 
|-
 
|-
![[System Deployment]]
+
|[[System Deployment]]
 
|
 
|
 +
|
 +
|
 +
|
 +
!X
 
!X
 
!X
 
|
 
|
Line 221: Line 400:
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
Line 226: Line 406:
 
|
 
|
 
|
 
|
|
 
!X
 
 
|-
 
|-
![[Operation of the System]]
+
|[[Operation of the System]]
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 
!X
 
!X
 
|
 
|
 
|
 
|
 +
|
 +
!X
 +
!X
 
|
 
|
 
|
 
|
Line 244: Line 425:
 
!X
 
!X
 
|-
 
|-
![[System Maintenance]]
+
|[[System Maintenance]]
 +
|
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 259: Line 443:
 
!X
 
!X
 
|-
 
|-
![[Logistics]]
+
|[[Logistics]]
 +
|
 +
|
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 266: Line 454:
 
|
 
|
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
Line 274: Line 461:
 
|
 
|
 
|-
 
|-
![[Planning]]
+
|[[Planning]]
 +
!X
 +
!X
 +
|
 
!X
 
!X
 +
|
 
|
 
|
 
|
 
|
Line 281: Line 472:
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 
!X
 
!X
 
|
 
|
 
|
 
|
 +
|
 +
|-
 +
|[[Assessment and Control]]
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
!X
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 +
|
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
![[Assessment and Control]]
+
|[[Risk Management]]
 
|
 
|
 
|
 
|
Line 295: Line 503:
 
!X
 
!X
 
!X
 
!X
 +
!X
 +
!X
 +
!X
 +
|
 +
!X
 +
|
 +
!X
 +
!X
 +
|
 +
|
 +
|
 +
|-
 +
|[[Measurement]]
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 302: Line 525:
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|[[Decision Management]]
 
!X
 
!X
|-
+
|
![[Risk Management]]
+
|
 +
|
 +
|
 +
|
 +
|
 +
|
 
!X
 
!X
 +
|
 +
|
 
!X
 
!X
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 +
|-
 +
|[[Configuration Management]]
 +
|
 +
|
 +
|
 
|
 
|
 
!X
 
!X
Line 315: Line 561:
 
|
 
|
 
!X
 
!X
 +
|
 
!X
 
!X
 
!X
 
!X
!X
 
|-
 
![[Measurement]]
 
 
|
 
|
 
|
 
|
 +
|
 +
|
 +
|-
 +
|[[Information Management]]
 
|
 
|
 
|
 
|
 
!X
 
!X
 +
|
 
|
 
|
 
|
 
|
Line 333: Line 582:
 
|
 
|
 
!X
 
!X
 +
!X
 +
!X
 +
|
 +
|
 
|-
 
|-
![[Decision Management]]
+
|[[Quality Management]]
 +
|
 +
|
 
|
 
|
 
|
 
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
!X
 +
|
 +
|-
 +
|[[Enabling Systems Engineering]]
 
|
 
|
 
|
 
|
 
!X
 
!X
 
|
 
|
 +
!X
 
!X
 
!X
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 +
!X
 
!X
 
!X
 
!X
 
!X
 
|
 
|
 +
!X
 
|
 
|
 
|-
 
|-
![[Configuration Management]]
+
|[[Related Disciplines]]
 +
|
 +
|
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 +
!X
 
|
 
|
 
!X
 
!X
Line 359: Line 638:
 
|
 
|
 
|
 
|
!X
 
 
|
 
|
!X
 
 
|
 
|
 +
|}
 +
 +
 +
Table 3 shows how the topics (each row) align with the second set of implementation examples (each column):
 +
 +
{| align="center"
 +
|+'''Table 3. Implementation Examples Developed for SEBoK.''' (SEBoK Original)
 +
!SEBoK Topic (Part 3)
 +
!Bag Handling
 +
!VA Sub
 +
!Route Mod
 +
!Water Mgmt
 +
!FAA AAS
 +
!Light Rail
 
|-
 
|-
![[Information Management]]
+
|[[Business or Mission Analysis]]
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 
|
 
|
 +
!X
 +
|-
 +
|[[Stakeholder Needs Definition]]
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 
|
 
|
 +
!X
 +
|-
 +
|[[System Requirements]]
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 +
!X
 +
!X
 +
|-
 +
|[[System Architecture Design Definition]]
 +
!X
 
!X
 
!X
 
|
 
|
 +
!X
 +
!X
 +
!X
 +
|-
 +
|[[System Analysis]]
 +
!X
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 +
!X
 
|-
 
|-
![[Quality Management]]
+
|[[System Implementation]]
 
|
 
|
 
|
 
|
Line 385: Line 701:
 
|
 
|
 
|
 
|
 +
!X
 +
|-
 +
|[[System Integration]]
 +
!X
 
|
 
|
 
|
 
|
 +
!X
 +
|
 +
!X
 +
|-
 +
|[[System Verification]]
 +
!X
 
|
 
|
 
|
 
|
 
|
 
|
 
!X
 
!X
 +
!X
 +
|-
 +
|[[System Validation]]
 +
!X
 +
|
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 
|-
 
|-
![[Product and Service Life Management]]
+
|[[System Deployment]]
 +
|
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
 
|
 
|
 
!X
 
!X
|
+
|-
 +
|[[Operation of the System]]
 
|
 
|
 
|
 
|
Line 409: Line 743:
 
!X
 
!X
 
|-
 
|-
![[Systems Engineering Standards]]
+
|[[System Maintenance]]
|
 
 
|
 
|
 
|
 
|
Line 416: Line 749:
 
|
 
|
 
|
 
|
 +
!X
 +
|-
 +
|[[Logistics]]
 +
!X
 
|
 
|
 
|
 
|
Line 421: Line 758:
 
|
 
|
 
|
 
|
 +
|-
 +
|[[Planning]]
 +
!X
 
|
 
|
 +
!X
 +
!X
 +
!X
 
!X
 
!X
 
|-
 
|-
![[Enabling Systems Engineering|SE Workforce]]
+
|[[Assessment and Control]]
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 +
|-
 +
|[[Risk Management]]
 
!X
 
!X
 
|
 
|
|
 
 
!X
 
!X
 +
!X
 +
!X
 +
!X
 +
|-
 +
|[[Measurement]]
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 +
|
 +
!X
 +
|-
 +
|[[Decision Management]]
 +
!X
 +
|
 +
!X
 +
!X
 
|
 
|
 
|
 
|
 
|-
 
|-
![[Systems Engineering and Software Engineering|Software Engineering]]
+
|[[Configuration Management]]
 +
 
 +
!X
 
|
 
|
 +
!X
 
|
 
|
 +
!X
 
|
 
|
 +
|-
 +
|[[Information Management]]
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
 
|
 
|
 +
|-
 +
|[[Quality Management]]
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
|-}
+
|}
  
 
==References==  
 
==References==  
 
+
===Works Cited===
===Citations===
+
None.
None
 
 
 
 
===Primary References===
 
===Primary References===
None
+
None.
 
 
 
===Additional References===
 
===Additional References===
None
+
None.
  
 
----
 
----
====Article Discussion====
+
<center>[[Systems Engineering Implementation Examples|< Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[Implementation Examples|Next Article >]]</center>
[[{{TALKPAGENAME}}|[Go to discussion page]]]
 
<center>[[Systems Engineering Implementation Examples|<- Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[Case Studies|Next Article ->]]</center>
 
  
==Signatures==
+
<center>'''SEBoK v. 2.10, released 06 May 2024'''</center>
  
[[Category: Part 7]][[Category:Knowledge Area]]--[[User:Hdavidz|Hdavidz]] 23:14, 14 August 2011 (UTC)
+
[[Category: Part 7]]

Latest revision as of 22:08, 2 May 2024


Lead Authors: Heidi Davidz, Alice Squires, Tom Hilburn, Contributing Authors: Alex Lee, John Brackett, Richard Turner


The following matrix maps the Systems Engineering Implementation Examples to topics in the Systems Engineering Body of Knowledge (SEBoK). It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset is included here for clarity. For additional information, see the example of interest and the corresponding SEBoK topic.

Organization and Mapping of Examples to the SEBoK

The following short titles shown in Table 1 are used for the implementation examples:

Table 1. Short Titles for the SEBoK Examples. (SEBoK Original)
Case Studies
BT Business Transformation
ATC NextGen Air Traffic Control
NASA NASA's Mission to Saturn
HST Hubble Space Telescope
GPS Global Positioning System
GPS II Global Positioning System II
Radiation Medical Radiation
FBI VCF FBI Virtual Case File System
MSTI Miniature Seeker Technology Integration
Infusion Pump Next Generation Medical Infusion Pump
DfM Design for Maintainability
CAS Complex Adaptive Operating System
PM Project Management
TS Taxi Service
SWFTS SWFTS MBSE
Bag Handling Denver Airport Baggage Handling System
VA Sub Virginia Class Submarine
Route Mod UK West Coast Route Modernisation Project
Water Mgmt Singapore Water Management
FAA AAS FAA Advanced Automation System
Light Rail Standard Korean Light Transit System
TMT Thirty-Meter Telescope

Table 2 shows how the topics (each row) align with the first set of implementation examples (each column):

Table 2. Implementation Examples based on published case studies. (SEBoK Original)
SEBoK Topic BT ATC NASA HST GPS GPS II Radiation FBI VCF MSTI Infusion Pump DfM CAS PM TS SWFTS NHS
Systems Thinking X X X X X X X X X
Models and Simulation X X X X X X
Product Systems Engineering X X X X X
Service Systems Engineering X X X X
Enterprise Systems Engineering X X X X X X X
Systems of Systems (SoS) X X X X X
Life Cycle Models X X X X X X X X
Business or Mission Analysis X X X X X X X
Stakeholder Needs Definition X X X X X X X X X
System Requirements X X X X X X X
System Architecture Design Definition X X X X X X
System Analysis X X X X X
System Implementation X X X
System Integration X X X X X X X X X
System Verification X X X X X
System Validation X X X X X X
System Deployment X X X
Operation of the System X X X X X X
System Maintenance X
Logistics
Planning X X X X X X
Assessment and Control X X X X X
Risk Management X X X X X X X X X
Measurement X
Decision Management X X X X X
Configuration Management X X X X X
Information Management X X X X
Quality Management X
Enabling Systems Engineering X X X X X X X X X
Related Disciplines X X X X X


Table 3 shows how the topics (each row) align with the second set of implementation examples (each column):

Table 3. Implementation Examples Developed for SEBoK. (SEBoK Original)
SEBoK Topic (Part 3) Bag Handling VA Sub Route Mod Water Mgmt FAA AAS Light Rail
Business or Mission Analysis X X X
Stakeholder Needs Definition X X X
System Requirements X X X
System Architecture Design Definition X X X X X
System Analysis X X X X
System Implementation X
System Integration X X X
System Verification X X X
System Validation X X X
System Deployment X
Operation of the System X X
System Maintenance X
Logistics X
Planning X X X X X
Assessment and Control X X
Risk Management X X X X X
Measurement X
Decision Management X X X
Configuration Management X X X
Information Management X
Quality Management X