Difference between revisions of "Integration and Test Strategies for Complex Manufacturing Machines"

From SEBoK
Jump to navigation Jump to search
(Created page with "de Jong, I. 2008. ''Integration and Test Strategies for Complex Manufacturing Machines: Integration and Testing Combined in a Single Planning and Optimization Framework''....")
 
Line 3: Line 3:
 
==Annotation==
 
==Annotation==
  
Annotation.
+
This PhD thesis research project goal is to reduce the duration of the integration and test phase of large complex embedded systems.  It uses a Wafer Scanner as an example.  The work was performed at the Embedded Systems Institute in Eindhoven.
  
 
[[Category:Primary Reference]]
 
[[Category:Primary Reference]]

Revision as of 22:35, 24 July 2012

de Jong, I. 2008. Integration and Test Strategies for Complex Manufacturing Machines: Integration and Testing Combined in a Single Planning and Optimization Framework. Saarbrücken, Germany: Verlag.

Annotation

This PhD thesis research project goal is to reduce the duration of the integration and test phase of large complex embedded systems. It uses a Wafer Scanner as an example. The work was performed at the Embedded Systems Institute in Eindhoven.