Difference between revisions of "Integrated Product Team (IPT) (glossary)"

From SEBoK
Jump to navigation Jump to search
m (Text replacement - "SEBoK v. 2.9, released 20 November 2023" to "SEBoK v. 2.10, released 06 May 2024")
 
(21 intermediate revisions by 5 users not shown)
Line 1: Line 1:
<blockquote>(1) ''an interdisciplinary team assigned to an element of the system  breakdown structure''</blockquote>
+
<blockquote>(1) ''An interdisciplinary team assigned to an element of the system  breakdown structure'' (Created for SEBoK).</blockquote>
  
<blockquote>(2) ''an interdisciplinary team''</blockquote>
+
<blockquote>(2) ''An interdisciplinary team'' (Created for SEBoK).</blockquote>
  
====Source(s)====
+
===Sources===
Adapted from Browning, Tyson R. 2009. Using the Design Structure Matrix to Design Program Organizations. In Handbook of Systems Engineering and Management, edited by A. P. Sage and W. B. Rouse. Hoboken, NJ: John Wiley & Sons, pp. 1415-1416.
+
This definition was developed for the SEBoK.
  
 
===Discussion===
 
===Discussion===
The primary definition is adapted from Browning and corresponds to the Glossary Term Owner's understanding of the traditional meaning of Integrated Product Team. The second definition is not found in any reference but corresponds to the meaning that has evolved in many segments of industry.  
+
The primary definition is adapted from Browning (2009) and corresponds to the traditional meaning of "Integrated Product Team". The second definition is not found in any reference but corresponds to the meaning that has evolved in many segments of industry.  In industry the term "functional IPT" is also used to designate teams that are not assigned to an element of the system structural breakdown structure but rather represent disciplines that cross system element boundaries, such as reliability.  
  
In industry the term "functional IPT" is also used to designate teams that are not assigned to an element of the system structural breakdown structure but rather represent disciplines that cross system element boundaries, such as reliability.  
+
'''Works Cited'''
 +
 
 +
Browning, T.R. 2009. "Using the Design Structure Matrix to Design Program Organizations." In ''Handbook of Systems Engineering and Management'', edited by A.P. Sage and W.B. Rouse. Hoboken, NJ: John Wiley & Sons, p. 1415-1416.
  
 
[[Category:Glossary of Terms]]
 
[[Category:Glossary of Terms]]
  
 
+
<center>'''SEBoK v. 2.10, released 06 May 2024'''</center>
{{5comments}}
 

Latest revision as of 23:24, 2 May 2024

(1) An interdisciplinary team assigned to an element of the system breakdown structure (Created for SEBoK).

(2) An interdisciplinary team (Created for SEBoK).

Sources

This definition was developed for the SEBoK.

Discussion

The primary definition is adapted from Browning (2009) and corresponds to the traditional meaning of "Integrated Product Team". The second definition is not found in any reference but corresponds to the meaning that has evolved in many segments of industry. In industry the term "functional IPT" is also used to designate teams that are not assigned to an element of the system structural breakdown structure but rather represent disciplines that cross system element boundaries, such as reliability.

Works Cited

Browning, T.R. 2009. "Using the Design Structure Matrix to Design Program Organizations." In Handbook of Systems Engineering and Management, edited by A.P. Sage and W.B. Rouse. Hoboken, NJ: John Wiley & Sons, p. 1415-1416.

SEBoK v. 2.10, released 06 May 2024