The methods, tools, and techniques of project management can be recursively applied to managing the technical aspects of a project. Technical work activities must be planned, organized, staffed, controlled, and directed; the what, who, when, where, how, and why questions must be answered; work activities must be planned and estimated, measured and controlled, led and directed, and risk must be managed.

The Systems Engineering Management Plan (SEMP)

The systems engineering management plan (SEMP) is an important element of systems engineering. According to (NASA 2007):

The SEMP is the rule book that describes to all participants how the project will be technically managed.

Appendix J of the NASA Systems Engineering Handbook (NASA 2007) provides a checklist of items that should be included in an SEMP, as needed [[1]]:

  • Purpose and Scope of the SEMP
  • Applicable Documents
  • Technical Summary
  • System Description
  • System Structure
  • Product Integration
  • Boundary of Technical Effort
  • Cross References
  • Technical Effort Integration, including
    • Concurrent engineering,
    • The activity phasing of specialty engineering,
    • The participation of specialty disciplines,
    • The involvement of specialty disciplines,
    • The role and responsibility of specialty disciplines,
    • The participation of specialty disciplines in system decomposition and definition,
    • The role of specialty disciplines in verification and validation,
    • Reliability,
    • Maintainability,
    • Quality assurance,
    • Integrated logistics,
    • Human engineering,
    • Safety,
    • Producibility, and
    • Survivability/vulnerability.
  • Responsibility and Authority
  • Contractor Integration
  • Support Integration
  • Technical Process Integration
  • Technology Insertion
  • Engineering Methods and Tools
  • Specialty Engineering
  • Integration with the Project Plan and Technical Resource Allocation
  • Waivers
  • Appendices
    • including plan templates
  • References

Some systems engineers become specialists in systems engineering project management.


References

Please make sure all references are listed alphabetically and are formatted according to the Chicago Manual of Style (15th ed). See the BKCASE Reference Guidance for additional information.

Citations

List all references cited in the article. Note: SEBoK 0.5 uses Chicago Manual of Style (15th ed). See the BKCASE Reference Guidance for additional information.

Primary References

All primary references should be listed in alphabetical order. Remember to identify primary references by creating an internal link using the ‘’’reference title only’’’ (title). Please do not include version numbers in the links.

Additional References

All additional references should be listed in alphabetical order.


Article Discussion

[Go to discussion page]

<- Previous Article | Parent Article | Next Article ->


Signatures

--Bkcase 19:08, 22 August 2011 (UTC) (on behalf of Dick Fairley)