This PhD thesis research project goal is to reduce the duration of the integration and test phase of large complex embedded systems. It uses a Wafer Scanner as an example. The work was performed at the Embedded Systems Institute in Eindhoven. | This PhD thesis research project goal is to reduce the duration of the integration and test phase of large complex embedded systems. It uses a Wafer Scanner as an example. The work was performed at the Embedded Systems Institute in Eindhoven. | ||
− | <center>'''SEBoK v. 2. | + | <center>'''SEBoK v. 2.6, released 13 May 2022'''</center> |
[[Category:Primary Reference]] | [[Category:Primary Reference]] |
Revision as of 07:48, 21 April 2022
de Jong, I. 2008. Integration and Test Strategies for Complex Manufacturing Machines: Integration and Testing Combined in a Single Planning and Optimization Framework. Saarbrücken, Germany: Verlag.
Usage
This source is considered a primary reference for the Business Activities Related to Product Systems Engineering articles.
Annotation
This PhD thesis research project goal is to reduce the duration of the integration and test phase of large complex embedded systems. It uses a Wafer Scanner as an example. The work was performed at the Embedded Systems Institute in Eindhoven.