Difference between revisions of "Critical Design Review (CDR) (glossary)"
Jump to navigation
Jump to search
m (moved Critical Design Review (CDR) to critical design review (cdr) : Changed to align with new glossary article formatting.) |
|||
Line 1: | Line 1: | ||
− | ''<blockquote>Review event planned in order to verify and validate the set of system requirements, the design artefacts and justification elements at the end of the last engineering loop. | + | ''<blockquote>Review event planned in order to verify and validate the set of [[System Requirement (glossary)|system requirements]], the [[Design (glossary)|design]] artefacts and justification [[Element (glossary)|elements]] at the end of the last [[Engineering (glossary)|engineering]] loop.</blockquote>'' |
====Source==== | ====Source==== | ||
− | + | This definition was developed for the SEBoK version 0.5. ‘’Note to reviewers’’: If you are aware of a more authoritative definition, please provide this information in your review. | |
===Discussion=== | ===Discussion=== | ||
− | + | There is currently no discussion for this term. This will be completed for SEBoK version 1.0. | |
[[Category:Glossary of Terms]] | [[Category:Glossary of Terms]] |
Revision as of 00:21, 17 September 2011
Review event planned in order to verify and validate the set of system requirements, the design artefacts and justification elements at the end of the last engineering loop.
Source
This definition was developed for the SEBoK version 0.5. ‘’Note to reviewers’’: If you are aware of a more authoritative definition, please provide this information in your review.
Discussion
There is currently no discussion for this term. This will be completed for SEBoK version 1.0.