Difference between revisions of "Installation (glossary)"

From SEBoK
Jump to navigation Jump to search
m (Text replace - "====Source====" to "===Source===")
m (Text replacement - "SEBoK v. 2.9, released 13 November 2023" to "SEBoK v. 2.9, released 20 November 2023")
 
(14 intermediate revisions by 3 users not shown)
Line 2: Line 2:
  
 
===Source===
 
===Source===
ISO/IEC. 2009. ''Systems and Software Engineering Vocabulary (SEVocab)'' - ISO/IEC 24765. in International Organization for Standardization (ISO)/International Electronical Commission (IEC) [database online]. Geneva, Switzerland, 2009 [cited December 21, 2009]. Available from http://pascal.computer.org/sev_display/index.action.
+
ISO/IEC. 2009. ''Systems and Software Engineering Vocabulary (SEVocab)'' - ISO/IEC 24765. in International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) [database online]. Geneva, Switzerland, 2009 [cited December 21, 2009]. Available from http://pascal.computer.org/sev_display/index.action.
  
 
===Discussion===
 
===Discussion===
Line 8: Line 8:
  
 
[[Category:Glossary of Terms]]
 
[[Category:Glossary of Terms]]
{{DISQUS}}
+
<center>'''SEBoK v. 2.9, released 20 November 2023'''</center>

Latest revision as of 22:45, 18 November 2023

Period of time in the system life cycle during which a product is integrated into its operational environment and tested in this environment to ensure that it performs as required. (Adapted from (ISO/IEC 2009))

Source

ISO/IEC. 2009. Systems and Software Engineering Vocabulary (SEVocab) - ISO/IEC 24765. in International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) [database online]. Geneva, Switzerland, 2009 [cited December 21, 2009]. Available from http://pascal.computer.org/sev_display/index.action.

Discussion

None.

SEBoK v. 2.9, released 20 November 2023