Difference between revisions of "Matrix of Implementation Examples"
m (Text replacement - "SEBoK v. 2.9, released 20 November 2023" to "SEBoK v. 2.10, released 06 May 2024") |
|||
(45 intermediate revisions by 6 users not shown) | |||
Line 1: | Line 1: | ||
− | The following matrix maps the | + | ---- |
+ | '''''Lead Authors:''''' ''Heidi Davidz, Alice Squires, Tom Hilburn'', '''''Contributing Authors:''''' ''Alex Lee, John Brackett, Richard Turner'' | ||
+ | ---- | ||
+ | The following matrix maps the [[Systems Engineering Implementation Examples]] to topics in the [[SEBoK Table of Contents|Systems Engineering Body of Knowledge (SEBoK)]]. It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset is included here for clarity. For additional information, see the example of interest and the corresponding SEBoK topic. | ||
− | ==Organization and Mapping of | + | ==Organization and Mapping of Examples to the SEBoK== |
− | The following short titles shown in Table 1 | + | The following short titles shown in Table 1 are used for the implementation examples: |
{| align="center" | {| align="center" | ||
− | |+'''Table 1. Short Titles for the SEBoK | + | |+'''Table 1. Short Titles for the SEBoK Examples.''' (SEBoK Original) |
|- | |- | ||
! scope="col" colspan="2" | Case Studies | ! scope="col" colspan="2" | Case Studies | ||
Line 41: | Line 44: | ||
|'''DfM''' | |'''DfM''' | ||
|Design for Maintainability | |Design for Maintainability | ||
− | |||
− | |||
− | |||
|- | |- | ||
|'''CAS''' | |'''CAS''' | ||
|Complex Adaptive Operating System | |Complex Adaptive Operating System | ||
+ | |- | ||
+ | |'''PM''' | ||
+ | |Project Management | ||
+ | |- | ||
+ | |'''TS''' | ||
+ | |Taxi Service | ||
+ | |- | ||
+ | |'''SWFTS''' | ||
+ | |SWFTS MBSE | ||
+ | |- | ||
+ | |'''Bag Handling''' | ||
+ | |Denver Airport Baggage Handling System | ||
+ | |- | ||
+ | |'''VA Sub''' | ||
+ | |Virginia Class Submarine | ||
+ | |- | ||
+ | |'''Route Mod''' | ||
+ | |UK West Coast Route Modernisation Project | ||
+ | |- | ||
+ | |'''Water Mgmt''' | ||
+ | |Singapore Water Management | ||
+ | |- | ||
+ | |'''FAA AAS''' | ||
+ | |FAA Advanced Automation System | ||
+ | |- | ||
+ | |'''Light Rail''' | ||
+ | |Standard Korean Light Transit System | ||
+ | |- | ||
+ | |'''TMT''' | ||
+ | |Thirty-Meter Telescope | ||
|} | |} | ||
− | Table 2 shows how the topics (each row) align with the | + | Table 2 shows how the topics (each row) align with the first set of implementation examples (each column): |
{| align="center" | {| align="center" | ||
− | |+'''Table 2. Implementation Examples.''' | + | |+'''Table 2. Implementation Examples based on published case studies.''' (SEBoK Original) |
− | !SEBoK Topic | + | !SEBoK Topic |
!BT | !BT | ||
!ATC | !ATC | ||
Line 65: | Line 95: | ||
!Infusion Pump | !Infusion Pump | ||
!DfM | !DfM | ||
− | |||
!CAS | !CAS | ||
+ | !PM | ||
+ | !TS | ||
+ | !SWFTS | ||
+ | !NHS | ||
|- | |- | ||
|[[Systems Thinking]] | |[[Systems Thinking]] | ||
Line 73: | Line 106: | ||
| | | | ||
| | | | ||
+ | !X | ||
+ | !X | ||
| | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
| | | | ||
+ | |- | ||
+ | |[[Representing Systems with Models|Models and Simulation]] | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
| | | | ||
| | | | ||
Line 81: | Line 131: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
|- | |- | ||
Line 87: | Line 141: | ||
| | | | ||
| | | | ||
− | + | !X | |
− | + | !X | |
| | | | ||
+ | !X | ||
+ | !X | ||
| | | | ||
| | | | ||
Line 97: | Line 153: | ||
| | | | ||
| | | | ||
+ | !X | ||
|- | |- | ||
|[[Service Systems Engineering]] | |[[Service Systems Engineering]] | ||
Line 104: | Line 161: | ||
| | | | ||
| | | | ||
− | | | + | !X |
+ | | | ||
| | | | ||
| | | | ||
Line 111: | Line 169: | ||
| | | | ||
| | | | ||
+ | !X | ||
| | | | ||
+ | !X | ||
|- | |- | ||
|[[Enterprise Systems Engineering]] | |[[Enterprise Systems Engineering]] | ||
Line 119: | Line 179: | ||
| | | | ||
| | | | ||
− | + | !X | |
| | | | ||
| | | | ||
Line 126: | Line 186: | ||
| | | | ||
| | | | ||
+ | !X | ||
+ | !X | ||
| | | | ||
+ | !X | ||
|- | |- | ||
|[[Systems of Systems (SoS)]] | |[[Systems of Systems (SoS)]] | ||
Line 134: | Line 197: | ||
| | | | ||
| | | | ||
− | | | + | !X |
+ | | | ||
| | | | ||
| | | | ||
Line 141: | Line 205: | ||
| | | | ||
| | | | ||
+ | !X | ||
| | | | ||
+ | !X | ||
|- | |- | ||
|[[Life Cycle Models]] | |[[Life Cycle Models]] | ||
Line 147: | Line 213: | ||
| | | | ||
| | | | ||
− | + | !X | |
− | + | !X | |
− | |||
− | |||
| | | | ||
| | | | ||
| | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
| | | | ||
+ | !X | ||
| | | | ||
|- | |- | ||
Line 164: | Line 233: | ||
| | | | ||
| | | | ||
− | + | !X | |
| | | | ||
!X | !X | ||
Line 170: | Line 239: | ||
!X | !X | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
| | | | ||
| | | | ||
|- | |- | ||
− | |[[Stakeholder Needs | + | |[[Stakeholder Needs Definition]] |
!X | !X | ||
!X | !X | ||
| | | | ||
− | + | !X | |
| | | | ||
− | + | !X | |
| | | | ||
!X | !X | ||
Line 185: | Line 257: | ||
!X | !X | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
!X | !X | ||
| | | | ||
Line 200: | Line 275: | ||
!X | !X | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
!X | !X | ||
| | | | ||
|- | |- | ||
− | |[[System Architecture]] | + | |[[System Architecture Design Definition]] |
!X | !X | ||
!X | !X | ||
Line 209: | Line 287: | ||
| | | | ||
!X | !X | ||
− | + | !X | |
| | | | ||
| | | | ||
Line 215: | Line 293: | ||
!X | !X | ||
| | | | ||
− | + | | | |
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 229: | Line 310: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
| | | | ||
− | |||
|- | |- | ||
|[[System Implementation]] | |[[System Implementation]] | ||
Line 242: | Line 326: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
| | | | ||
| | | | ||
Line 254: | Line 341: | ||
!X | !X | ||
!X | !X | ||
− | | | + | !X |
+ | | | ||
| | | | ||
+ | !X | ||
| | | | ||
!X | !X | ||
| | | | ||
+ | !X | ||
!X | !X | ||
| | | | ||
Line 275: | Line 365: | ||
!X | !X | ||
| | | | ||
− | + | | | |
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 284: | Line 377: | ||
| | | | ||
!X | !X | ||
− | + | !X | |
!X | !X | ||
| | | | ||
Line 290: | Line 383: | ||
!X | !X | ||
| | | | ||
− | + | | | |
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 299: | Line 395: | ||
| | | | ||
!X | !X | ||
− | + | !X | |
| | | | ||
| | | | ||
Line 305: | Line 401: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 314: | Line 413: | ||
| | | | ||
!X | !X | ||
− | + | !X | |
| | | | ||
| | | | ||
Line 322: | Line 421: | ||
| | | | ||
| | | | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[System Maintenance]] | |[[System Maintenance]] | ||
Line 337: | Line 439: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[Logistics]] | |[[Logistics]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 364: | Line 472: | ||
| | | | ||
!X | !X | ||
+ | | | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 378: | Line 489: | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
| | | | ||
| | | | ||
+ | !X | ||
!X | !X | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 389: | Line 503: | ||
!X | !X | ||
!X | !X | ||
− | + | !X | |
!X | !X | ||
!X | !X | ||
Line 397: | Line 511: | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Measurement]] | |[[Measurement]] | ||
Line 408: | Line 525: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 427: | Line 547: | ||
!X | !X | ||
!X | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Configuration Management]] | |[[Configuration Management]] | ||
Line 433: | Line 556: | ||
| | | | ||
| | | | ||
− | + | !X | |
− | + | !X | |
| | | | ||
| | | | ||
Line 441: | Line 564: | ||
!X | !X | ||
!X | !X | ||
− | + | | | |
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Information Management]] | |[[Information Management]] | ||
Line 457: | Line 583: | ||
!X | !X | ||
!X | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Quality Management]] | |[[Quality Management]] | ||
Line 471: | Line 600: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
| | | | ||
|- | |- | ||
Line 476: | Line 608: | ||
| | | | ||
| | | | ||
− | + | !X | |
− | |||
− | |||
− | |||
− | |||
− | |||
| | | | ||
+ | !X | ||
+ | !X | ||
| | | | ||
| | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
+ | !X | ||
| | | | ||
|- | |- | ||
Line 494: | Line 629: | ||
| | | | ||
| | | | ||
− | + | !X | |
− | + | !X | |
+ | !X | ||
| | | | ||
+ | !X | ||
| | | | ||
+ | !X | ||
| | | | ||
| | | | ||
Line 505: | Line 643: | ||
− | + | Table 3 shows how the topics (each row) align with the second set of implementation examples (each column): | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
{| align="center" | {| align="center" | ||
− | |+'''Table | + | |+'''Table 3. Implementation Examples Developed for SEBoK.''' (SEBoK Original) |
!SEBoK Topic (Part 3) | !SEBoK Topic (Part 3) | ||
!Bag Handling | !Bag Handling | ||
Line 550: | Line 663: | ||
!X | !X | ||
|- | |- | ||
− | |[[Stakeholder Needs | + | |[[Stakeholder Needs Definition]] |
| | | | ||
| | | | ||
Line 566: | Line 679: | ||
!X | !X | ||
|- | |- | ||
− | |[[System Architecture]] | + | |[[System Architecture Design Definition]] |
!X | !X | ||
!X | !X | ||
Line 721: | Line 834: | ||
---- | ---- | ||
− | <center>[[Systems Engineering Implementation Examples|< Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[ | + | <center>[[Systems Engineering Implementation Examples|< Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[Implementation Examples|Next Article >]]</center> |
+ | |||
+ | <center>'''SEBoK v. 2.10, released 06 May 2024'''</center> | ||
[[Category: Part 7]] | [[Category: Part 7]] | ||
− |
Latest revision as of 22:08, 2 May 2024
Lead Authors: Heidi Davidz, Alice Squires, Tom Hilburn, Contributing Authors: Alex Lee, John Brackett, Richard Turner
The following matrix maps the Systems Engineering Implementation Examples to topics in the Systems Engineering Body of Knowledge (SEBoK). It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset is included here for clarity. For additional information, see the example of interest and the corresponding SEBoK topic.
Organization and Mapping of Examples to the SEBoK
The following short titles shown in Table 1 are used for the implementation examples:
Case Studies | |
---|---|
BT | Business Transformation |
ATC | NextGen Air Traffic Control |
NASA | NASA's Mission to Saturn |
HST | Hubble Space Telescope |
GPS | Global Positioning System |
GPS II | Global Positioning System II |
Radiation | Medical Radiation |
FBI VCF | FBI Virtual Case File System |
MSTI | Miniature Seeker Technology Integration |
Infusion Pump | Next Generation Medical Infusion Pump |
DfM | Design for Maintainability |
CAS | Complex Adaptive Operating System |
PM | Project Management |
TS | Taxi Service |
SWFTS | SWFTS MBSE |
Bag Handling | Denver Airport Baggage Handling System |
VA Sub | Virginia Class Submarine |
Route Mod | UK West Coast Route Modernisation Project |
Water Mgmt | Singapore Water Management |
FAA AAS | FAA Advanced Automation System |
Light Rail | Standard Korean Light Transit System |
TMT | Thirty-Meter Telescope |
Table 2 shows how the topics (each row) align with the first set of implementation examples (each column):
Table 3 shows how the topics (each row) align with the second set of implementation examples (each column):
SEBoK Topic (Part 3) | Bag Handling | VA Sub | Route Mod | Water Mgmt | FAA AAS | Light Rail |
---|---|---|---|---|---|---|
Business or Mission Analysis | X | X | X | |||
Stakeholder Needs Definition | X | X | X | |||
System Requirements | X | X | X | |||
System Architecture Design Definition | X | X | X | X | X | |
System Analysis | X | X | X | X | ||
System Implementation | X | |||||
System Integration | X | X | X | |||
System Verification | X | X | X | |||
System Validation | X | X | X | |||
System Deployment | X | |||||
Operation of the System | X | X | ||||
System Maintenance | X | |||||
Logistics | X | |||||
Planning | X | X | X | X | X | |
Assessment and Control | X | X | ||||
Risk Management | X | X | X | X | X | |
Measurement | X | |||||
Decision Management | X | X | X | |||
Configuration Management | X | X | X | |||
Information Management | X | |||||
Quality Management | X |