Difference between revisions of "Engineering Change Proposal (ECP) (glossary)"

From SEBoK
Jump to navigation Jump to search
m (Text replacement - "<center>'''SEBoK v. 2.0, released 1 June 2019'''</center>" to "<center>'''SEBoK v. 2.1, released 31 October 2019'''</center>")
m (Text replacement - "SEBoK v. 2.9, released 13 November 2023" to "SEBoK v. 2.9, released 20 November 2023")
 
(9 intermediate revisions by one other user not shown)
Line 8: Line 8:
 
[[Category:Glossary of Terms]]
 
[[Category:Glossary of Terms]]
  
<center>'''SEBoK v. 2.1, released 31 October 2019'''</center>
+
<center>'''SEBoK v. 2.9, released 20 November 2023'''</center>

Latest revision as of 21:56, 18 November 2023

An engineering change proposal (ECP) is the management tool used to propose a configuration change to a configuration item (CI) and the system's baselined performance requirements and configuration documentation established during design and development of the system (DoD 2001)

Sources

DoD. 2001. MIL-HDBK-61A(SE) Configuration Management Handbook, 7 February 2001. Accessed on 11 September 2012. Available at https://acc.dau.mil/CommunityBrowser.aspx?id=142238.

Discussion

None.

SEBoK v. 2.9, released 20 November 2023