Difference between revisions of "Matrix of Implementation Examples"

From SEBoK
Jump to navigation Jump to search
 
Line 105: Line 105:
 
|(Water Mgt. Singapore)
 
|(Water Mgt. Singapore)
 
|-
 
|-
|'''SEBoK Topic 2 (insert link to article)'''
+
|[[Mission Analysis and Stakeholder Requirements]]
 
|(HST)
 
|(HST)
 
|(GPS)
 
|(GPS)
Line 120: Line 120:
 
|(Water Mgt. Singapore)
 
|(Water Mgt. Singapore)
 
|-
 
|-
|'''SEBoK Topic 3 (insert link to article)'''
+
|[[System Requirements]]
 
|(HST)
 
|(HST)
 
|(GPS)
 
|(GPS)
Line 135: Line 135:
 
|(Water Mgt. Singapore)
 
|(Water Mgt. Singapore)
 
|-
 
|-
|'''SEBoK Topic 4 (insert link to article)'''
+
|[[Architectural Design]]
 
|(HST)
 
|(HST)
 
|(GPS)
 
|(GPS)
Line 150: Line 150:
 
|(Water Mgt. Singapore)
 
|(Water Mgt. Singapore)
 
|-
 
|-
|'''SEBoK Topic 5 (insert link to article)'''
+
|[[System Analysis]]
 
|(HST)
 
|(HST)
 
|(GPS)
 
|(GPS)
Line 165: Line 165:
 
|(Water Mgt. Singapore)
 
|(Water Mgt. Singapore)
 
|-
 
|-
|'''SEBoK Topic 6 (insert link to article)'''
+
|[[System Implementation]]
 
|(HST)
 
|(HST)
 
|(GPS)
 
|(GPS)
Line 180: Line 180:
 
|(Water Mgt. Singapore)
 
|(Water Mgt. Singapore)
 
|-
 
|-
|'''SEBoK Topic 7 (insert link to article)'''
+
|[[System Integration]]
 
|(HST)
 
|(HST)
 
|(GPS)
 
|(GPS)
Line 195: Line 195:
 
|(Water Mgt. Singapore)
 
|(Water Mgt. Singapore)
 
|-
 
|-
|'''SEBoK Topic 8 (insert link to article)'''
+
|[[System Verification and Validation]]
 
|(HST)
 
|(HST)
 
|(GPS)
 
|(GPS)
Line 210: Line 210:
 
|(Water Mgt. Singapore)
 
|(Water Mgt. Singapore)
 
|-
 
|-
|'''SEBoK Topic 9 (insert link to article)'''
+
|[[System Deployment]]
 
|(HST)
 
|(HST)
 
|(GPS)
 
|(GPS)
Line 225: Line 225:
 
|(Water Mgt. Singapore)
 
|(Water Mgt. Singapore)
 
|-
 
|-
|'''SEBoK Topic 10 (insert link to article)'''
+
|[[Operation of the System]]
 
|(HST)
 
|(HST)
 
|(GPS)
 
|(GPS)
Line 240: Line 240:
 
|(Water Mgt. Singapore)
 
|(Water Mgt. Singapore)
 
|-
 
|-
|'''SEBoK Topic 11 (insert link to article)'''
+
|[[System Maintenance]]
 
|(HST)
 
|(HST)
 
|(GPS)
 
|(GPS)

Revision as of 15:33, 8 July 2011

Below is a matrix with the implementation examples in this section and how they map to the knowledge areas in the SEBoK.

Abbreviations:

HST Hubble Space Telescope Case Study
GPS Global Positioning System Case Study
FBI VCF FBI Virtual Case File Case Study
ISS International Space Station Case Study
MSTI MSTI Case Study
Shuttle Space Shuttle Case Study
Light Rail (Korea) Korean Light Rail Case Study
Bag Handling Denver Airport Baggage Handling System Vignette
IDEF GE Birth of IDEF Vignette
VA Sub Virginia Class Submarine Vignette
Route Modernisation (UK) UK West Coast Route Modernisation Project Vignette
Water Mgt. (Singapore) Singapore Water Management Vignette


Implementation Examples. Coverage of SEBoK Topics for Each Case Study or Vignette.
SEBoK Topic HST GPS MedRad FBI VCF ISS MSTI Shuttle Light Rail (Korea) Bag Handling IDEF VA Sub Route Modernization (UK) Water Mgt. (Singapore)
SEBoK 0.5 Introduction (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
Systems (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
Life Cycle Models X (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
Mission Analysis and Stakeholder Requirements (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
System Requirements (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
Architectural Design (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
System Analysis (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
System Implementation (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
System Integration (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
System Verification and Validation (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
System Deployment (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
Operation of the System (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
System Maintenance (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
SEBoK Topic 12 (insert link to article) (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
SEBoK Topic 13 (insert link to article) (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
SEBoK Topic 14 (insert link to article) (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
SEBoK Topic 15 (insert link to article) (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
SEBoK Topic 16 (insert link to article) (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
SEBoK Topic 17 (insert link to article) (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
SEBoK Topic 18 (insert link to article) (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
SEBoK Topic 19 (insert link to article) (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
SEBoK Topic 20 (insert link to article) (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)
SEBoK Topic 21 (insert link to article) (HST) (GPS) (MedRad) (FBI VCF) (ISS) (MSTI) (Shuttle) (Light Rail) (Denver Air) (IDEF) (VA Sub) (Rt. Mod. UK) (Water Mgt. Singapore)


References

Please make sure all references are listed alphabetically and are formatted according to the Chicago Manual of Style (15th ed). See the BKCASE Reference Guidance for additional information.

Citations

List all references cited in the article. Note: SEBoK 0.5 uses Chicago Manual of Style (15th ed). See the BKCASE Reference Guidance for additional information.

Primary References

All primary references should be listed in alphabetical order. Remember to identify primary references by creating an internal link using the ‘’’reference title only’’’ (title). Please do not include version numbers in the links.

Additional References

All additional references should be listed in alphabetical order.


Article Discussion

[Go to discussion page]