At the project level, systems engineering [[measurement]] focuses on indicators of project and system success that are relevant to the project and its stakeholders. At the business and enterprise level there are additional concerns. [[Systems Engineering Governance]] ensures that the performance of systems engineering within the business or enterprise adds value to the organisation, is aligned to the organisation's purpose, and implements the relevant parts of the organisation's strategy. The governance levers that can be used to improve performance include people (selection, training, culture, incentives, - -), process, tools and infrastructure, and organisation. So the assessment of systems engineering performance in a business and enterprise needs to cover these dimensions and inform these choices.  
+
----
 +
'''''Lead Authors:''''' ''Hillary Sillitto, Alice Squires, Heidi Davidz'', '''''Contributing Authors:''''' ''Art Pyster, Richard Beasley''
 +
----
 +
At the project level, {{Term|Systems Engineering (glossary)|systems engineering}} (SE) [[measurement]] focuses on indicators of project and system success that are relevant to the project and its stakeholders. At the enterprise level there are additional concerns. SE {{Term|Governance (glossary)|governance}} should ensure that the performance of systems engineering within the enterprise adds value to the organization, is aligned to the organization's purpose, and implements the relevant parts of the organization's strategy.  
  
SE measurement to date has focused more on measuring SE itself than on measuring the benefits SE delivers to the business or the wider enterprise. If project measures are to be useful at business and enterprise level they need to be collected and used consistently across projects. The policy for this needs to be defined at business or enterprise level.
+
For enterprises that are traditional {{Term|Business (glossary)|businesses}} this is easier, because such organizations typically have more control levers than more loosely structured enterprises. The governance levers that can be used to improve performance include people (selection, training, culture, incentives), process, tools and infrastructure, and organization; therefore, the assessment of systems engineering performance in an enterprise should cover these dimensions.  
  
== Relevant measures ==
+
Being able to aggregate high quality data about the performance of teams with respect to SE activities is certainly of benefit when trying to guide team activities.  Having access to comparable data, however, is often difficult, especially in organizations that are relatively autonomous, use different technologies and tools, build products in different domains, have different types of customers, etc. Even if there is limited ability to reliably collect and aggregate data across teams, having a policy that consciously decides how the enterprise will address data collection and analysis is valuable.
  
Relevant measures for assessing Systems Engineering performance of businesses and enterprises include the following:
+
== Performance Assessment Measures ==
  
*SE internal process   
+
Typical measures for assessing SE performance of an enterprise include the following:
*Ability to mobilise the right resources at the right time for a new project or new project phase  
+
 
*Project SE outputs   
+
*Effectiveness of SE process   
 +
*Ability to mobilize the right resources at the right time for a new project or new project phase  
 +
*Quality of SE process outputs
 +
*Timeliness of SE process outputs   
 
*SE added value to project  
 
*SE added value to project  
 
*System added value to end users   
 
*System added value to end users   
*SE added value to organisation
+
*SE added value to organization
 
*Organization's SE capability development  
 
*Organization's SE capability development  
 
*Individuals' SE competence development  
 
*Individuals' SE competence development  
 
*Resource utilization, current and forecast  
 
*Resource utilization, current and forecast  
*Deployment and consistent usage of tools and methods  
+
*Productivity of systems engineers
*etc etc
+
*Deployment and consistent usage of tools and methods
  
== How the measures fit in the governance process and improvement cycle ==
+
== How Measures Fit in the Governance Process and Improvement Cycle ==
 +
Since collecting data and analyzing it takes effort that is often significant, measurement is best done when its purpose is clear and is part of an overall strategy. The "goal, question, metric" paradigm (Basili 1992) should be applied, in which measurement data is collected to answer specific questions, the answer to which helps achieve a goal, such as decreasing the cost of creating a system architecture or increasing the value of a system to a particular stakeholder. Figure 1 shows one way in which appropriate measures inform enterprise level governance and drive an improvement cycle such as the Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) model.
  
Measurement should only be deployed for a clear purpose as part of an overall strategy. The following diagram shows how appropriate measures inform business or enterprise level governance and drive an improvement cycle such as the Six Sigma DMAIC (Define, Measure, Analyse, Improve, Control) model.
 
  
 +
[[File:Picture1_HGS.png|thumb|center|800px|'''Figure 1. Assessing Systems Engineering Performance in Business or Enterprise: Part of Closed Loop Governance.''' (SEBoK Original)]]
  
[[File:Picture1_HGS.png|800px|Assessing systems engineering performance in business or enterprise: part of closed loop governance]]
+
== Discussion of Performance Assessment Measures ==
  
== Discussion of performance assessment measures ==
+
=== Assessing SE Internal Process (Quality and Efficiency)===
  
=== Assessing SE internal process (quality and efficiency)===
+
A {{Term|Process (glossary)}} is a ''"set of interrelated or interacting activities which transforms inputs into outputs."''  The SEI CMMI Capability Maturity Model (SEI 2010) provides a structured way for businesses and enterprises to assess their SE processes. In the CMMI, a process area is a cluster of related practices in an area that, when implemented collectively, satisfies a set of goals considered important for making improvement in that area. There are CMMI models for acquisition, for development, and for services (SEI 2010, 11).  CMMI defines how to assess individual process areas against Capability Levels on a scale from 0 to 3, and overall organizational maturity on a scale from 1 to 5.
  
Process can be considered to be "the right people, with the right skills, training and motivation, doing the right things, in the right order, with the right information, tools and equipment, to the right level of quality, for the right purpose" (Sillitto, 2011).
+
=== Assessing Ability to Mobilize for a New Project or New Project Phase ===
  
The SEI CMMI Capability Maturity Model provides a structured way for businesses and enterprises to assess their SE processes. In the CMMI, a process area is a cluster of related practices in an area that, when implemented collectively, satisfies a set of goals considered important for making improvement in that area. There are CMMI models for acquisition, for development, and for services. (SEI: CMMI for Development V1.3 Page 11)
+
Successful and timely project initiation and execution depends on having the right people available at the right time. If key resources are deployed elsewhere, they cannot be applied to new projects at the early stages when these resources make the most difference. Queuing theory shows that if a resource pool is running at or close to capacity, delays and queues are inevitable.
 
CMMI defines how to assess individual process areas against Capability Levels on a scale from 0 to 3, and overall organizational maturity on a scale from 1 to 5.
 
  
=== Assessing ability to mobilise for a new project or new project phase ===
+
The ability to manage teams through their lifecycle is an organizational capability that has substantial leverage on project and organizational efficiency and effectiveness. This includes being able to
 +
*mobilize teams rapidly;
 +
*establish and tailor an appropriate set of processes, metrics and systems engineering plans;
 +
*support them to maintain a high level of performance;
 +
*capitalize acquired knowledge; and
 +
*redeploy team members expeditiously as the team winds down.
  
Successful and timely project initiation and execution depends on having the right people available at the right time. If key resources are deployed fire-fighting or otherwise over-committed, they cannot be applied to new projects at the early stages when they will make the most difference. Queuing theory shows us that if a resource pool is running at or close to capacity, delays and queues are inevitable.
+
Specialists and experts are used to a review process, critiquing solutions, creating novel solutions, and solving critical problems. Specialists and experts are usually a scarce resource. Few businesses have the luxury of having enough experts with all the necessary skills and behaviors on tap to allocate to all teams just when needed. If the skills are core to the business' competitive position or governance approach, then it makes sense to manage them through a governance process that ensures their skills are applied to greatest effect across the business.
  
The ability to manage teams through their lifecycle - mobilise teams rapidly, establish and tailor an appropriate set of processes, metrics and systems engineering plans, support them to maintain a high level of performance, and capitalise acquired knowledge and redeploy the team members expeditiously as the team winds down - is an organisational capability that has substantial leverage on project and organisational efficiency and effectiveness.
+
Businesses typically find themselves balancing between having enough headroom to keep projects on schedule when things do not go as planned and utilizing resources efficiently.
  
Specialists and experts are used to review progress, to critique solutions, to create novel solutions, and to solve critical problems. Specialists and experts are usually a scarce resource. Few businesses have the luxury of having enough experts with all the necessary skills and behaviours on tap to allocate to teams as and when required. If the skills are core to the business’s competitive position or governance approach, then it makes sense to  manage them through a governance process that ensures their skills are applied to greatest effect across the business.
+
=== Project SE Outputs (Cost, Schedule, Quality) ===
  
Any business is likely to find itself performing a balancing act between having enough headroom to keep projects on schedule when things don't go to plan, and efficient utilisation of resources.
+
Many SE outputs in a project are produced early in the life cycle to enable downstream activities. Hidden defects in the early phase SE work products may not become fully apparent until the project hits problems in integration, verification and validation, or transition to operations. Intensive peer review and rigorous modeling are the normal ways of detecting and correcting defects in and lack of coherence between SE work products.  
  
=== Project SE outputs (cost, schedule, quality) ===
+
Leading indicators could be monitored at the organizational level to help direct support to projects or teams heading for trouble. For example, the INCOSE Leading Indicators report (Roedler et al. 2010) offers a set of indicators that is useful at the project level. Lean Sigma provides a tool for assessing benefit delivery throughout an enterprise value stream. Lean Enablers for Systems Engineering are now being developed (Oppenheim et al. 2010). An emerging good practice is to use {{Term|Lean Value Stream Mapping (glossary)}} to aid the optimization of project plans and process application.
  
Many of the "systems engineering" outputs in a project are produced early in the lifecycle to enable downstream activities. Hidden defects in the early phase systems engineering work products may not become fully apparent until the project hits problems in integration, V&V, or transition to operations. Intensive peer review and rigorous modelling are the normal ways of detecting and correcting defects in and lack of coherence between SE work products.  
+
In a mature organization, one good measure of [[Quality Management|SE quality]] is the number of defects that have to be corrected "out of phase"; i.e., at a later phase in the life cycle than the one in which the defect was introduced. This gives a good measure of process performance and the quality of SE outputs. Within a single project, the Work Product Approval, Review Action Closure, and Defect Error trends contain information that allows residual defect densities to be estimated (Roedler et al. 2010; Davies and Hunter 2001).
  
In a mature organization a good measure of SE quality is the number of defects that have to be corrected "out of phase", that is in phases after the SE work product has been reviewed and approved for downstream use. This gives a good measure of process performance and the quality of SE outputs. Within a single project, the Work Product Approval, Review Action Closure, and Defect Error trends (SE Leading Indicators Guide), contain information that allows residual defect densities to be estimated. (Davies and Hunter 2001)
+
Because of the leverage of front-end SE on overall project performance, it is important to focus on quality and timeliness of SE deliverables (Woodcock 2009).
  
Because of the leverage of front-end SE on overall project performance, it is important to focus on quality and timeliness of SE deliverables. Cost is important too, but if the work is done competently and on time, cost will tend to take care of itself; whereas if the SE work is done badly, downstream cost and schedule over-runs are inevitable (INCOSE UK Chapter Z-3 Guide 2009)
+
=== SE Added Value to Project ===
 +
SE that is properly [[Systems Engineering Management|managed]] and performed should add value to the project in terms of quality, risk avoidance, improved coherence, better management of issues and dependencies, right-first-time integration and formal verification, stakeholder management, and effective scope management. Because quality and quantity of SE are not the only factors that influence these outcomes, and because the effect is a delayed one (good SE early in the project pays off in later phases) there has been a significant amount of research to establish evidence to underpin the asserted benefits of SE in projects.
  
=== SE added value to project ===
+
A summary of the main results is provided in the [[Economic Value of Systems Engineering]] article.
SE properly managed and performed should add value to the project in terms of quality, risk avoidance, improved coherence, better management of issues and dependencies, right-first-time integration and formal verification, stakeholder management, and effective scope management. Because quality and quantity of SE are not the only factors that influence these outcomes, and because the effect is a delayed one (good SE early in the project pays off in later phases) there has been a significant amount of research to establish evidence to underpin the asserted benefits of SE in projects.  
 
  
The main results are summarised elsewhere in Part 5 in the section on [[Value Proposition for Systems Engineering|the value proposition for systems engineering]].
+
=== System Added Value to End Users ===
 +
System-added value to end users depends on system effectiveness and on alignment of the requirements and design to the end users' purpose and mission. System end users are often only involved indirectly in the procurement process.  
  
=== System added value to end users ===
+
Research on the value proposition of SE shows that good project outcomes do not necessarily correlate with good end user experience. Sometimes systems developers are discouraged from talking to end users because the acquirer is afraid of requirements creep. There is experience to the contrary that end user involvement can result in more successful and simpler system solutions.  
System added value to end users depends on system effectiveness and on alignment of the requirements and design to the end users' purpose and mission. System end users are often only involved indirectly in the procurement process. The research on the value proposition of systems engineering shows that good project outcomes do not necessarily correlate with good end user experience. Sometimes systems developers are discouraged from talking to end users because the acquirer is afraid of requirements creep. There is experience to the contrary (citation needed), that end user involvement can result in more successful and simpler system solutions.  
 
  
Two specific measures are indicative of end user satisfaction:
+
Two possible measures indicative of end user satisfaction are:
  
#The use of user-validated mission scenarios (both nominal and "rainy day" situations) to validate requirements, drive trade-offs and organise testing and acceptance;
+
#The use of user-validated mission scenarios (both nominal and "rainy day" situations) to validate requirements, drive trade-offs and organize testing and acceptance;
#The use of TPMs (Technical Performancce Measures) to track critical performance and non-functional system attributes directly relevant to operational utility. The INCOSE [http://www.incose.org/ProductsPubs/pdf/SELI-Guide-Rev2-01292010-Industry.pdf SE Leading Indicators Guide (p 10 and pp 68 et seq)] defines "technical measurement trends" as "Progress towards meeting the Measures of Effectiveness(MOEs) / Performance (MOPs) / Key Performance Parameters (KPPs) and Technical Performance Measures(TPMs)". A typical TPM progress plot is shown in the following figure.
+
#The use of {{Term|Technical Performance Measure (TPM) (glossary)}} to track critical performance and non-functional system attributes directly relevant to operational utility. The INCOSE SE Leading Indicators Guide (Roedler et al. 2010, 10 and 68) defines "technical measurement trends" as ''"Progress towards meeting the {{Term|Measure of Effectiveness (MoE) (glossary)}} / {{Term|Measure of Performance (MoP) (glossary)}} / Key Performance Parameters (KPPs) and {{Term|Technical Performance Measure (TPM) (glossary)}}"''. A typical TPM progress plot is shown in Figure 2.
  
[[File:TPM_Chart_from_INCOSE_SELIG.png|800px|Technical Performance Measure (TPM) Tracking]]
+
[[File:TPM_Chart_from_INCOSE_SELIG.png|thumb|center|600px|'''Figure 2. Technical Performance Measure (TPM) Tracking (Roedler et al. 2010).''' This material is reprinted with permission from the International Council on Systems Engineering (INCOSE). All other rights are reserved by the copyright owner.]]
  
=== SE added value to organization ===
+
=== SE Added Value to Organization ===
SE at the organizational level aims to develop, deploy and enable effective systems engineering to add value to the organization’s business. The Systems Engineering function in the business or enterprise should understand the part it has to play in the bigger picture, and identify appropriate performance measures - derived from the business or enterprise goals, and coherent with those of other parts of the organization - so that it can optimize its contribution and justify the resources allocated to it.
+
SE at the business/enterprise level aims to develop, deploy and enable effective SE to add value to the organization’s business. The SE function in the business/enterprise should understand the part it has to play in the bigger picture and identify appropriate performance measures - derived from the business or enterprise goals, and coherent with those of other parts of the organization - so that it can optimize its contribution.
  
=== Organization's SE capability development ===
+
=== Organization's SE Capability Development ===
The CMMI Capability Maturity Model [http://www.sei.cmu.edu/cmmi/tools/cmmiv1-3/ CMMI V1.3] provides a means of assessing the process capability and maturity of businesses and enterprises. The higher CMMI levels are concerned with systemic integration of capabilities across the business or enterprise.  
+
The CMMI (SEI 2010) provides a means of assessing the process capability and maturity of businesses and enterprises. The higher CMMI levels are concerned with systemic integration of capabilities across the business or enterprise.  
  
CMMI measures one important dimension of capability development, but CMMI maturity level is not a direct measure of business effectiveness unless the SE measures are properly integrated with business performance measures. These may include bid success rate, market share, position in value chain, development cycle time and cost, level of innovation and re-use, and the effectiveness with which SE capabilities are applied to the specific problem and solution space of interest to the business.
+
CMMI measures one important dimension of capability development, but CMMI maturity level is not a direct measure of business effectiveness unless the SE measures are properly integrated with business performance measures. These may include bid success rate, market share, position in value chain, development cycle time and cost, level of innovation and re-use, and the effectiveness with which SE capabilities are applied to the specific problem and solution space of interest to the business.
  
=== Individuals' SE competence development ===
+
=== Individuals' SE Competence Development ===
Assessment of Individuals' SE competence development is described elsewhere in Part 5, see [http://www.bkcasewiki.org/index.php/Assessing_Individuals "Assessing individuals"]
+
Assessment of Individuals' SE competence development is described in [[Assessing Individuals]].
  
=== Resource utilization, current and forecast ===
+
=== Resource Utilization, Current and Forecast ===
The INCOSE  [http://www.incose.org/ProductsPubs/products/seleadingIndicators.aspx Systems Engineering Leading Indicators Guide (pp 58 et seq)] proposes various metrics for staff ramp-up and use on a project. Across the business or enterprise, key indicators include the overall manpower trend across the projects, the stability of the forward load, levels of overtime, the resource headroom (if any), staff turnover, level of training, and the period of time for which key resources are committed.
+
Roedler et al. (2010, 58) offer various metrics for staff ramp-up and use on a project. Across the business or enterprise, key indicators include the overall manpower trend across the projects, the stability of the forward load, levels of overtime, the resource headroom (if any), staff turnover, level of training, and the period of time for which key resources are committed.
  
=== Deployment and consistent usage of tools and methods ===
+
=== Deployment and Consistent Usage of Tools and Methods ===
''"To err is human - to really foul things up we need a computer!"'' (anon.)
+
It is common practice to use a range of software tools in an effort to manage the complexity of system development and in-service management. These range from simple office suites to complex logical, virtual reality and physics-based modeling environments.
  
It is common practice to use a range of software tools in an effort to manage the complexity of system development and in-service management. These range from simple office suites to complex logical, virtual reality and physics-based modelling environments.
+
Deployment of SE tools requires careful consideration of purpose, business objectives, business effectiveness, training, aptitude, method, style, business effectiveness, infrastructure, support, integration of the tool with the existing or revised SE process, and approaches to ensure consistency, longevity and appropriate configuration management of information. Systems may be in service for upwards of 50 years, but storage media and file formats that are 10-15 years old are unreadable on most modern computers. It is desirable for many users to be able to work with a single common model; it can be that two engineers sitting next to each other using the same tool use sufficiently different modeling styles that they cannot work on or re-use each others' models.
  
Deployment of SE tools requires careful consideration of purpose, business objectives, business effectiveness, training, aptitude, method, style, business effectiveness, infrastructure, support, integration of the tool with the existing or revised SE process, and approaches to ensure consistency, longevity and appropriate configuration management of information. Systems may be in service for upwards of 50 years; storage media and file formats as little as 10-15 years old are unreadable on most modern computers. It is desirable for many users to be able to work with a single common model; it can be that two engineers sitting next to each other using the same tool use sufficiently different modelling styles that they cannot work on or re-use each others' models.
+
License usage over time and across sites and projects is a key indicator of extent and efficiency of tool deployment. More difficult to assess is the consistency of usage. Roedler et al. (2010, 73) recommend metrics on "facilities and equipment availability".
  
Licence usage over time and across sites and projects is a key indicator of extent and efficiency of tool deployment. More difficult to assess is the consistency of usage.
+
== Practical Considerations ==
The INCOSE [http://www.incose.org/ProductsPubs/pdf/SELI-Guide-Rev2-01292010-Industry.pdf Systems Engineering Leading Indicators Guide p 73 et seq] recommends metrics on "facilities and equipment availability".
 
  
== Practical Considerations (Pitfalls, Good Practice, etc.) ==
+
Assessment of SE performance at the business/enterprise level is complex and needs to consider soft issues as well as hard issues. Stakeholder concerns and satisfaction criteria may not be obvious or explicit. Clear and explicit reciprocal expectations and alignment of purpose, values, goals and incentives help to achieve synergy across the organization and avoid misunderstanding.
  
Assessment of SE performance at organisational level is complex and needs to consider soft as well as hard issues. Stakeholder concerns and satisfaction criteria may not be obvious or explicit. Clear and explicit reciprocal expectations and alignment of purpose, values, goals and incentives help to achieve synergy across the organization and avoid misunderstanding.
+
''"What gets measured gets done."'' Because metrics drive behavior, it is important to ensure that metrics used to manage the organization reflect its purpose and values, and that they do not drive perverse behaviors (Roedler et al. 2010).
  
"What gets measured gets done". Metrics drive behaviour, so it is important to ensure that the metrics used to manage the organisation reflect its purpose and values, and do not drive perverse behaviours. (See INCOSE 2010, SE Measurement Primer)
+
Process and measurement cost money and time, so it is important to get the right amount of process definition and the right balance of investment between process, measurement, people and skills. Any process flexible enough to allow innovation will also be flexible enough to allow mistakes. If process is seen as excessively restrictive or prescriptive, it may inhibit innovation and demotivate the innovators in an effort to prevent mistakes, leading to excessive risk avoidance.  
  
Process and measurement cost money and time, so it is important to get the "right" amount of process definition, and the right balance of investment between prcoess, measurement, people and skills. Any process flexible enough to allow innovation will also be flexible enough to allow mistakes. If process is seen as excessively restrictive or prescriptive, in an effort to prevent mistakes, it may inhibit innovation and demotivate the innovators, leading to excessively risk averse behaviour.  
+
It is possible for a process improvement effort to become an end in itself rather than a means to improve business performance (Sheard 2003). To guard against this, it is advisable to remain clearly focused on purpose (Blockley and Godfrey 2000) and on added value (Oppenheim et al. 2010) as well as to ensure clear and sustained top management commitment to driving the process improvement approach to achieve the required business benefits. Good process improvement is as much about establishing a performance culture as about process.
  
It is possible for a CMMI effort to become an end in itself rather than a means to improved business performance (Sheard, 2003). To guard against this it is advisable to remain clearly focused on purpose (Blockley and Godfrey 2000), and on added value - (Oppenheim et al 2010); and to ensure clear and sustained top management commitment to driving the the CMMI approach to achieve the required business benefits. CMMI is as much about establishing a performance culture as about process per se.
+
<blockquote> ''The Systems Engineering process is an essential complement to, and is not a substitute for, individual skill, creativity, intuition, judgment etc. Innovative people need to understand the process and how to make it work for them, and neither ignore it nor be slaves to it. Systems Engineering measurement shows where invention and creativity need to be applied. SE process creates a framework to leverage creativity and innovation to deliver results that surpass the capability of the creative individuals – results that are the emergent properties of process, organisation, and leadership.'' (Sillitto 2011)</blockquote>
  
''"The Systems Engineering process is an essential complement to, and is not a substitute for, individual skill, creativity, intuition, judgment etc. Innovative people need to understand the process and how to make it work for them, and neither ignore it nor be slaves to it. Systems Engineering measurement shows where invention and creativity need to be applied. SE process creates a framework to leverage creativity and innovation to deliver results that surpass the capability of the creative individuals – results that are the emergent properties of process, organisation, and leadership."'' (Sillitto 2011)
+
==References==
 +
===Works Cited===
 +
Basili, V. 1992. "[[Software Modeling and Measurement: The Goal/Question/Metric Paradigm]]" Technical Report CS-TR-2956. University of Maryland: College Park, MD, USA.  Accessed on August 28, 2012. Available at http://www.cs.umd.edu/~basili/publications/technical/T78.pdf.
  
== Linkages to other topics ==
+
Blockley, D. and P. Godfrey. 2000. ''Doing It Differently – Systems for Rethinking Construction''. London, UK: Thomas Telford Ltd.
  
 +
Davies, P. and N. Hunter. 2001.  "System Test Metrics on a Development-Intensive Project."  Paper presented at the 11th Annual International Council on System Engineering (INCOSE) International Symposium. 1-5 July 2001. Melbourne, Australia.
  
==References==
+
Oppenheim, B., E. Murman, and D. Sekor. 2010. ''[[Lean Enablers for Systems Engineering]]''.  Systems Engineering. 14(1). New York, NY, USA: Wiley and Sons, Inc.
===Citations===
+
 
*Blockley, D. and P. Godfrey. 2000Doing It Differently – Systems For Rethinking Construction. Thomas Telford Ltd.
+
Roedler, G. D. Rhodes, H. Schimmoller, and C. Jones (eds.). 2010. ''[[Systems Engineering Leading Indicators Guide]],'' version 2.0. January 29, 2010, Published jointly by LAI, SEARI, INCOSE, and PSM.  INCOSE-TP-2005-001-03. Accessed on September 14, 2011. Available at http://seari.mit.edu/documents/SELI-Guide-Rev2.pdf.
*Davies, P. & N. Hunter. 2001.  System Test Metrics on a Development-Intensive Project. Thales, Proceedings from the 2001 INCOSE International Symposium.
+
 
*INCOSE UK Chapter, 2009. Z-3 Guide, Issue 3.0, March 2009, see: "[http://www.incoseonline.org.uk/Documents/zGuides/Z3_Why_invest_in_SE.pdf How Systems Engineering can save your business money]",  
+
SEI. 2010. ''CMMI for Development,'' version 1.3. Pittsburgh, PA, USA: Software Engineering Institute/Carnegie Mellon University. CMU/SEI-2010-TR-033. Accessed on September 14, 2011. Available at http://www.sei.cmu.edu/reports/10tr033.pdf.
*Oppenheim et al. 2010, INCOSE Lean SE WG. “Lean enablers for Systems Engineering”, accessible at http://cse.lmu.edu/about/graduateeducation/systemsengineering/INCOSE.htm.  
+
 
*SEI. 2010. Capability Maturity Model Integrated (CMMI) for Development, version 1.3. Pittsburgh, PA, USA: Software Engineering Institute (SEI)/Carnegie Mellon University (CMU).
+
Sheard, S, 2003. "The Lifecycle of a Silver Bullet." ''Crosstalk: The Journal of Defense Software Engineering.'' (July 2003). Accessed on September 14, 2011. Available at http://www.crosstalkonline.org/storage/issue-archives/2003/200307/200307-Sheard.pdf.
*Sheard, S, 2003. "The lifecycle of a silver bullet", Crosstalk, July 2003
+
 
*Sillitto, H. 2011. Panel on "People or Process, Which is More Important", INCOSE International Symposium, Denver, June 2011.
+
Sillitto, H. 2011. Panel on "People or Process, Which is More Important". Presented at the 21st Annual International Council on Systems Engineering (INCOSE) International Symposium. 20-23 June 2011. Denver, CO, USA.
*[[System Engineering Leading Indicators Guide]], Version 2.0, January 29, 2010, Editors: Garry Roedler, Lockheed Martin Corporation, Donna H. Rhodes, Massachusetts Institute of Technology, Howard Schimmoller, Lockheed Martin Corporation, Cheryl Jones, US Army. Published jointly by LAI, SEARI, INCOSE, PSM
+
 
*[[Systems Engineering Measurement Primer]] - A Basic Introduction to Measurement Concepts and Use for Systems Engineering, Prepared by: Measurement Working Group, International Council on Systems Engineering (INCOSE); Document No. INCOSE-TP-2010-005-02; Version 2.0, 5 November 2010.
+
Woodcock, H. 2009. "Why Invest in Systems Engineering." INCOSE UK Chapter. Z-3 Guide, Issue 3.0. March 2009. Accessed on September 14, 2011. Available at http://www.incoseonline.org.uk/Documents/zGuides/Z3_Why_invest_in_SE.pdf.
  
 
===Primary References===
 
===Primary References===
Roedler,G., D.H. Rhodes, H. Schimmoler, and C. Jones (eds). 2010. ''[[Systems Engineering Leading Indicators Guide]]'', version 2.0. Published jointly by LAI, SEARI, INCOSE, and PSM.
+
Basili, V. 1992. "[[Software Modeling and Measurement: The Goal/Question/Metric Paradigm]]". College Park, MD, USA: University of Maryland. Technical Report CS-TR-2956. Accessed on August 28, 2012. Available at http://www.cs.umd.edu/~basili/publications/technical/T78.pdf.
 +
 
 +
Frenz, P., et al. 2010. ''[[Systems Engineering Measurement Primer]]: A Basic Introduction to Measurement Concepts and Use for Systems Engineering,'' version 2.0. San Diego, CA, USA: International Council on System Engineering (INCOSE). INCOSE–TP–2010–005–02.
 +
 
 +
Oppenheim, B., E. Murman, and D. Sekor. 2010. ''[[Lean Enablers for Systems Engineering]]''.  Systems Engineering. 14(1). New York, NY, USA: Wiley and Sons, Inc.
  
INCOE MWG. 2010.  ''[[Systems Engineering Measurement Primer]] - A Basic Introduction to Measurement Concepts and Use for Systems Engineering," version 2.0. San Diego, CA, USA: Measurement Working Group, International Council on Systems Engineering (INCOSE). INCOSE-TP-2010-005-02.
+
Roedler, G., D. Rhodes, H. Schimmoller, and C. Jones (eds.). 2010.  ''[[Systems Engineering Leading Indicators Guide]],'' version 2.0. January 29, 2010, Published jointly by LAI, SEARI, INCOSE, PSM. INCOSE-TP-2005-001-03. Accessed on September 14, 2011. Available at http://seari.mit.edu/documents/SELI-Guide-Rev2.pdf.
  
 
===Additional References===
 
===Additional References===
*Jelinski, Z. and P.B. Moranda. 1972. Software Reliability Research. Statistical Computer Performance Evaluation (W. Freiberger. Ed); pp. 465-484, Academic Press, New York.
+
Jelinski, Z. and P.B. Moranda. 1972. "Software Reliability Research". In W. Freiberger. (ed.), ''Statistical Computer Performance Evaluation.'' New York, NY, USA: Academic Press. p. 465-484.
*Alhazmi, O. H. and Y. K. Malaiya. 2005. Modelling the Vunerability Discovery Process. Colorado State University, 16th IEEE International Symposium on Software Reliability Engineering.
+
 
*Alhazmi, O. H. and Y. K. Malaiya. 2006. Prediction Capabilities of Vulnerability Discovery Models. Colorado State University
+
Alhazmi O.H. and Y.K. Malaiya. 2005. ''Modeling the Vulnerability Discovery Process''. 16th IEEE International Symposium on Software Reliability Engineering (ISSRE'05). 8-11 November 2005. Chicago, IL, USA.
 +
 
 +
Alhazmi, O.H. and Y.K. Malaiya. 2006. "Prediction Capabilities of Vulnerability Discovery Models." Paper presented at Annual Reliability and Maintainability Symposium (RAMS). 23-26 January 2006. p 86-91. Newport Beach, CA, USA. Accessed on September 14, 2011. Available at http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=1677355&isnumber=34933.
 +
 
 
----
 
----
====Article Discussion====
+
<center>[[Organizing Business and Enterprises to Perform Systems Engineering|< Previous Article]] | [[Enabling Businesses and Enterprises|Parent Article]] | [[Developing Systems Engineering Capabilities within Businesses and Enterprises|Next Article >]]</center>
(H Davidz, 8/16)
+
 
*The introduction states that, "The governance levers that can be used to improve performance include people (selection, training, culture, incentives, - -), process, tools and infrastructure, and organisation. So the assessment of systems engineering performance in a business and enterprise needs to cover these dimensions and inform these choices."  If these dimensions are to be covered, perhaps there could be more discussion on how the
+
<center>'''SEBoK v. 2.9, released 20 November 2023'''</center>
 +
 
 +
[[Category: Part 5]][[Category:Topic]]
 +
[[Category:Enabling Businesses and Enterprises]]

Latest revision as of 22:02, 18 November 2023


Lead Authors: Hillary Sillitto, Alice Squires, Heidi Davidz, Contributing Authors: Art Pyster, Richard Beasley


At the project level, systems engineeringsystems engineering (SE) measurement focuses on indicators of project and system success that are relevant to the project and its stakeholders. At the enterprise level there are additional concerns. SE governancegovernance should ensure that the performance of systems engineering within the enterprise adds value to the organization, is aligned to the organization's purpose, and implements the relevant parts of the organization's strategy.

For enterprises that are traditional businessesbusinesses this is easier, because such organizations typically have more control levers than more loosely structured enterprises. The governance levers that can be used to improve performance include people (selection, training, culture, incentives), process, tools and infrastructure, and organization; therefore, the assessment of systems engineering performance in an enterprise should cover these dimensions.

Being able to aggregate high quality data about the performance of teams with respect to SE activities is certainly of benefit when trying to guide team activities. Having access to comparable data, however, is often difficult, especially in organizations that are relatively autonomous, use different technologies and tools, build products in different domains, have different types of customers, etc. Even if there is limited ability to reliably collect and aggregate data across teams, having a policy that consciously decides how the enterprise will address data collection and analysis is valuable.

Performance Assessment Measures

Typical measures for assessing SE performance of an enterprise include the following:

  • Effectiveness of SE process
  • Ability to mobilize the right resources at the right time for a new project or new project phase
  • Quality of SE process outputs
  • Timeliness of SE process outputs
  • SE added value to project
  • System added value to end users
  • SE added value to organization
  • Organization's SE capability development
  • Individuals' SE competence development
  • Resource utilization, current and forecast
  • Productivity of systems engineers
  • Deployment and consistent usage of tools and methods

How Measures Fit in the Governance Process and Improvement Cycle

Since collecting data and analyzing it takes effort that is often significant, measurement is best done when its purpose is clear and is part of an overall strategy. The "goal, question, metric" paradigm (Basili 1992) should be applied, in which measurement data is collected to answer specific questions, the answer to which helps achieve a goal, such as decreasing the cost of creating a system architecture or increasing the value of a system to a particular stakeholder. Figure 1 shows one way in which appropriate measures inform enterprise level governance and drive an improvement cycle such as the Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) model.


Figure 1. Assessing Systems Engineering Performance in Business or Enterprise: Part of Closed Loop Governance. (SEBoK Original)

Discussion of Performance Assessment Measures

Assessing SE Internal Process (Quality and Efficiency)

A processprocess is a "set of interrelated or interacting activities which transforms inputs into outputs." The SEI CMMI Capability Maturity Model (SEI 2010) provides a structured way for businesses and enterprises to assess their SE processes. In the CMMI, a process area is a cluster of related practices in an area that, when implemented collectively, satisfies a set of goals considered important for making improvement in that area. There are CMMI models for acquisition, for development, and for services (SEI 2010, 11). CMMI defines how to assess individual process areas against Capability Levels on a scale from 0 to 3, and overall organizational maturity on a scale from 1 to 5.

Assessing Ability to Mobilize for a New Project or New Project Phase

Successful and timely project initiation and execution depends on having the right people available at the right time. If key resources are deployed elsewhere, they cannot be applied to new projects at the early stages when these resources make the most difference. Queuing theory shows that if a resource pool is running at or close to capacity, delays and queues are inevitable.

The ability to manage teams through their lifecycle is an organizational capability that has substantial leverage on project and organizational efficiency and effectiveness. This includes being able to

  • mobilize teams rapidly;
  • establish and tailor an appropriate set of processes, metrics and systems engineering plans;
  • support them to maintain a high level of performance;
  • capitalize acquired knowledge; and
  • redeploy team members expeditiously as the team winds down.

Specialists and experts are used to a review process, critiquing solutions, creating novel solutions, and solving critical problems. Specialists and experts are usually a scarce resource. Few businesses have the luxury of having enough experts with all the necessary skills and behaviors on tap to allocate to all teams just when needed. If the skills are core to the business' competitive position or governance approach, then it makes sense to manage them through a governance process that ensures their skills are applied to greatest effect across the business.

Businesses typically find themselves balancing between having enough headroom to keep projects on schedule when things do not go as planned and utilizing resources efficiently.

Project SE Outputs (Cost, Schedule, Quality)

Many SE outputs in a project are produced early in the life cycle to enable downstream activities. Hidden defects in the early phase SE work products may not become fully apparent until the project hits problems in integration, verification and validation, or transition to operations. Intensive peer review and rigorous modeling are the normal ways of detecting and correcting defects in and lack of coherence between SE work products.

Leading indicators could be monitored at the organizational level to help direct support to projects or teams heading for trouble. For example, the INCOSE Leading Indicators report (Roedler et al. 2010) offers a set of indicators that is useful at the project level. Lean Sigma provides a tool for assessing benefit delivery throughout an enterprise value stream. Lean Enablers for Systems Engineering are now being developed (Oppenheim et al. 2010). An emerging good practice is to use lean value stream mappinglean value stream mapping to aid the optimization of project plans and process application.

In a mature organization, one good measure of SE quality is the number of defects that have to be corrected "out of phase"; i.e., at a later phase in the life cycle than the one in which the defect was introduced. This gives a good measure of process performance and the quality of SE outputs. Within a single project, the Work Product Approval, Review Action Closure, and Defect Error trends contain information that allows residual defect densities to be estimated (Roedler et al. 2010; Davies and Hunter 2001).

Because of the leverage of front-end SE on overall project performance, it is important to focus on quality and timeliness of SE deliverables (Woodcock 2009).

SE Added Value to Project

SE that is properly managed and performed should add value to the project in terms of quality, risk avoidance, improved coherence, better management of issues and dependencies, right-first-time integration and formal verification, stakeholder management, and effective scope management. Because quality and quantity of SE are not the only factors that influence these outcomes, and because the effect is a delayed one (good SE early in the project pays off in later phases) there has been a significant amount of research to establish evidence to underpin the asserted benefits of SE in projects.

A summary of the main results is provided in the Economic Value of Systems Engineering article.

System Added Value to End Users

System-added value to end users depends on system effectiveness and on alignment of the requirements and design to the end users' purpose and mission. System end users are often only involved indirectly in the procurement process.

Research on the value proposition of SE shows that good project outcomes do not necessarily correlate with good end user experience. Sometimes systems developers are discouraged from talking to end users because the acquirer is afraid of requirements creep. There is experience to the contrary – that end user involvement can result in more successful and simpler system solutions.

Two possible measures indicative of end user satisfaction are:

  1. The use of user-validated mission scenarios (both nominal and "rainy day" situations) to validate requirements, drive trade-offs and organize testing and acceptance;
  2. The use of technical performance measure (tpm)technical performance measure (tpm) to track critical performance and non-functional system attributes directly relevant to operational utility. The INCOSE SE Leading Indicators Guide (Roedler et al. 2010, 10 and 68) defines "technical measurement trends" as "Progress towards meeting the measure of effectiveness (moe)measure of effectiveness (moe) / measure of performance (mop)measure of performance (mop) / Key Performance Parameters (KPPs) and technical performance measure (tpm)technical performance measure (tpm)". A typical TPM progress plot is shown in Figure 2.
Figure 2. Technical Performance Measure (TPM) Tracking (Roedler et al. 2010). This material is reprinted with permission from the International Council on Systems Engineering (INCOSE). All other rights are reserved by the copyright owner.

SE Added Value to Organization

SE at the business/enterprise level aims to develop, deploy and enable effective SE to add value to the organization’s business. The SE function in the business/enterprise should understand the part it has to play in the bigger picture and identify appropriate performance measures - derived from the business or enterprise goals, and coherent with those of other parts of the organization - so that it can optimize its contribution.

Organization's SE Capability Development

The CMMI (SEI 2010) provides a means of assessing the process capability and maturity of businesses and enterprises. The higher CMMI levels are concerned with systemic integration of capabilities across the business or enterprise.

CMMI measures one important dimension of capability development, but CMMI maturity level is not a direct measure of business effectiveness unless the SE measures are properly integrated with business performance measures. These may include bid success rate, market share, position in value chain, development cycle time and cost, level of innovation and re-use, and the effectiveness with which SE capabilities are applied to the specific problem and solution space of interest to the business.

Individuals' SE Competence Development

Assessment of Individuals' SE competence development is described in Assessing Individuals.

Resource Utilization, Current and Forecast

Roedler et al. (2010, 58) offer various metrics for staff ramp-up and use on a project. Across the business or enterprise, key indicators include the overall manpower trend across the projects, the stability of the forward load, levels of overtime, the resource headroom (if any), staff turnover, level of training, and the period of time for which key resources are committed.

Deployment and Consistent Usage of Tools and Methods

It is common practice to use a range of software tools in an effort to manage the complexity of system development and in-service management. These range from simple office suites to complex logical, virtual reality and physics-based modeling environments.

Deployment of SE tools requires careful consideration of purpose, business objectives, business effectiveness, training, aptitude, method, style, business effectiveness, infrastructure, support, integration of the tool with the existing or revised SE process, and approaches to ensure consistency, longevity and appropriate configuration management of information. Systems may be in service for upwards of 50 years, but storage media and file formats that are 10-15 years old are unreadable on most modern computers. It is desirable for many users to be able to work with a single common model; it can be that two engineers sitting next to each other using the same tool use sufficiently different modeling styles that they cannot work on or re-use each others' models.

License usage over time and across sites and projects is a key indicator of extent and efficiency of tool deployment. More difficult to assess is the consistency of usage. Roedler et al. (2010, 73) recommend metrics on "facilities and equipment availability".

Practical Considerations

Assessment of SE performance at the business/enterprise level is complex and needs to consider soft issues as well as hard issues. Stakeholder concerns and satisfaction criteria may not be obvious or explicit. Clear and explicit reciprocal expectations and alignment of purpose, values, goals and incentives help to achieve synergy across the organization and avoid misunderstanding.

"What gets measured gets done." Because metrics drive behavior, it is important to ensure that metrics used to manage the organization reflect its purpose and values, and that they do not drive perverse behaviors (Roedler et al. 2010).

Process and measurement cost money and time, so it is important to get the right amount of process definition and the right balance of investment between process, measurement, people and skills. Any process flexible enough to allow innovation will also be flexible enough to allow mistakes. If process is seen as excessively restrictive or prescriptive, it may inhibit innovation and demotivate the innovators in an effort to prevent mistakes, leading to excessive risk avoidance.

It is possible for a process improvement effort to become an end in itself rather than a means to improve business performance (Sheard 2003). To guard against this, it is advisable to remain clearly focused on purpose (Blockley and Godfrey 2000) and on added value (Oppenheim et al. 2010) as well as to ensure clear and sustained top management commitment to driving the process improvement approach to achieve the required business benefits. Good process improvement is as much about establishing a performance culture as about process.

The Systems Engineering process is an essential complement to, and is not a substitute for, individual skill, creativity, intuition, judgment etc. Innovative people need to understand the process and how to make it work for them, and neither ignore it nor be slaves to it. Systems Engineering measurement shows where invention and creativity need to be applied. SE process creates a framework to leverage creativity and innovation to deliver results that surpass the capability of the creative individuals – results that are the emergent properties of process, organisation, and leadership. (Sillitto 2011)

References

Works Cited

Basili, V. 1992. "Software Modeling and Measurement: The Goal/Question/Metric Paradigm" Technical Report CS-TR-2956. University of Maryland: College Park, MD, USA. Accessed on August 28, 2012. Available at http://www.cs.umd.edu/~basili/publications/technical/T78.pdf.

Blockley, D. and P. Godfrey. 2000. Doing It Differently – Systems for Rethinking Construction. London, UK: Thomas Telford Ltd.

Davies, P. and N. Hunter. 2001. "System Test Metrics on a Development-Intensive Project." Paper presented at the 11th Annual International Council on System Engineering (INCOSE) International Symposium. 1-5 July 2001. Melbourne, Australia.

Oppenheim, B., E. Murman, and D. Sekor. 2010. Lean Enablers for Systems Engineering. Systems Engineering. 14(1). New York, NY, USA: Wiley and Sons, Inc.

Roedler, G. D. Rhodes, H. Schimmoller, and C. Jones (eds.). 2010. Systems Engineering Leading Indicators Guide, version 2.0. January 29, 2010, Published jointly by LAI, SEARI, INCOSE, and PSM. INCOSE-TP-2005-001-03. Accessed on September 14, 2011. Available at http://seari.mit.edu/documents/SELI-Guide-Rev2.pdf.

SEI. 2010. CMMI for Development, version 1.3. Pittsburgh, PA, USA: Software Engineering Institute/Carnegie Mellon University. CMU/SEI-2010-TR-033. Accessed on September 14, 2011. Available at http://www.sei.cmu.edu/reports/10tr033.pdf.

Sheard, S, 2003. "The Lifecycle of a Silver Bullet." Crosstalk: The Journal of Defense Software Engineering. (July 2003). Accessed on September 14, 2011. Available at http://www.crosstalkonline.org/storage/issue-archives/2003/200307/200307-Sheard.pdf.

Sillitto, H. 2011. Panel on "People or Process, Which is More Important". Presented at the 21st Annual International Council on Systems Engineering (INCOSE) International Symposium. 20-23 June 2011. Denver, CO, USA.

Woodcock, H. 2009. "Why Invest in Systems Engineering." INCOSE UK Chapter. Z-3 Guide, Issue 3.0. March 2009. Accessed on September 14, 2011. Available at http://www.incoseonline.org.uk/Documents/zGuides/Z3_Why_invest_in_SE.pdf.

Primary References

Basili, V. 1992. "Software Modeling and Measurement: The Goal/Question/Metric Paradigm". College Park, MD, USA: University of Maryland. Technical Report CS-TR-2956. Accessed on August 28, 2012. Available at http://www.cs.umd.edu/~basili/publications/technical/T78.pdf.

Frenz, P., et al. 2010. Systems Engineering Measurement Primer: A Basic Introduction to Measurement Concepts and Use for Systems Engineering, version 2.0. San Diego, CA, USA: International Council on System Engineering (INCOSE). INCOSE–TP–2010–005–02.

Oppenheim, B., E. Murman, and D. Sekor. 2010. Lean Enablers for Systems Engineering. Systems Engineering. 14(1). New York, NY, USA: Wiley and Sons, Inc.

Roedler, G., D. Rhodes, H. Schimmoller, and C. Jones (eds.). 2010. Systems Engineering Leading Indicators Guide, version 2.0. January 29, 2010, Published jointly by LAI, SEARI, INCOSE, PSM. INCOSE-TP-2005-001-03. Accessed on September 14, 2011. Available at http://seari.mit.edu/documents/SELI-Guide-Rev2.pdf.

Additional References

Jelinski, Z. and P.B. Moranda. 1972. "Software Reliability Research". In W. Freiberger. (ed.), Statistical Computer Performance Evaluation. New York, NY, USA: Academic Press. p. 465-484.

Alhazmi O.H. and Y.K. Malaiya. 2005. Modeling the Vulnerability Discovery Process. 16th IEEE International Symposium on Software Reliability Engineering (ISSRE'05). 8-11 November 2005. Chicago, IL, USA.

Alhazmi, O.H. and Y.K. Malaiya. 2006. "Prediction Capabilities of Vulnerability Discovery Models." Paper presented at Annual Reliability and Maintainability Symposium (RAMS). 23-26 January 2006. p 86-91. Newport Beach, CA, USA. Accessed on September 14, 2011. Available at http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=1677355&isnumber=34933.