Difference between revisions of "Engineering Change Proposal (ECP) (glossary)"
Jump to navigation
Jump to search
m (Text replace - "{{5comments}}" to "") |
m (Text replacement - "SEBoK v. 2.9, released 13 November 2023" to "SEBoK v. 2.9, released 20 November 2023") |
||
(18 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | <blockquote>'' An | + | <blockquote>'' An engineering change proposal (ECP) is the management tool used to propose a configuration change to a configuration item (CI) and the system's baselined performance requirements and configuration documentation established during design and development of the system'' (DoD 2001) </blockquote> |
− | === | + | ===Sources=== |
− | MIL-HDBK-61A Configuration | + | DoD. 2001. ''MIL-HDBK-61A(SE) Configuration Management Handbook'', 7 February 2001. Accessed on 11 September 2012. Available at https://acc.dau.mil/CommunityBrowser.aspx?id=142238. |
===Discussion=== | ===Discussion=== | ||
− | + | None. | |
− | |||
[[Category:Glossary of Terms]] | [[Category:Glossary of Terms]] | ||
− | + | <center>'''SEBoK v. 2.9, released 20 November 2023'''</center> | |
− | |||
− |
Latest revision as of 21:56, 18 November 2023
An engineering change proposal (ECP) is the management tool used to propose a configuration change to a configuration item (CI) and the system's baselined performance requirements and configuration documentation established during design and development of the system (DoD 2001)
Sources
DoD. 2001. MIL-HDBK-61A(SE) Configuration Management Handbook, 7 February 2001. Accessed on 11 September 2012. Available at https://acc.dau.mil/CommunityBrowser.aspx?id=142238.