Difference between revisions of "CMMI for Development: Guidelines for Process Integration and Product Improvement"
Jump to navigation
Jump to search
Wikiexpert (talk | contribs) |
m (Text replacement - "SEBoK v. 2.9, released 13 November 2023" to "SEBoK v. 2.9, released 20 November 2023") |
||
(18 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
− | <blockquote> | + | <blockquote>Chrissis, M.B, M. Konrad, S. Shrum. 2011. ''CMMI for Development: Guidelines for Process Integration and Product Improvement'', 3rd ed. Boston, MA, USA: Addison-Wesley Professional.</blockquote> |
+ | ==Usage== | ||
+ | This source is considered a primary reference for the following articles: | ||
+ | *[[Relationships between Systems Engineering and Project Management]] | ||
+ | *[[Quality Management]] | ||
==Annotation== | ==Annotation== | ||
− | + | Please note that this is a document created as a companion to the current version of the CMMI for Development guidance; it is not the same as the SEI/CMU guidance itself. To review the most current CMMI for Development guidance (version 1.3), please see [http://www.sei.cmu.edu/reports/10tr033.pdf the SEI website]. | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
[[Category:Primary Reference]] | [[Category:Primary Reference]] | ||
− | + | <center>'''SEBoK v. 2.9, released 20 November 2023'''</center> |
Latest revision as of 22:05, 18 November 2023
Chrissis, M.B, M. Konrad, S. Shrum. 2011. CMMI for Development: Guidelines for Process Integration and Product Improvement, 3rd ed. Boston, MA, USA: Addison-Wesley Professional.
Usage
This source is considered a primary reference for the following articles:
Annotation
Please note that this is a document created as a companion to the current version of the CMMI for Development guidance; it is not the same as the SEI/CMU guidance itself. To review the most current CMMI for Development guidance (version 1.3), please see the SEI website.