Difference between revisions of "Matrix of Implementation Examples"
Jump to navigation
Jump to search
Line 474: | Line 474: | ||
| | | | ||
|(IDEF) | |(IDEF) | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |(Rail) | ||
+ | ![[Culture]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |(ISS) | ||
+ | | | ||
+ | |(Shuttle) | ||
+ | |(Pump) | ||
+ | | | ||
+ | !X | ||
| | | | ||
| | | |
Revision as of 20:05, 28 July 2011
Below is a matrix which maps the SEBoK Systems Engineering Implementation Examples to knowledge areas in the Systems Engineering Body of Knowledge. The matrix provides both a list of potential systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset are included here for clarity. See the implementation example of interest and the corresponding SEBoK topic for more specifics on the illustration of the topic.
Since space is limited in the matrix, here are the abbreviations used for the implementation examples:
HST | Hubble Space Telescope Case Study |
GPS | Global Positioning System Case Study |
Radiation | Medical Radiation Case Study |
FBI VCF | FBI Virtual Case File Case Study |
ISS | International Space Station Case Study |
MSTI | MSTI Case Study |
Shuttle | Space Shuttle Case Study |
Infusion Pump | Next Generation Medical Infusion Pump Case Study |
Bag Handling | Denver Airport Baggage Handling System Vignette |
IDEF | GE Birth of IDEF Vignette |
VA Sub | Virginia Class Submarine Vignette |
Route Mod | UK West Coast Route Modernisation Project Vignette |
Water Mgmt | Singapore Water Management Vignette |
FAA AAS | FAA AAS Vignette |
Light Rail | Korean Light Rail Vignette |
SEBoK Topic | HST | GPS | Radiation | FBI VCF | ISS | MSTI | Shuttle | Infusion Pump | Bag Handling | IDEF | VA Sub | Route Mod | Water Mgmt | FAA AAS | Light Rail | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Systems | (GPS) | (ISS) | (Shuttle) | (Pump) | (IDEF) | X | (Rail) | ||||||||||||||||||||||||
Systems Thinking | (ISS) | (Shuttle) | (Pump) | X | (Rail) | ||||||||||||||||||||||||||
Life Cycle Models | X | (GPS) | (ISS) | X | (Shuttle) | (Pump) | (IDEF) | X | (Rail) | ||||||||||||||||||||||
Mission Analysis and Stakeholders Requirements | (GPS) | X | (ISS) | (Shuttle) | (Pump) | (IDEF) | X | X | (Rail) | ||||||||||||||||||||||
System Requirements | X | (GPS) | X | (ISS) | (Shuttle) | (Pump) | (IDEF) | X | X | (Rail) | |||||||||||||||||||||
Architectural Design | (GPS) | (ISS) | X | (Shuttle) | (Pump) | X | (IDEF) | X | X | X | (Rail) | ||||||||||||||||||||
System Analysis | (GPS) | (ISS) | (Shuttle) | (Pump) | X | (IDEF) | X | X | (Rail) | ||||||||||||||||||||||
System Implementation | (GPS) | (ISS) | (Shuttle) | (Pump) | (IDEF) | (Rail) | |||||||||||||||||||||||||
System Integration | X | (GPS) | (ISS) | X | (Shuttle) | (Pump) | X | (IDEF) | X | (Rail) | |||||||||||||||||||||
System Verification and Validation | (GPS) | X | (ISS) | X | (Shuttle) | (Pump) | X | (IDEF) | X | (Rail) | |||||||||||||||||||||
System Deployment | (GPS) | (ISS) | (Shuttle) | (Pump) | (IDEF) | (Rail) | |||||||||||||||||||||||||
Operation of the System | (GPS) | (ISS) | (Shuttle) | (Pump) | (IDEF) | X | (Rail) | ||||||||||||||||||||||||
System Maintenance | (GPS) | (ISS) | (Shuttle) | (Pump) | (IDEF) | (Rail) | |||||||||||||||||||||||||
Logistics | (GPS) | (ISS) | (Shuttle) | (Pump) | X | (IDEF) | (Rail) | ||||||||||||||||||||||||
Planning | X | (GPS) | X | (ISS) | (Shuttle) | (Pump) | X | (IDEF) | X | X | X | (Rail) | |||||||||||||||||||
Assessment and Control | (GPS) | X | X | (ISS) | X | (Shuttle) | (Pump) | (IDEF) | X | (Rail) | |||||||||||||||||||||
Risk Management | X | (GPS) | X | X | (ISS) | (Shuttle) | (Pump) | X | (IDEF) | X | X | X | (Rail) | ||||||||||||||||||
Measurement | (GPS) | (ISS) | X | (Shuttle) | (Pump) | (IDEF) | (Rail) | ||||||||||||||||||||||||
Decision Management | (GPS) | (ISS) | X | (Shuttle) | (Pump) | X | (IDEF) | X | X | (Rail) | |||||||||||||||||||||
Configuration Management | (GPS) | (ISS) | X | (Shuttle) | (Pump) | X | (IDEF) | X | X | (Rail) | |||||||||||||||||||||
Information Management | (GPS) | (ISS) | (Shuttle) | (Pump) | (IDEF) | X | (Rail) | ||||||||||||||||||||||||
Quality Management | (GPS) | (ISS) | (Shuttle) | (Pump) | (IDEF) | X | (Rail) | ||||||||||||||||||||||||
Product and Service Life Management | (GPS) | ( | (ISS) | (Shuttle) | (Pump) | (IDEF) | X | (Rail) | |||||||||||||||||||||||
Systems Engineering Standards | (GPS) | (ISS) | (Shuttle) | (Pump) | (IDEF) | (Rail) | Culture | (ISS) | (Shuttle) | (Pump) | X | (Rail) |
References
Citations
None
Primary References
None
Additional References
None