Difference between revisions of "Guide for Integrating Systems Engineering into DoD Acquisition Contracts"
Jump to navigation
Jump to search
(Created page with '<blockquote>Complete Bibliographic Entry</blockquote> Please note: bibliographic entries should follow Chicago Manual of Style (15th ed.). Please see [http://www.bkcase.org/fi...') |
|||
Line 1: | Line 1: | ||
− | <blockquote> | + | <blockquote>(DoD 2006a) DoD. 2006. Guide for Integrating Systems Engineering into DoD Acquisition Contracts. Washington, D.C.: Office of the Undersecretary of Defense (AT&L).</blockquote> |
− | |||
− | |||
==Annotation== | ==Annotation== | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | === | + | ===Systems Engineering and Procurement/Acquisition=== |
− | Annotation for Article | + | Annotation for Article. |
[[Category:Primary Reference]] | [[Category:Primary Reference]] |
Revision as of 15:07, 23 August 2011
(DoD 2006a) DoD. 2006. Guide for Integrating Systems Engineering into DoD Acquisition Contracts. Washington, D.C.: Office of the Undersecretary of Defense (AT&L).
Annotation
Systems Engineering and Procurement/Acquisition
Annotation for Article.