The following matrix maps the SEBoK [[Systems Engineering Implementation Examples]] to knowledge areas in the [[SEBoK 0.5 Outline|Systems Engineering Body of Knowledge (SEBoK)]]. It provides both a list of potential systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example.  Since the number of topics in the SEBoK is extensive, only a subset are included here for clarity.  For additional information, see the implementation example of interest and the corresponding SEBoK topic.
+
----
 +
'''''Lead Authors:''''' ''Heidi Davidz, Alice Squires, Tom Hilburn'', '''''Contributing Authors:''''' ''Alex Lee, John Brackett, Richard Turner''
 +
----
 +
The following matrix maps the [[Systems Engineering Implementation Examples]] to topics in the [[SEBoK Table of Contents|Systems Engineering Body of Knowledge (SEBoK)]]. It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example.  Since the number of topics in the SEBoK is extensive, only a subset is included here for clarity.  For additional information, see the example of interest and the corresponding SEBoK topic.
  
 
+
==Organization and Mapping of Examples to the SEBoK==
The following abbreviations shown in Table 1 (Developed for BKCASE) are used for the implementation examples:  
+
The following short titles shown in Table 1 are used for the implementation examples:  
{|
+
 +
{| align="center"
 +
|+'''Table 1.  Short Titles for the SEBoK Examples.'''  (SEBoK Original)
 +
|-
 +
! scope="col" colspan="2" | Case Studies
 +
|-
 +
|'''BT'''
 +
|Business Transformation
 +
|-
 +
|'''ATC'''
 +
|NextGen Air Traffic Control
 +
|-
 +
|'''NASA'''
 +
| NASA's Mission to Saturn
 +
|-
 +
|'''HST'''
 +
|Hubble Space Telescope
 +
|-
 +
|'''GPS'''
 +
|Global Positioning System
 +
|-
 +
|'''GPS II'''
 +
|Global Positioning System II
 +
|-
 +
|'''Radiation'''
 +
|Medical Radiation
 +
|-
 +
|'''FBI VCF'''
 +
|FBI Virtual Case File System
 +
|-
 +
|'''MSTI'''
 +
|Miniature Seeker Technology Integration
 +
|-
 +
|'''Infusion Pump'''
 +
|Next Generation Medical Infusion Pump
 +
|-
 +
|'''DfM'''
 +
|Design for Maintainability
 +
|-
 +
|'''CAS'''
 +
|Complex Adaptive Operating System
 +
|-
 +
|'''PM'''
 +
|Project Management
 +
|-
 +
|'''TS'''
 +
|Taxi Service
 +
|-
 +
|'''SWFTS'''
 +
|SWFTS MBSE
 +
|-
 +
|'''Bag Handling'''
 +
|Denver Airport Baggage Handling System
 
|-
 
|-
|HST
+
|'''VA Sub'''
|Hubble Space Telescope Case Study
+
|Virginia Class Submarine
|
 
|Bag Handling
 
|Denver Airport Baggage Handling System Vignette
 
 
|-
 
|-
|GPS
+
|'''Route Mod'''
|Global Positioning System Case Study
+
|UK West Coast Route Modernisation Project
|
 
|VA Sub
 
|Virginia Class Submarine Vignette
 
 
|-
 
|-
|Radiation
+
|'''Water Mgmt'''
|Medical Radiation Case Study
+
|Singapore Water Management
|
 
|Route Mod
 
|UK West Coast Route Modernisation Project Vignette
 
 
|-
 
|-
|FBI VCF
+
|'''FAA AAS'''
|FBI Virtual Case File Case Study
+
|FAA Advanced Automation System
|
 
|Water Mgmt
 
|Singapore Water Management Vignette
 
 
|-
 
|-
|MSTI
+
|'''Light Rail'''
|MSTI Case Study
+
|Standard Korean Light Transit System
|
 
|FAA AAS
 
|FAA AAS Vignette
 
 
|-
 
|-
|Infusion Pump
+
|'''TMT'''
|Next Generation Medical Infusion Pump Case Study
+
|Thirty-Meter Telescope
|
 
|Light Rail
 
|Standard Korean Light Transit System Vignette
 
 
|}
 
|}
  
 +
Table 2 shows how the topics (each row) align with the first set of implementation examples (each column):
  
{|
+
{| align="center"
|+'''Table 2. Implementation Examples.''' Coverage of SEBoK Topics for Each Case Study and Vignette (Table Developed for BKCASE).
+
|+'''Table 2. Implementation Examples based on published case studies.''' (SEBoK Original)
 
!SEBoK Topic
 
!SEBoK Topic
![[Hubble Space Telescope Case Study|HST]]
+
!BT
![[Global Positioning System Case Study|GPS]]
+
!ATC
![[Medical Radiation Case Study|Radiation]]
+
!NASA
![[FBI Virtual Case File System Case Study|FBI VCF]]
+
!HST
![[MSTI Case Study|MSTI]]
+
!GPS
![[Next Generation Medical Infusion Pump Case Study|Infusion Pump]]
+
!GPS II
![[Denver Airport Baggage Handling System Vignette|Bag Handling]]
+
!Radiation
![[Virginia Class Submarine Vignette|VA Sub]]
+
!FBI VCF
![[UK West Coast Route Modernisation Project Vignette|Route Mod]]
+
!MSTI
![[Singapore Water Management Vignette|Water Mgmt]]
+
!Infusion Pump
![[FAA AAS Vignette|FAA AAS]]
+
!DfM
![[Standard Korean Light Transit System Vignette|Light Rail]]
+
!CAS
 +
!PM
 +
!TS
 +
!SWFTS
 +
!NHS
 
|-
 
|-
![[Systems]]
+
|[[Systems Thinking]]
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 
|
 
|
 
!X
 
!X
 +
!X
 +
!X
 +
!X
 +
!X
 +
!X
 +
!X
 +
|
 +
|
 +
|-
 +
|[[Representing Systems with Models|Models and Simulation]]
 
|
 
|
 +
!X
 +
!X
 
|
 
|
 
|
 
|
 
!X
 
!X
 
|
 
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
!X
 +
!X
 +
!X
 
|
 
|
 
|-
 
|-
![[Systems Thinking]]
+
|[[Product Systems Engineering]]
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 +
|
 +
!X
 +
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
!X
 +
|-
 +
|[[Service Systems Engineering]]
 +
|
 +
|
 +
!X
 
|
 
|
 
|
 
|
Line 86: Line 168:
 
|
 
|
 
|
 
|
 +
|
 +
!X
 +
|
 +
!X
 
|-
 
|-
![[Life Cycle Models]]
+
|[[Enterprise Systems Engineering]]
 +
!X
 +
!X
 
!X
 
!X
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
!X
 +
!X
 +
|
 +
!X
 +
|-
 +
|[[Systems of Systems (SoS)]]
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 +
|
 +
!X
 +
|
 +
|
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 101: Line 209:
 
!X
 
!X
 
|-
 
|-
![[Mission Analysis and Stakeholders Requirements]]
+
|[[Life Cycle Models]]
 +
!X
 +
|
 +
|
 +
!X
 +
!X
 
|
 
|
 +
|
 +
|
 +
!X
 +
!X
 +
!X
 +
!X
 
|
 
|
 
|
 
|
 
!X
 
!X
 
|
 
|
 +
|-
 +
|[[Business or Mission Analysis]]
 +
!X
 
!X
 
!X
 
|
 
|
 +
|
 +
|
 +
!X
 
|
 
|
 
!X
 
!X
 +
|
 
!X
 
!X
 
|
 
|
 +
|
 +
!X
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
![[System Requirements]]
+
|[[Stakeholder Needs and Requirements]]
 
!X
 
!X
 
!X
 
!X
Line 123: Line 253:
 
!X
 
!X
 
|
 
|
 +
!X
 
|
 
|
 
!X
 
!X
 
|
 
|
 +
|
 +
!X
 
!X
 
!X
 
!X
 
!X
 +
|
 
|-
 
|-
![[Architectural Design]]
+
|[[System Requirements]]
 +
|
 +
|
 
|
 
|
 +
!X
 
!X
 
!X
 
|
 
|
 
|
 
|
 
!X
 
!X
 +
|
 
!X
 
!X
 +
|
 +
|
 +
!X
 +
!X
 +
!X
 +
|
 +
|-
 +
|[[System Architecture]]
 
!X
 
!X
 
!X
 
!X
 +
|
 
|
 
|
 
!X
 
!X
 +
!X
 +
|
 +
|
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 
|-
 
|-
![[System Analysis]]
+
|[[System Analysis]]
 +
|
 +
|
 +
!X
 
|
 
|
 
!X
 
!X
Line 150: Line 309:
 
|
 
|
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
Line 156: Line 314:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
![[System Implementation]]
+
|[[System Implementation]]
 +
|
 +
|
 +
|
 
|
 
|
 
!X
 
!X
Line 164: Line 327:
 
|
 
|
 
|
 
|
 +
|
 +
!X
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
 +
|-
 +
|[[System Integration]]
 +
!X
 
|
 
|
 
!X
 
!X
|-
 
![[System Integration]]
 
 
!X
 
!X
 
!X
 
!X
 +
!X
 +
|
 
|
 
|
 +
!X
 
|
 
|
 
!X
 
!X
 
|
 
|
 
!X
 
!X
 +
!X
 +
|
 +
|
 +
|-
 +
|[[System Verification]]
 
|
 
|
 
|
 
|
Line 184: Line 359:
 
|
 
|
 
!X
 
!X
|-
 
![[System Verification and Validation]]
 
 
|
 
|
!X
 
 
!X
 
!X
 
|
 
|
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|[[System Validation]]
 
!X
 
!X
 
|
 
|
Line 198: Line 378:
 
!X
 
!X
 
!X
 
!X
 +
!X
 +
|
 +
!X
 +
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 
|-
 
|-
![[System Deployment]]
+
|[[System Deployment]]
 +
|
 +
|
 +
|
 
|
 
|
 +
!X
 
!X
 
!X
 
|
 
|
Line 206: Line 400:
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
Line 211: Line 406:
 
|
 
|
 
|
 
|
!X
 
 
|-
 
|-
![[Operation of the System]]
+
|[[Operation of the System]]
 +
|
 +
|
 +
|
 
|
 
|
 +
!X
 
!X
 
!X
 
|
 
|
Line 220: Line 418:
 
|
 
|
 
!X
 
!X
|
+
!X
 
|
 
|
 
|
 
|
Line 227: Line 425:
 
!X
 
!X
 
|-
 
|-
![[System Maintenance]]
+
|[[System Maintenance]]
 +
|
 +
|
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 241: Line 443:
 
!X
 
!X
 
|-
 
|-
![[Logistics]]
+
|[[Logistics]]
 +
|
 +
|
 +
|
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 248: Line 455:
 
|
 
|
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
Line 255: Line 461:
 
|
 
|
 
|-
 
|-
![[Planning]]
+
|[[Planning]]
 +
!X
 +
!X
 +
|
 
!X
 
!X
 +
|
 
|
 
|
 
|
 
|
Line 262: Line 472:
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 
!X
 
!X
 
|
 
|
 +
|
 +
|
 +
|-
 +
|[[Assessment and Control]]
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
!X
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 +
|
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
![[Assessment and Control]]
+
|[[Risk Management]]
 +
|
 
|
 
|
 +
!X
 +
!X
 +
!X
 +
!X
 +
!X
 +
!X
 
|
 
|
 
!X
 
!X
 +
|
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 +
|
 +
|-
 +
|[[Measurement]]
 +
|
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 281: Line 525:
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|[[Decision Management]]
 
!X
 
!X
|-
+
|
![[Risk Management]]
+
|
 +
|
 +
|
 +
|
 +
|
 +
|
 
!X
 
!X
 +
|
 +
|
 
!X
 
!X
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 +
|-
 +
|[[Configuration Management]]
 +
|
 +
|
 +
|
 
|
 
|
 
!X
 
!X
 
!X
 
!X
 +
|
 
|
 
|
 
!X
 
!X
 +
|
 
!X
 
!X
 
!X
 
!X
!X
+
|
 +
|
 +
|
 +
|
 
|-
 
|-
![[Measurement]]
+
|[[Information Management]]
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
Line 310: Line 582:
 
|
 
|
 
!X
 
!X
 +
!X
 +
!X
 +
|
 +
|
 
|-
 
|-
![[Decision Management]]
+
|[[Quality Management]]
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 317: Line 603:
 
|
 
|
 
!X
 
!X
 +
|
 +
|-
 +
|[[Enabling Systems Engineering]]
 +
|
 
|
 
|
 
!X
 
!X
Line 323: Line 613:
 
!X
 
!X
 
|
 
|
 +
|
 +
!X
 +
!X
 +
!X
 +
!X
 +
!X
 +
|
 +
!X
 
|
 
|
 
|-
 
|-
![[Configuration Management]]
+
|[[Related Disciplines]]
 +
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 
!X
 
!X
 
|
 
|
Line 336: Line 637:
 
!X
 
!X
 
|
 
|
!X
 
 
|
 
|
 +
|
 +
|
 +
|}
 +
 +
 +
Table 3 shows how the topics (each row) align with the second set of implementation examples (each column):
 +
 +
{| align="center"
 +
|+'''Table 3. Implementation Examples Developed for SEBoK.''' (SEBoK Original)
 +
!SEBoK Topic (Part 3)
 +
!Bag Handling
 +
!VA Sub
 +
!Route Mod
 +
!Water Mgmt
 +
!FAA AAS
 +
!Light Rail
 
|-
 
|-
![[Information Management]]
+
|[[Business or Mission Analysis]]
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 
|
 
|
 +
!X
 +
|-
 +
|[[Stakeholder Needs and Requirements]]
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 
|
 
|
 +
!X
 +
|-
 +
|[[System Requirements]]
 
|
 
|
 
|
 
|
 
!X
 
!X
 
|
 
|
 +
!X
 +
!X
 +
|-
 +
|[[System Architecture]]
 +
!X
 +
!X
 +
|
 +
!X
 +
!X
 +
!X
 +
|-
 +
|[[System Analysis]]
 +
!X
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 +
!X
 
|-
 
|-
![[Quality Management]]
+
|[[System Implementation]]
 
|
 
|
 
|
 
|
Line 359: Line 701:
 
|
 
|
 
|
 
|
 +
!X
 +
|-
 +
|[[System Integration]]
 +
!X
 
|
 
|
 +
|
 +
!X
 +
|
 +
!X
 +
|-
 +
|[[System Verification]]
 +
!X
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 +
|-
 +
|[[System Validation]]
 
!X
 
!X
 
|
 
|
 
|
 
|
 +
|
 +
!X
 +
!X
 
|-
 
|-
![[Product and Service Life Management]]
+
|[[System Deployment]]
 +
|
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
 
|
 
|
 
!X
 
!X
 +
|-
 +
|[[Operation of the System]]
 
|
 
|
 
|
 
|
Line 381: Line 743:
 
!X
 
!X
 
|-
 
|-
![[Systems Engineering Standards]]
+
|[[System Maintenance]]
 
|
 
|
 
|
 
|
Line 387: Line 749:
 
|
 
|
 
|
 
|
 +
!X
 +
|-
 +
|[[Logistics]]
 +
!X
 
|
 
|
 
|
 
|
Line 392: Line 758:
 
|
 
|
 
|
 
|
 +
|-
 +
|[[Planning]]
 +
!X
 
|
 
|
 +
!X
 +
!X
 +
!X
 
!X
 
!X
 
|-
 
|-
![[Enabling Systems Engineering|SE Workforce]]
+
|[[Assessment and Control]]
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 +
|-
 +
|[[Risk Management]]
 
!X
 
!X
 +
|
 +
!X
 +
!X
 +
!X
 +
!X
 +
|-
 +
|[[Measurement]]
 +
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 +
|-
 +
|[[Decision Management]]
 +
!X
 
|
 
|
 +
!X
 +
!X
 
|
 
|
 
|
 
|
 
|-
 
|-
![[Systems Engineering and Software Engineering|Software Engineering]]
+
|[[Configuration Management]]
 +
 
 +
!X
 
|
 
|
 +
!X
 
|
 
|
 +
!X
 
|
 
|
 +
|-
 +
|[[Information Management]]
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
 
|
 
|
 +
|-
 +
|[[Quality Management]]
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
 
|}
 
|}
 
  
 
==References==  
 
==References==  
 
+
===Works Cited===
===Citations===
+
None.
No citations have been identified for version 0.5.  Please provide any recommendations on citations in your review.
 
 
 
 
===Primary References===
 
===Primary References===
No primary references have been identified for version 0.5.  Please provide any recommendations on primary references in your review.
+
None.
 
 
 
===Additional References===
 
===Additional References===
No additional references have been identified for version 0.5.  Please provide any recommendations on additional references in your review.
+
None.
  
 
----
 
----
<center>[[Systems Engineering Implementation Examples|<- Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[Case Studies|Next Article ->]]</center>
+
<center>[[Systems Engineering Implementation Examples|< Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[Implementation Examples|Next Article >]]</center>
[[Category: Part 7]][[Category:Knowledge Area]]
+
 
 +
<center>'''SEBoK v. 2.9, released 20 November 2023'''</center>
 +
 
 +
[[Category: Part 7]]

Latest revision as of 22:37, 18 November 2023


Lead Authors: Heidi Davidz, Alice Squires, Tom Hilburn, Contributing Authors: Alex Lee, John Brackett, Richard Turner


The following matrix maps the Systems Engineering Implementation Examples to topics in the Systems Engineering Body of Knowledge (SEBoK). It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset is included here for clarity. For additional information, see the example of interest and the corresponding SEBoK topic.

Organization and Mapping of Examples to the SEBoK

The following short titles shown in Table 1 are used for the implementation examples:

Table 1. Short Titles for the SEBoK Examples. (SEBoK Original)
Case Studies
BT Business Transformation
ATC NextGen Air Traffic Control
NASA NASA's Mission to Saturn
HST Hubble Space Telescope
GPS Global Positioning System
GPS II Global Positioning System II
Radiation Medical Radiation
FBI VCF FBI Virtual Case File System
MSTI Miniature Seeker Technology Integration
Infusion Pump Next Generation Medical Infusion Pump
DfM Design for Maintainability
CAS Complex Adaptive Operating System
PM Project Management
TS Taxi Service
SWFTS SWFTS MBSE
Bag Handling Denver Airport Baggage Handling System
VA Sub Virginia Class Submarine
Route Mod UK West Coast Route Modernisation Project
Water Mgmt Singapore Water Management
FAA AAS FAA Advanced Automation System
Light Rail Standard Korean Light Transit System
TMT Thirty-Meter Telescope

Table 2 shows how the topics (each row) align with the first set of implementation examples (each column):

Table 2. Implementation Examples based on published case studies. (SEBoK Original)
SEBoK Topic BT ATC NASA HST GPS GPS II Radiation FBI VCF MSTI Infusion Pump DfM CAS PM TS SWFTS NHS
Systems Thinking X X X X X X X X X
Models and Simulation X X X X X X
Product Systems Engineering X X X X X
Service Systems Engineering X X X X
Enterprise Systems Engineering X X X X X X X
Systems of Systems (SoS) X X X X X
Life Cycle Models X X X X X X X X
Business or Mission Analysis X X X X X X X
Stakeholder Needs and Requirements X X X X X X X X X
System Requirements X X X X X X X
System Architecture X X X X X X
System Analysis X X X X X
System Implementation X X X
System Integration X X X X X X X X X
System Verification X X X X X
System Validation X X X X X X
System Deployment X X X
Operation of the System X X X X X X
System Maintenance X
Logistics
Planning X X X X X X
Assessment and Control X X X X X
Risk Management X X X X X X X X X
Measurement X
Decision Management X X X X X
Configuration Management X X X X X
Information Management X X X X
Quality Management X
Enabling Systems Engineering X X X X X X X X X
Related Disciplines X X X X X


Table 3 shows how the topics (each row) align with the second set of implementation examples (each column):

Table 3. Implementation Examples Developed for SEBoK. (SEBoK Original)
SEBoK Topic (Part 3) Bag Handling VA Sub Route Mod Water Mgmt FAA AAS Light Rail
Business or Mission Analysis X X X
Stakeholder Needs and Requirements X X X
System Requirements X X X
System Architecture X X X X X
System Analysis X X X X
System Implementation X
System Integration X X X
System Verification X X X
System Validation X X X
System Deployment X
Operation of the System X X
System Maintenance X
Logistics X
Planning X X X X X
Assessment and Control X X
Risk Management X X X X X
Measurement X
Decision Management X X X
Configuration Management X X X
Information Management X
Quality Management X

References

Works Cited

None.

Primary References

None.

Additional References

None.


< Previous Article | Parent Article | Next Article >
SEBoK v. 2.9, released 20 November 2023