Difference between revisions of "Matrix of Implementation Examples"

From SEBoK
Jump to navigation Jump to search
m (Text replacement - "SEBoK v. 2.9, released 13 November 2023" to "SEBoK v. 2.9, released 20 November 2023")
 
(112 intermediate revisions by 11 users not shown)
Line 1: Line 1:
The following matrix maps the SEBoK [[Systems Engineering Implementation Examples]] to knowledge areas in the [[SEBoK Table of Contents|Systems Engineering Body of Knowledge (SEBoK)]]. It provides both a list of potential systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example.  Since the number of topics in the SEBoK is extensive, only a subset are included here for clarity.  For additional information, see the implementation example of interest and the corresponding SEBoK topic.
+
----
 
+
'''''Lead Authors:''''' ''Heidi Davidz, Alice Squires, Tom Hilburn'', '''''Contributing Authors:''''' ''Alex Lee, John Brackett, Richard Turner''
 +
----
 +
The following matrix maps the [[Systems Engineering Implementation Examples]] to topics in the [[SEBoK Table of Contents|Systems Engineering Body of Knowledge (SEBoK)]]. It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example.  Since the number of topics in the SEBoK is extensive, only a subset is included here for clarity.  For additional information, see the example of interest and the corresponding SEBoK topic.
  
The following abbreviations shown in Table 1 (Developed for BKCASE) are used for the implementation examples:  
+
==Organization and Mapping of Examples to the SEBoK==
<center>'''Table 1. Abbreviations for the SEBoK Case Studies and VIgnettes.'''  Table developed for BKCASE.</center>
+
The following short titles shown in Table 1 are used for the implementation examples:  
 +
   
 
{| align="center"
 
{| align="center"
 +
|+'''Table 1.  Short Titles for the SEBoK Examples.'''  (SEBoK Original)
 +
|-
 +
! scope="col" colspan="2" | Case Studies
 +
|-
 +
|'''BT'''
 +
|Business Transformation
 +
|-
 +
|'''ATC'''
 +
|NextGen Air Traffic Control
 +
|-
 +
|'''NASA'''
 +
| NASA's Mission to Saturn
 +
|-
 +
|'''HST'''
 +
|Hubble Space Telescope
 +
|-
 +
|'''GPS'''
 +
|Global Positioning System
 +
|-
 +
|'''GPS II'''
 +
|Global Positioning System II
 
|-
 
|-
|HST
+
|'''Radiation'''
|Hubble Space Telescope Case Study
+
|Medical Radiation
|
+
|-
|Bag Handling
+
|'''FBI VCF'''
|Denver Airport Baggage Handling System Vignette
+
|FBI Virtual Case File System
 +
|-
 +
|'''MSTI'''
 +
|Miniature Seeker Technology Integration
 +
|-
 +
|'''Infusion Pump'''
 +
|Next Generation Medical Infusion Pump
 +
|-
 +
|'''DfM'''
 +
|Design for Maintainability
 +
|-
 +
|'''CAS'''
 +
|Complex Adaptive Operating System
 +
|-
 +
|'''PM'''
 +
|Project Management
 +
|-
 +
|'''TS'''
 +
|Taxi Service
 +
|-
 +
|'''SWFTS'''
 +
|SWFTS MBSE
 +
|-
 +
|'''Bag Handling'''
 +
|Denver Airport Baggage Handling System
 +
|-
 +
|'''VA Sub'''
 +
|Virginia Class Submarine
 
|-
 
|-
|GPS
+
|'''Route Mod'''
|Global Positioning System Case Study
+
|UK West Coast Route Modernisation Project
|
 
|VA Sub
 
|Virginia Class Submarine Vignette
 
 
|-
 
|-
|Radiation
+
|'''Water Mgmt'''
|Medical Radiation Case Study
+
|Singapore Water Management
|
 
|Route Mod
 
|UK West Coast Route Modernisation Project Vignette
 
 
|-
 
|-
|FBI VCF
+
|'''FAA AAS'''
|FBI Virtual Case File Case Study
+
|FAA Advanced Automation System
|
 
|Water Mgmt
 
|Singapore Water Management Vignette
 
 
|-
 
|-
|MSTI
+
|'''Light Rail'''
|MSTI Case Study
+
|Standard Korean Light Transit System
|
 
|FAA AAS
 
|FAA AAS Vignette
 
 
|-
 
|-
|Infusion Pump
+
|'''TMT'''
|Next Generation Medical Infusion Pump Case Study
+
|Thirty-Meter Telescope
|
 
|Light Rail
 
|Standard Korean Light Transit System Vignette
 
 
|}
 
|}
  
 
+
Table 2 shows how the topics (each row) align with the first set of implementation examples (each column):
  
 
{| align="center"
 
{| align="center"
|+'''Table 2. Implementation Examples.''' Coverage of SEBoK Topics for Each Case Study and Vignette (Table Developed for BKCASE).
+
|+'''Table 2. Implementation Examples based on published case studies.''' (SEBoK Original)
 
!SEBoK Topic
 
!SEBoK Topic
![[Hubble Space Telescope Case Study|HST]]
+
!BT
![[Global Positioning System Case Study|GPS]]
+
!ATC
![[Medical Radiation Case Study|Radiation]]
+
!NASA
![[FBI Virtual Case File System Case Study|FBI VCF]]
+
!HST
![[MSTI Case Study|MSTI]]
+
!GPS
![[Next Generation Medical Infusion Pump Case Study|Infusion Pump]]
+
!GPS II
![[Denver Airport Baggage Handling System Vignette|Bag Handling]]
+
!Radiation
![[Virginia Class Submarine Vignette|VA Sub]]
+
!FBI VCF
![[UK West Coast Route Modernisation Project Vignette|Route Mod]]
+
!MSTI
![[Singapore Water Management Vignette|Water Mgmt]]
+
!Infusion Pump
![[FAA Advanced Automation System (AAS) Vignette|FAA AAS]]
+
!DfM
![[Standard Korean Light Transit System Vignette|Light Rail]]
+
!CAS
 +
!PM
 +
!TS
 +
!SWFTS
 +
!NHS
 
|-
 
|-
![[Mission Analysis]]
+
|[[Systems Thinking]]
 
|
 
|
 
|
 
|
 
|
 
|
 +
|
 +
!X
 
!X
 
!X
 
|
 
|
 +
!X
 +
!X
 +
!X
 +
!X
 +
!X
 +
!X
 
!X
 
!X
 
|
 
|
 
|
 
|
 +
|-
 +
|[[Representing Systems with Models|Models and Simulation]]
 +
|
 +
!X
 
!X
 
!X
 +
|
 +
|
 
!X
 
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 
|
 
|
 
!X
 
!X
 +
!X
 +
!X
 +
|
 
|-
 
|-
![[Stakeholder Needs and Requirements]]
+
|[[Product Systems Engineering]]
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 
!X
 
!X
 
|
 
|
 
!X
 
!X
 +
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 
|
 
|
 
|
 
|
 
!X
 
!X
 +
|-
 +
|[[Service Systems Engineering]]
 +
|
 +
|
 +
!X
 +
|
 +
|
 +
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 
!X
 
!X
 
|
 
|
 
!X
 
!X
 
|-
 
|-
![[System Requirements]]
+
|[[Enterprise Systems Engineering]]
 +
!X
 
!X
 
!X
 
!X
 
!X
 
|
 
|
 +
|
 +
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
!X
 
!X
 
!X
 
|
 
|
 +
!X
 +
|-
 +
|[[Systems of Systems (SoS)]]
 +
!X
 
!X
 
!X
 +
|
 
|
 
|
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 
|
 
|
 
!X
 
!X
 +
|
 
!X
 
!X
 
|-
 
|-
![[Architectural Design: Logical]]
+
|[[Life Cycle Models]]
 +
!X
 +
|
 
|
 
|
 
!X
 
!X
 +
!X
 +
|
 
|
 
|
 
|
 
|
Line 112: Line 222:
 
!X
 
!X
 
!X
 
!X
 +
|
 
|
 
|
 
!X
 
!X
 +
|
 +
|-
 +
|[[Business or Mission Analysis]]
 
!X
 
!X
 
!X
 
!X
|-
 
![[Architectural Design: Physical]]
 
 
|
 
|
 +
|
 +
|
 +
!X
 +
|
 +
!X
 +
|
 +
!X
 +
|
 +
|
 +
!X
 
!X
 
!X
 
|
 
|
 +
|
 +
|-
 +
|[[Stakeholder Needs and Requirements]]
 +
!X
 +
!X
 
|
 
|
 
!X
 
!X
 +
|
 
!X
 
!X
 +
|
 
!X
 
!X
 +
|
 
!X
 
!X
 +
|
 
|
 
|
 
!X
 
!X
 
!X
 
!X
 
!X
 
!X
 +
|
 
|-
 
|-
![[System Analysis]]
+
|[[System Requirements]]
 +
|
 +
|
 
|
 
|
 
!X
 
!X
 +
!X
 +
|
 
|
 
|
 +
!X
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 +
!X
 +
|
 +
|-
 +
|[[System Architecture]]
 +
!X
 
!X
 
!X
 
|
 
|
Line 143: Line 288:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
!X
 
!X
 +
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 
|-
 
|-
![[System Implementation]]
+
|[[System Analysis]]
 +
|
 
|
 
|
 
!X
 
!X
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
Line 155: Line 311:
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 +
!X
 
|
 
|
 
|
 
|
!X
 
 
|-
 
|-
![[System Integration]]
+
|[[System Implementation]]
 +
|
 +
|
 +
|
 +
|
 
!X
 
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 
!X
 
!X
 
|
 
|
Line 166: Line 333:
 
!X
 
!X
 
|
 
|
 +
|
 +
|-
 +
|[[System Integration]]
 
!X
 
!X
 
|
 
|
 +
!X
 +
!X
 +
!X
 +
!X
 +
|
 +
|
 +
!X
 
|
 
|
 
!X
 
!X
 
|
 
|
 
!X
 
!X
 +
!X
 +
|
 +
|
 
|-
 
|-
![[System Verification]]
+
|[[System Verification]]
 +
|
 +
|
 +
!X
 
|
 
|
 
!X
 
!X
 +
|
 
!X
 
!X
 
|
 
|
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|[[System Validation]]
 
!X
 
!X
 
|
 
|
Line 186: Line 378:
 
!X
 
!X
 
!X
 
!X
 +
!X
 +
|
 +
!X
 +
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 
|-
 
|-
![[System Validation]]
+
|[[System Deployment]]
 +
|
 +
|
 +
|
 
|
 
|
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 +
|
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|[[Operation of the System]]
 +
|
 +
|
 +
|
 +
|
 
!X
 
!X
 
!X
 
!X
Line 199: Line 418:
 
|
 
|
 
!X
 
!X
 +
!X
 +
|
 +
|
 +
!X
 +
|
 
!X
 
!X
 
|-
 
|-
![[System Deployment]]
+
|[[System Maintenance]]
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 
|
 
|
 
!X
 
!X
 +
|-
 +
|[[Logistics]]
 
|
 
|
 
|
 
|
Line 213: Line 453:
 
|
 
|
 
|
 
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|[[Planning]]
 
!X
 
!X
 +
!X
 +
|
 +
!X
 +
|
 +
|
 +
|
 +
!X
 +
|
 +
!X
 +
|
 +
|
 +
!X
 +
|
 +
|
 +
|
 
|-
 
|-
![[Operation of the System]]
+
|[[Assessment and Control]]
 +
|
 +
|
 +
|
 +
|
 +
|
 
|
 
|
 +
!X
 +
!X
 
!X
 
!X
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 
!X
 
!X
 
|
 
|
 +
|
 +
|-
 +
|[[Risk Management]]
 
|
 
|
 +
|
 +
!X
 +
!X
 +
!X
 +
!X
 +
!X
 +
!X
 
|
 
|
 
!X
 
!X
 
|
 
|
 
!X
 
!X
 +
!X
 +
|
 +
|
 +
|
 
|-
 
|-
![[System Maintenance]]
+
|[[Measurement]]
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
!X
 +
|
 +
|
 +
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 +
|-
 +
|[[Decision Management]]
 +
!X
 
|
 
|
 
|
 
|
Line 242: Line 543:
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 +
!X
 +
!X
 +
!X
 +
|
 +
|
 
|-
 
|-
![[Logistics]]
+
|[[Configuration Management]]
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 
|
 
|
 
|
 
|
 
!X
 
!X
 
|
 
|
 +
!X
 +
!X
 
|
 
|
 
|
 
|
Line 257: Line 569:
 
|
 
|
 
|-
 
|-
![[Planning]]
+
|[[Information Management]]
 +
|
 +
|
 
!X
 
!X
 
|
 
|
 
|
 
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
!X
 
!X
 
!X
 +
!X
 +
|
 +
|
 +
|-
 +
|[[Quality Management]]
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 
|
 
|
 
!X
 
!X
 +
|
 +
|-
 +
|[[Enabling Systems Engineering]]
 +
|
 +
|
 
!X
 
!X
 
|
 
|
 +
!X
 +
!X
 +
|
 +
|
 +
!X
 
!X
 
!X
 
!X
 
!X
 
!X
 
!X
 
!X
 
!X
 +
|
 +
!X
 +
|
 
|-
 
|-
![[Assessment and Control]]
+
|[[Related Disciplines]]
 +
|
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 278: Line 633:
 
!X
 
!X
 
|
 
|
 +
!X
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
 
|
 
|
 +
|
 +
|}
 +
 +
 +
Table 3 shows how the topics (each row) align with the second set of implementation examples (each column):
 +
 +
{| align="center"
 +
|+'''Table 3. Implementation Examples Developed for SEBoK.''' (SEBoK Original)
 +
!SEBoK Topic (Part 3)
 +
!Bag Handling
 +
!VA Sub
 +
!Route Mod
 +
!Water Mgmt
 +
!FAA AAS
 +
!Light Rail
 +
|-
 +
|[[Business or Mission Analysis]]
 +
|
 +
|
 +
!X
 
!X
 
!X
 +
|
 
!X
 
!X
 
|-
 
|-
![[Risk Management]]
+
|[[Stakeholder Needs and Requirements]]
 +
|
 +
|
 
!X
 
!X
 
!X
 
!X
 +
|
 
!X
 
!X
 +
|-
 +
|[[System Requirements]]
 +
|
 +
|
 
!X
 
!X
 
|
 
|
 +
!X
 +
!X
 +
|-
 +
|[[System Architecture]]
 
!X
 
!X
 
!X
 
!X
 
|
 
|
 
!X
 
!X
 +
!X
 +
!X
 +
|-
 +
|[[System Analysis]]
 +
!X
 +
|
 +
|
 
!X
 
!X
 
!X
 
!X
 
!X
 
!X
 
|-
 
|-
![[Measurement]]
+
|[[System Implementation]]
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 +
|
 +
!X
 +
|-
 +
|[[System Integration]]
 +
!X
 +
|
 +
|
 +
!X
 +
|
 +
!X
 +
|-
 +
|[[System Verification]]
 
!X
 
!X
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 +
!X
 +
|-
 +
|[[System Validation]]
 +
!X
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 
!X
 
!X
 
|-
 
|-
![[Decision Management]]
+
|[[System Deployment]]
 +
|
 
|
 
|
 
|
 
|
Line 319: Line 734:
 
|
 
|
 
!X
 
!X
 +
|-
 +
|[[Operation of the System]]
 +
|
 +
|
 
|
 
|
 
!X
 
!X
 
|
 
|
 
!X
 
!X
!X
+
|-
 +
|[[System Maintenance]]
 +
|
 +
|
 +
|
 
|
 
|
 
|
 
|
 +
!X
 
|-
 
|-
![[Configuration Management]]
+
|[[Logistics]]
 +
!X
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 +
|
 +
|-
 +
|[[Planning]]
 
!X
 
!X
 
|
 
|
 
!X
 
!X
 +
!X
 +
!X
 +
!X
 +
|-
 +
|[[Assessment and Control]]
 +
|
 +
|
 +
|
 
|
 
|
 +
!X
 +
!X
 +
|-
 +
|[[Risk Management]]
 
!X
 
!X
 
|
 
|
 
!X
 
!X
|
+
!X
 +
!X
 +
!X
 
|-
 
|-
![[Information Management]]
+
|[[Measurement]]
 
|
 
|
 
|
 
|
Line 347: Line 789:
 
|
 
|
 
|
 
|
 +
!X
 +
|-
 +
|[[Decision Management]]
 +
!X
 
|
 
|
 +
!X
 +
!X
 
|
 
|
 
|
 
|
 +
|-
 +
|[[Configuration Management]]
 +
 
!X
 
!X
 
|
 
|
 +
!X
 
|
 
|
 +
!X
 
|
 
|
 
|-
 
|-
![[Quality Management]]
+
|[[Information Management]]
|
 
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
 
|
 
|
 +
|-
 +
|[[Quality Management]]
 
|
 
|
 
|
 
|
Line 368: Line 823:
 
|
 
|
 
|
 
|
|-}
+
|}
 
 
  
 
==References==  
 
==References==  
 
 
===Works Cited===
 
===Works Cited===
No citations have been identified for version 1.0.
+
None.
 
 
 
===Primary References===
 
===Primary References===
No primary references have been identified for version 1.0.
+
None.
 
 
 
===Additional References===
 
===Additional References===
No additional references have been identified for version 1.0.  
+
None.
  
 
----
 
----
<center>[[Systems Engineering Implementation Examples|< Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[Case Studies|Next Article >]]</center>
+
<center>[[Systems Engineering Implementation Examples|< Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[Implementation Examples|Next Article >]]</center>
 
 
==Comments from SEBok 0.5 Wiki==
 
No comments were logged for this article in the SEBoK 0.5 wiki.  Because of this, it is especially important for reviewers to provide feedback on this article.  Please see the discussion prompts below.
 
  
 +
<center>'''SEBoK v. 2.9, released 20 November 2023'''</center>
  
 
[[Category: Part 7]]
 
[[Category: Part 7]]
{{DISQUS}}
 

Latest revision as of 22:37, 18 November 2023


Lead Authors: Heidi Davidz, Alice Squires, Tom Hilburn, Contributing Authors: Alex Lee, John Brackett, Richard Turner


The following matrix maps the Systems Engineering Implementation Examples to topics in the Systems Engineering Body of Knowledge (SEBoK). It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset is included here for clarity. For additional information, see the example of interest and the corresponding SEBoK topic.

Organization and Mapping of Examples to the SEBoK

The following short titles shown in Table 1 are used for the implementation examples:

Table 1. Short Titles for the SEBoK Examples. (SEBoK Original)
Case Studies
BT Business Transformation
ATC NextGen Air Traffic Control
NASA NASA's Mission to Saturn
HST Hubble Space Telescope
GPS Global Positioning System
GPS II Global Positioning System II
Radiation Medical Radiation
FBI VCF FBI Virtual Case File System
MSTI Miniature Seeker Technology Integration
Infusion Pump Next Generation Medical Infusion Pump
DfM Design for Maintainability
CAS Complex Adaptive Operating System
PM Project Management
TS Taxi Service
SWFTS SWFTS MBSE
Bag Handling Denver Airport Baggage Handling System
VA Sub Virginia Class Submarine
Route Mod UK West Coast Route Modernisation Project
Water Mgmt Singapore Water Management
FAA AAS FAA Advanced Automation System
Light Rail Standard Korean Light Transit System
TMT Thirty-Meter Telescope

Table 2 shows how the topics (each row) align with the first set of implementation examples (each column):

Table 2. Implementation Examples based on published case studies. (SEBoK Original)
SEBoK Topic BT ATC NASA HST GPS GPS II Radiation FBI VCF MSTI Infusion Pump DfM CAS PM TS SWFTS NHS
Systems Thinking X X X X X X X X X
Models and Simulation X X X X X X
Product Systems Engineering X X X X X
Service Systems Engineering X X X X
Enterprise Systems Engineering X X X X X X X
Systems of Systems (SoS) X X X X X
Life Cycle Models X X X X X X X X
Business or Mission Analysis X X X X X X X
Stakeholder Needs and Requirements X X X X X X X X X
System Requirements X X X X X X X
System Architecture X X X X X X
System Analysis X X X X X
System Implementation X X X
System Integration X X X X X X X X X
System Verification X X X X X
System Validation X X X X X X
System Deployment X X X
Operation of the System X X X X X X
System Maintenance X
Logistics
Planning X X X X X X
Assessment and Control X X X X X
Risk Management X X X X X X X X X
Measurement X
Decision Management X X X X X
Configuration Management X X X X X
Information Management X X X X
Quality Management X
Enabling Systems Engineering X X X X X X X X X
Related Disciplines X X X X X


Table 3 shows how the topics (each row) align with the second set of implementation examples (each column):

Table 3. Implementation Examples Developed for SEBoK. (SEBoK Original)
SEBoK Topic (Part 3) Bag Handling VA Sub Route Mod Water Mgmt FAA AAS Light Rail
Business or Mission Analysis X X X
Stakeholder Needs and Requirements X X X
System Requirements X X X
System Architecture X X X X X
System Analysis X X X X
System Implementation X
System Integration X X X
System Verification X X X
System Validation X X X
System Deployment X
Operation of the System X X
System Maintenance X
Logistics X
Planning X X X X X
Assessment and Control X X
Risk Management X X X X X
Measurement X
Decision Management X X X
Configuration Management X X X
Information Management X
Quality Management X

References

Works Cited

None.

Primary References

None.

Additional References

None.


< Previous Article | Parent Article | Next Article >
SEBoK v. 2.9, released 20 November 2023