Search results
Jump to navigation
Jump to search
Page title matches
- ...together. Collectively, they affect economic life-cycle costs of a system and its utility. ...y, governments, and the military, reliability must consider both hardware, and software.48 KB (6,784 words) - 23:06, 2 May 2024
- 23 bytes (2 words) - 09:50, 18 April 2021
- ...ability Modeling, Prediction, and Optimization''. New York, NY, USA: Wiley and Sons.</blockquote> ...is considered a primary reference for the [[Reliability, Availability, and Maintainability]] article.532 bytes (71 words) - 21:45, 2 May 2024
- 23 bytes (2 words) - 19:50, 6 November 2011
Page text matches
- <blockquote>Martz, H.F. and R.A. Waller. 1991. ''Bayesian Reliability Analysis''. Malabar, FL, USA: Kreiger.</blockquote> ...is considered a primary reference for the [[Reliability, Availability, and Maintainability]] article.502 bytes (62 words) - 22:50, 2 May 2024
- <blockquote>Kececioglu, D. 1991. ''Reliability Engineering Handbook,'' Vol 2. Upper Saddle River, NJ: Prentice Hall.</bloc ...is considered a primary reference for the [[Reliability, Availability, and Maintainability]] article.461 bytes (55 words) - 22:51, 2 May 2024
- ...ability Modeling, Prediction, and Optimization''. New York, NY, USA: Wiley and Sons.</blockquote> ...is considered a primary reference for the [[Reliability, Availability, and Maintainability]] article.526 bytes (67 words) - 22:44, 2 May 2024
- ...98. ''Statistical Methods for Reliability Data''. New York, NY, USA: Wiley and Sons.</blockquote> ...is considered a primary reference for the [[Reliability, Availability, and Maintainability]] article.506 bytes (66 words) - 22:58, 2 May 2024
- ...ability Modeling, Prediction, and Optimization''. New York, NY, USA: Wiley and Sons.</blockquote> ...is considered a primary reference for the [[Reliability, Availability, and Maintainability]] article.532 bytes (71 words) - 21:45, 2 May 2024
- ...atistical Models and Methods for Lifetime Data''. New York, NY, USA: Wiley and Sons.</blockquote> ...is considered a primary reference for the [[Reliability, Availability, and Maintainability]] article.497 bytes (64 words) - 22:28, 2 May 2024
- ...l requirements include availability, reliability, maintainability, safety, and security.564 bytes (74 words) - 22:41, 2 May 2024
- :[[BKCASE Governance and Editorial Board]] :[[Acknowledgements and Release History]]2 KB (243 words) - 11:56, 30 October 2022
- :[[Governance and Editorial Boards]] :[[Acknowledgements and Release History]]3 KB (308 words) - 04:12, 11 May 2022
- ...iability, Availability, and Maintainability|reliability, availability, and maintainability]] were critical to the success of this system. ...focused on reliability, availability, maintainability, and safety (RAMS), and were integrated into project management (PM) activities during all phases.9 KB (1,268 words) - 22:39, 2 May 2024
- ...[[Reliability, Availability, and Maintainability]] and [[Manufacturability and Producibility]] articles in [[Related Disciplines|Part 6: Related Disciplin == Content and Feature Updates for v. 1.8 ==7 KB (959 words) - 22:36, 8 March 2024
- ...t versions of the SEBoK, please follow the links under "[[Acknowledgements and Release History#SEBoK Release History|SEBoK Release History]]" below. ==BKCASE History, Motivation, and Value==12 KB (1,740 words) - 23:43, 5 May 2024
- ...ablish requirements and tasks to be accomplished for achieving, restoring, and maintaining operational capability for the life of the system. For a {{Term *[[Capability Updates, Upgrades, and Modernization]]9 KB (1,148 words) - 22:57, 2 May 2024
- '''''Lead Authors:''''' ''Art Pyster and Dave Olwell'' '''''Contributing Authors:''''' ''Richard Turner, Dick Fairl ...called ''quality attributes,'' ''non-functional requirements, -ilities,'' and ''specialties.'' In this KA, the term {{Term|Specialty Engineering (glossa9 KB (1,289 words) - 22:45, 2 May 2024
- ...ines logistics as the science of planning and implementing the acquisition and use of the resources necessary to sustain the operation of a system. ...on University (DAU) model of the SE aspects for consideration in logistics and logistics planning (DAU 2010).18 KB (2,434 words) - 22:56, 2 May 2024
- ...aggage handling system. In August 2005, the automated system was abandoned and replaced with a manual one. ...align with the conveyor belts feeding the bags. This resulted in mutilated and lost bags (Neufville 1994; Gibbs 1994).5 KB (681 words) - 23:15, 2 May 2024
- ...forecasted large increases in traffic through the use of modern equipment and advanced software functions. (GAO 1992) ...$2.5 billion and be completed in 1996. However, substantial cost increases and schedule delays beset the AAS project over its history, caused by numerous6 KB (837 words) - 23:04, 2 May 2024
- ...together. Collectively, they affect economic life-cycle costs of a system and its utility. ...y, governments, and the military, reliability must consider both hardware, and software.48 KB (6,784 words) - 23:06, 2 May 2024
- ...les in the Knowledge Area[[Systems Engineering and Quality Attributes | SE and Quality Attributes]]. ...rm|System (glossary)|Systems}} that directly include geospatial components and {{Term|System Element (glossary)|system elements}}, or that perform {{Term|19 KB (2,639 words) - 23:15, 2 May 2024
- ***[[Systems Engineering: Historic and Future Challenges]] ***[[Systems Engineering and Other Disciplines]]11 KB (1,184 words) - 21:55, 23 April 2024