''<blockquote>A concern that has a probability of occurrence equal to one, a consequence of occurrence greater than zero, and a time-frame that is current. A problem is an event that has occurred and has a negative impact to the project.'' (Conrow 2008)</blockquote> | ''<blockquote>A concern that has a probability of occurrence equal to one, a consequence of occurrence greater than zero, and a time-frame that is current. A problem is an event that has occurred and has a negative impact to the project.'' (Conrow 2008)</blockquote> | ||
− | + | ===Source=== | |
Conrow, E. 2008. "Risk Analysis for Space Systems". Space Systems Engineering and Risk Management Symposium, 27-29 February, 2008, Los Angeles, CA, USA. | Conrow, E. 2008. "Risk Analysis for Space Systems". Space Systems Engineering and Risk Management Symposium, 27-29 February, 2008, Los Angeles, CA, USA. | ||
Line 8: | Line 8: | ||
[[Category:Glossary of Terms]] | [[Category:Glossary of Terms]] | ||
− | + | <center>'''SEBoK v. 2.10, released 06 May 2024'''</center> |
Latest revision as of 22:20, 2 May 2024
A concern that has a probability of occurrence equal to one, a consequence of occurrence greater than zero, and a time-frame that is current. A problem is an event that has occurred and has a negative impact to the project. (Conrow 2008)
Source
Conrow, E. 2008. "Risk Analysis for Space Systems". Space Systems Engineering and Risk Management Symposium, 27-29 February, 2008, Los Angeles, CA, USA.
Discussion
Defines problem in terms of probablity of occurrence, consequence of occurrence, and time-frame; all of which are measurable.