Difference between revisions of "Decision Gate (glossary)"

From SEBoK
Jump to navigation Jump to search
 
Line 4: Line 4:
  
 
====Source(s)====
 
====Source(s)====
Forsberg, K., H. Mooz, H. Cotterman. 2005. [[Visualizing Project Management]], 3rd Ed., John Wiley and Sons.
+
Forsberg, K., H. Mooz, H. Cotterman. 2005. [[Visualizing Project Management]], 3rd Ed., Hoboken, NJ, USA: John Wiley and Sons.
  
 
INCOSE. 2011. [[INCOSE Systems Engineering Handbook|Systems Engineering Handbook]], version 3.2.1. INCOSE-TP-2003-002-03.2.1.
 
INCOSE. 2011. [[INCOSE Systems Engineering Handbook|Systems Engineering Handbook]], version 3.2.1. INCOSE-TP-2003-002-03.2.1.

Revision as of 09:21, 14 September 2011

(1) A decision gate is an approval event (often associated with a review meeting). Entry and Exit criteria are established for each decision gate; continuation beyond the decision gate is contingent on the agreement of the decision-makers. (INCOSE 2011 p 360)

(2) A preplanned management event in the project cycle to demonstrate accomplishments, approve and baseline results, and approve the approach for continuing the project. (Also known as a control gate.) (Forsberg, Mooz, Cotterman 2005, p 428)

Source(s)

Forsberg, K., H. Mooz, H. Cotterman. 2005. Visualizing Project Management, 3rd Ed., Hoboken, NJ, USA: John Wiley and Sons.

INCOSE. 2011. Systems Engineering Handbook, version 3.2.1. INCOSE-TP-2003-002-03.2.1.

Discussion

1 - The definition provided in the INCOSE Handbook is built on the language in ISO/IEC 15288:2008. Consequently it is at a high level of abstraction.

2 - The definition in "Visualizing Project Management" is tied to the project cycle and the project management issues related to it. The intent is to bring the systems engineering activities into the project context.

Written by Kevin Forsberg, coauthor and contributor to both references.