The following matrix maps the SEBoK [[Systems Engineering Implementation Examples]] to topics in the [[SEBoK Table of Contents|Systems Engineering Body of Knowledge (SEBoK)]], primarily [[Systems Engineering and Management|Part 3]]. It provides both a list of potential systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example.  Since the number of topics in the SEBoK is extensive, only a subset are included here for clarity.  For additional information, see the implementation example of interest and the corresponding SEBoK topic.
+
----
 
+
'''''Lead Authors:''''' ''Heidi Davidz, Alice Squires, Tom Hilburn'', '''''Contributing Authors:''''' ''Alex Lee, John Brackett, Richard Turner''
==Organization and Mapping of Case Studies to the SEBoK==
+
----
 +
The following matrix maps the [[Systems Engineering Implementation Examples]] to topics in the [[SEBoK Table of Contents|Systems Engineering Body of Knowledge (SEBoK)]]. It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example.  Since the number of topics in the SEBoK is extensive, only a subset is included here for clarity.  For additional information, see the example of interest and the corresponding SEBoK topic.
  
The following short titles shown in Table 1 (Developed for BKCASE) are used for the implementation examples:  
+
==Organization and Mapping of Examples to the SEBoK==
<center>
+
The following short titles shown in Table 1 are used for the implementation examples:  
 +
 
{| align="center"
 
{| align="center"
|+'''Table 1.  Short Titles for the SEBoK Case Studies and Vignettes.'''  (SEBoK Original)
+
|+'''Table 1.  Short Titles for the SEBoK Examples.'''  (SEBoK Original)
 +
|-
 +
! scope="col" colspan="2" | Case Studies
 +
|-
 +
|'''BT'''
 +
|Business Transformation
 +
|-
 +
|'''ATC'''
 +
|NextGen Air Traffic Control
 +
|-
 +
|'''NASA'''
 +
| NASA's Mission to Saturn
 +
|-
 +
|'''HST'''
 +
|Hubble Space Telescope
 +
|-
 +
|'''GPS'''
 +
|Global Positioning System
 +
|-
 +
|'''GPS II'''
 +
|Global Positioning System II
 +
|-
 +
|'''Radiation'''
 +
|Medical Radiation
 +
|-
 +
|'''FBI VCF'''
 +
|FBI Virtual Case File System
 +
|-
 +
|'''MSTI'''
 +
|Miniature Seeker Technology Integration
 +
|-
 +
|'''Infusion Pump'''
 +
|Next Generation Medical Infusion Pump
 +
|-
 +
|'''DfM'''
 +
|Design for Maintainability
 +
|-
 +
|'''CAS'''
 +
|Complex Adaptive Operating System
 +
|-
 +
|'''PM'''
 +
|Project Management
 +
|-
 +
|'''TS'''
 +
|Taxi Service
 
|-
 
|-
! scope="col" | Case Studies
+
|'''SWFTS'''
 +
|SWFTS MBSE
 
|-
 
|-
 
|'''Bag Handling'''
 
|'''Bag Handling'''
Line 27: Line 74:
 
|'''Light Rail'''
 
|'''Light Rail'''
 
|Standard Korean Light Transit System
 
|Standard Korean Light Transit System
 +
|-
 +
|'''TMT'''
 +
|Thirty-Meter Telescope
 
|}
 
|}
</center>
 
  
Table 2 shows how the topics (each row) align with the implementation examples (each column).
+
Table 2 shows how the topics (each row) align with the first set of implementation examples (each column):
  
 
{| align="center"
 
{| align="center"
|+'''Table 2. Implementation Examples.''' Coverage of SEBoK Topics for Each Case Study and Vignette. (SEBoK Original)
+
|+'''Table 2. Implementation Examples based on published case studies.''' (SEBoK Original)
!SEBoK Topic (Part 3)
+
!SEBoK Topic
 +
!BT
 +
!ATC
 +
!NASA
 
!HST
 
!HST
 
!GPS
 
!GPS
 +
!GPS II
 
!Radiation
 
!Radiation
 
!FBI VCF
 
!FBI VCF
 
!MSTI
 
!MSTI
 
!Infusion Pump
 
!Infusion Pump
!Bag Handling
+
!DfM
!VA Sub
+
!CAS
!Route Mod
+
!PM
!Water Mgmt
+
!TS
!FAA AAS
+
!SWFTS
!Light Rail
+
!NHS
 
|-
 
|-
|[[Business or Mission Analysis]]
+
|[[Systems Thinking]]
 +
|
 
|
 
|
 
|
 
|
 
|
 
|
 
!X
 
!X
|
 
 
!X
 
!X
|
 
 
|
 
|
 
!X
 
!X
 
!X
 
!X
|
 
 
!X
 
!X
|-
 
|[[Stakeholder Needs and Requirements]]
 
|
 
|
 
|
 
 
!X
 
!X
|
 
 
!X
 
!X
|
 
|
 
 
!X
 
!X
 
!X
 
!X
 
|
 
|
!X
+
|
 
|-
 
|-
|[[System Requirements]]
+
|[[Representing Systems with Models|Models and Simulation]]
 +
|
 
!X
 
!X
 
!X
 
!X
 
|
 
|
!X
 
 
|
 
|
 
!X
 
!X
 
|
 
|
 
|
 
|
!X
 
 
|
 
|
!X
 
!X
 
|-
 
|[[Logical Architecture Development]]
 
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
!X
 
 
!X
 
!X
 
!X
 
!X
 
!X
 
!X
 
|
 
|
!X
 
!X
 
!X
 
 
|-
 
|-
|[[Physical Architecture Development]]
+
|[[Product Systems Engineering]]
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
!X
 
!X
 
 
!X
 
!X
 
!X
 
!X
Line 116: Line 146:
 
!X
 
!X
 
!X
 
!X
!X
 
|-
 
|[[System Analysis]]
 
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
!X
 
!X
 
 
!X
 
!X
 
|-
 
|-
|[[System Implementation]]
+
|[[Service Systems Engineering]]
 +
|
 
|
 
|
 
!X
 
!X
 
|
 
|
 +
|
 +
!X
 
|
 
|
 
|
 
|
Line 143: Line 169:
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 
!X
 
!X
 
|-
 
|-
|[[System Integration]]
+
|[[Enterprise Systems Engineering]]
 +
!X
 
!X
 
!X
 
!X
 
!X
Line 153: Line 181:
 
!X
 
!X
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
!X
 
 
|
 
|
!X
 
|-
 
|[[System Verification]]
 
 
|
 
|
!X
 
!X
 
 
|
 
|
 
!X
 
!X
 
!X
 
!X
!X
 
|
 
|
 
 
|
 
|
!X
 
 
!X
 
!X
 
|-
 
|-
|[[System Validation]]
+
|[[Systems of Systems (SoS)]]
|
 
!X
 
!X
 
|
 
!X
 
 
!X
 
!X
 
!X
 
!X
Line 186: Line 198:
 
|
 
|
 
!X
 
!X
!X
 
|-
 
|[[System Deployment]]
 
|
 
!X
 
|
 
 
|
 
|
 
|
 
|
Line 199: Line 205:
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 
!X
 
!X
 
|-
 
|-
|[[Operation of the System]]
+
|[[Life Cycle Models]]
|
 
 
!X
 
!X
 
|
 
|
 
|
 
|
|
+
!X
 
!X
 
!X
 
|
 
|
Line 213: Line 219:
 
|
 
|
 
!X
 
!X
|
 
 
!X
 
!X
|-
+
!X
|[[System Maintenance]]
+
!X
|
 
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 +
|-
 +
|[[Business or Mission Analysis]]
 +
!X
 +
!X
 
|
 
|
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 +
!X
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
 
!X
 
!X
|-
 
|[[Logistics]]
 
|
 
|
 
|
 
|
 
|
 
|
 
 
!X
 
!X
|
 
|
 
|
 
 
|
 
|
 
|
 
|
 
|-
 
|-
|[[Planning]]
+
|[[Stakeholder Needs and Requirements]]
 +
!X
 
!X
 
!X
 
|
 
|
 +
!X
 
|
 
|
 
!X
 
!X
 
|
 
|
 
!X
 
!X
 +
|
 
!X
 
!X
 +
|
 
|
 
|
 
!X
 
!X
 
!X
 
!X
 
!X
 
!X
!X
+
|
 
|-
 
|-
|[[Assessment and Control]]
+
|[[System Requirements]]
 +
|
 
|
 
|
 
|
 
|
!X
 
 
!X
 
!X
 
!X
 
!X
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
 
!X
 
!X
 
!X
 
!X
 +
!X
 +
|
 
|-
 
|-
|[[Risk Management]]
+
|[[System Architecture]]
!X
 
!X
 
 
!X
 
!X
 
!X
 
!X
 
|
 
|
!X
 
!X
 
 
|
 
|
 
!X
 
!X
 
!X
 
!X
!X
 
!X
 
|-
 
|[[Measurement]]
 
|
 
|
 
 
|
 
|
 
|
 
|
 +
!X
 
!X
 
!X
 
|
 
|
Line 298: Line 298:
 
|
 
|
 
|
 
|
!X
 
 
|-
 
|-
|[[Decision Management]]
+
|[[System Analysis]]
|
 
|
 
|
 
 
|
 
|
!X
 
 
|
 
|
 
!X
 
!X
 
|
 
|
!X
 
 
!X
 
!X
 
|
 
|
 
|
 
|
|-
 
|[[Configuration Management]]
 
 
|
 
|
 
|
 
|
Line 320: Line 312:
 
|
 
|
 
!X
 
!X
|
 
 
!X
 
!X
|
 
 
!X
 
!X
 
|
 
|
!X
 
 
|
 
|
 
|-
 
|-
|[[Information Management]]
+
|[[System Implementation]]
|
 
|
 
|
 
|
 
 
|
 
|
 
|
 
|
Line 338: Line 323:
 
|
 
|
 
!X
 
!X
|
 
|
 
|
 
|-
 
|[[Quality Management]]
 
|
 
|
 
 
|
 
|
 
|
 
|
Line 350: Line 328:
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
Line 355: Line 334:
 
|
 
|
 
|
 
|
|}
 
{|
 
!Case Studies
 
!Vignettes
 
 
|-
 
|-
|'''HS'''
+
|[[System Integration]]
|'''Bag Handling'''
 
|Denver Airport Baggage Handling System
 
|-
 
|
 
|'''VA Sub'''
 
|Virginia Class Submarine
 
|-
 
|
 
|'''Route Mod'''
 
|UK West Coast Route Modernisation Project
 
|-
 
|
 
|'''Water Mgmt'''
 
|Singapore Water Management
 
|-
 
|n
 
|'''FAA AAS'''
 
|FAA Advanced Automation System
 
|-
 
|
 
|'''Light Rail'''
 
|Standard Korean Light Transit Syste
 
|}
 
{|
 
|+
 
'''Table 2. Implementation Examples.'''Coverage of SEBoK Topics for Each Case Study and Vignette. (SEBoK Original)
 
!SEBoK Topic (Part 3)
 
!HST
 
!GPS
 
!Radiation
 
!FBI VCF
 
!MSTI
 
!Infusion Pump
 
!Bag Handling
 
!VA Sub
 
!Route Mod
 
!Water Mgmt
 
!FAA AAS
 
!Light Rail
 
|-
 
|[[Business or Mission Analysis]]
 
|
 
|
 
|
 
 
!X
 
!X
 
|
 
|
 
!X
 
!X
|
 
|
 
 
!X
 
!X
 
!X
 
!X
|
 
 
!X
 
!X
|-
 
|[[Stakeholder Needs and Requirements]]
 
 
|
 
|
|
 
|
 
!X
 
 
|
 
|
 
!X
 
!X
 
|
 
|
|
 
!X
 
!X
 
|
 
!X
 
|-
 
|[[System Requirements]]
 
!X
 
 
!X
 
!X
 
|
 
|
 
!X
 
!X
|
 
 
!X
 
!X
 
|
 
|
 
|
 
|
!X
 
|
 
!X
 
!X
 
 
|-
 
|-
|[[Logical Architecture Development]]
+
|[[System Verification]]
|
 
!X
 
 
|
 
|
 
|
 
|
!X
 
!X
 
!X
 
 
!X
 
!X
 
|
 
|
 
!X
 
!X
!X
 
!X
 
|-
 
|[[Physical Architecture Development]]
 
 
|
 
|
 
!X
 
!X
 
|
 
|
|
 
!X
 
!X
 
 
!X
 
!X
 
!X
 
!X
 
|
 
|
!X
 
!X
 
!X
 
|-
 
|[[System Analysis]]
 
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
!X
 
|
 
|
 
!X
 
!X
 
!X
 
 
|-
 
|-
|[[System Implementation]]
+
|[[System Validation]]
|
 
 
!X
 
!X
|
 
|
 
|
 
|
 
|
 
|
 
 
|
 
|
 
|
 
|
 
|
 
|
 
!X
 
!X
|-
 
|[[System Integration]]
 
 
!X
 
!X
 
!X
 
!X
|
 
 
|
 
|
 
!X
 
!X
|
 
 
!X
 
!X
 
|
 
|
 
|
 
|
!X
 
 
|
 
|
!X
 
|-
 
|[[System Verification]]
 
 
|
 
|
!X
 
!X
 
 
|
 
|
!X
 
!X
 
!X
 
 
|
 
|
 +
|-
 +
|[[System Deployment]]
 
|
 
|
 
|
 
|
!X
 
!X
 
|-
 
|[[System Validation]]
 
 
|
 
|
!X
 
!X
 
 
|
 
|
!X
 
 
!X
 
!X
 
!X
 
!X
Line 538: Line 399:
 
|
 
|
 
|
 
|
!X
 
!X
 
|-
 
|[[System Deployment]]
 
 
|
 
|
 
!X
 
!X
Line 549: Line 406:
 
|
 
|
 
|
 
|
 +
|-
 +
|[[Operation of the System]]
 
|
 
|
 
|
 
|
Line 554: Line 413:
 
|
 
|
 
!X
 
!X
|-
 
|[[Operation of the System]]
 
|
 
 
!X
 
!X
 
|
 
|
Line 562: Line 418:
 
|
 
|
 
!X
 
!X
|
+
!X
 
|
 
|
 
|
 
|
Line 579: Line 435:
 
|
 
|
 
|
 
|
|
 
|
 
!X
 
|-
 
|[[Logistics]]
 
 
|
 
|
 
|
 
|
Line 591: Line 442:
 
|
 
|
 
!X
 
!X
 +
|-
 +
|[[Logistics]]
 
|
 
|
 
|
 
|
Line 596: Line 449:
 
|
 
|
 
|
 
|
|-
 
|[[Planning]]
 
!X
 
 
|
 
|
 
|
 
|
!X
 
 
|
 
|
!X
 
!X
 
 
|
 
|
!X
 
!X
 
!X
 
!X
 
|-
 
|[[Assessment and Control]]
 
 
|
 
|
 
|
 
|
!X
 
!X
 
!X
 
 
|
 
|
 
|
 
|
Line 622: Line 460:
 
|
 
|
 
|
 
|
!X
 
!X
 
 
|-
 
|-
|[[Risk Management]]
+
|[[Planning]]
!X
 
!X
 
!X
 
!X
 
|
 
 
!X
 
!X
 
!X
 
!X
 
|
 
|
 
!X
 
!X
!X
 
!X
 
!X
 
|-
 
|[[Measurement]]
 
|
 
 
|
 
|
 
|
 
|
 
|
 
|
 
!X
 
!X
|
 
|
 
|
 
|
 
|
 
 
|
 
|
 
!X
 
!X
|-
 
|[[Decision Management]]
 
|
 
|
 
 
|
 
|
 
|
 
|
 
!X
 
!X
 
|
 
|
!X
 
 
|
 
|
!X
 
!X
 
 
|
 
|
 +
|-
 +
|[[Assessment and Control]]
 
|
 
|
|-
 
|[[Configuration Management]]
 
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
!X
 
 
|
 
|
 
!X
 
!X
|
 
 
!X
 
!X
|
 
 
!X
 
!X
|
 
|-
 
|[[Information Management]]
 
|
 
|
 
|
 
|
 
|
 
 
|
 
|
 
|
 
|
 
|
 
|
 
!X
 
!X
|
 
|
 
|
 
|-
 
|[[Quality Management]]
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
 
!X
 
!X
 
|
 
|
 
|
 
|
|}
 
 
 
 
{| align="center"
 
|+'''Table 2. Implementation Examples.'''  Coverage of SEBoK Topics for Each Case Study and Vignette. (SEBoK Original)
 
!SEBoK Topic (Part 3)
 
!Bag Handling
 
!VA Sub
 
!Route Mod
 
!Water Mgmt
 
!FAA AAS
 
!Light Rail
 
 
|-
 
|-
|[[Business or Mission Analysis]]
+
|[[Risk Management]]
|
 
 
|
 
|
 
|
 
|
 
!X
 
!X
|
 
 
!X
 
!X
|
 
|
 
 
!X
 
!X
 
!X
 
!X
|
 
 
!X
 
!X
|-
 
|[[Stakeholder Needs and Requirements]]
 
|
 
|
 
|
 
 
!X
 
!X
 
|
 
|
 
!X
 
!X
|
 
 
|
 
|
 
!X
 
!X
 
!X
 
!X
 
|
 
|
!X
 
|-
 
|[[System Requirements]]
 
!X
 
!X
 
|
 
!X
 
 
|
 
|
!X
 
 
|
 
|
|
 
!X
 
|
 
!X
 
!X
 
 
|-
 
|-
|[[Logical Architecture Development]]
+
|[[Measurement]]
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
!X
 
!X
 
!X
 
!X
 
 
|
 
|
!X
 
!X
 
!X
 
|-
 
|[[Physical Architecture Development]]
 
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
!X
 
!X
 
!X
 
!X
 
 
|
 
|
 
!X
 
!X
!X
 
!X
 
|-
 
|[[System Analysis]]
 
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
!X
 
!X
 
!X
 
 
|-
 
|-
|[[System Implementation]]
+
|[[Decision Management]]
|
 
 
!X
 
!X
 
|
 
|
Line 816: Line 542:
 
|
 
|
 
|
 
|
 +
!X
 
|
 
|
 
|
 
|
 
!X
 
!X
|-
 
|[[System Integration]]
 
 
!X
 
!X
 
!X
 
!X
 
|
 
|
 
|
 
|
!X
+
|-
 +
|[[Configuration Management]]
 
|
 
|
!X
 
 
|
 
|
 
|
 
|
!X
 
 
|
 
|
!X
 
|-
 
|[[System Verification]]
 
|
 
!X
 
!X
 
|
 
!X
 
 
!X
 
!X
 
!X
 
!X
|
 
 
|
 
|
 
|
 
|
 
!X
 
!X
!X
 
|-
 
|[[System Validation]]
 
 
|
 
|
 
!X
 
!X
 
!X
 
!X
 
|
 
|
!X
 
!X
 
!X
 
 
|
 
|
 
|
 
|
 
|
 
|
!X
 
!X
 
 
|-
 
|-
|[[System Deployment]]
+
|[[Information Management]]
 +
|
 
|
 
|
 
!X
 
!X
|
 
 
|
 
|
 
|
 
|
Line 875: Line 582:
 
|
 
|
 
!X
 
!X
|-
 
|[[Operation of the System]]
 
|
 
 
!X
 
!X
|
 
|
 
|
 
 
!X
 
!X
 
|
 
|
 
|
 
|
|
 
!X
 
|
 
!X
 
 
|-
 
|-
|[[System Maintenance]]
+
|[[Quality Management]]
|
 
 
|
 
|
 
|
 
|
Line 900: Line 596:
 
|
 
|
 
|
 
|
|
 
|
 
!X
 
|-
 
|[[Logistics]]
 
 
|
 
|
 
|
 
|
Line 912: Line 603:
 
|
 
|
 
!X
 
!X
|
 
|
 
|
 
|
 
 
|
 
|
 
|-
 
|-
|[[Planning]]
+
|[[Enabling Systems Engineering]]
!X
 
|
 
 
|
 
|
!X
 
 
|
 
|
!X
 
 
!X
 
!X
 
|
 
|
 
!X
 
!X
 
!X
 
!X
!X
 
!X
 
|-
 
|[[Assessment and Control]]
 
|
 
|
 
!X
 
!X
 
!X
 
|
 
|
 
|
 
 
|
 
|
 
|
 
|
 
!X
 
!X
!X
 
|-
 
|[[Risk Management]]
 
 
!X
 
!X
 
!X
 
!X
Line 952: Line 620:
 
!X
 
!X
 
|
 
|
!X
 
 
!X
 
!X
 
|
 
|
!X
 
!X
 
!X
 
!X
 
 
|-
 
|-
|[[Measurement]]
+
|[[Related Disciplines]]
|
 
|
 
|
 
|
 
!X
 
|
 
 
|
 
|
 
|
 
|
Line 973: Line 630:
 
|
 
|
 
!X
 
!X
|-
 
|[[Decision Management]]
 
|
 
|
 
|
 
|
 
 
!X
 
!X
|
 
 
!X
 
!X
|
 
!X
 
!X
 
|
 
|
 
|-
 
|[[Configuration Management]]
 
|
 
|
 
|
 
 
|
 
|
 
!X
 
!X
Line 997: Line 637:
 
!X
 
!X
 
|
 
|
!X
 
 
|
 
|
!X
 
|
 
|-
 
|[[Information Management]]
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
!X
 
|
 
|
 
|
 
|-
 
|[[Quality Management]]
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
|
 
!X
 
 
|
 
|
 
|
 
|
 
|}
 
|}
{|
+
!Case Studies
 
!Vignettes
 
|-
 
|'''HS'''
 
|'''Bag Handling'''
 
|Denver Airport Baggage Handling System
 
|-
 
|
 
|'''VA Sub'''
 
|Virginia Class Submarine
 
|-
 
|
 
|'''Route Mod'''
 
|UK West Coast Route Modernisation Project
 
|-
 
|
 
|'''Water Mgmt'''
 
|Singapore Water Management
 
|-
 
|n
 
|'''FAA AAS'''
 
|FAA Advanced Automation System
 
|-
 
|
 
|'''Light Rail'''
 
|Standard Korean Light Transit Syste
 
|}
 
  
 +
Table 3 shows how the topics (each row) align with the second set of implementation examples (each column):
  
 
+
{| align="center"
 
+
|+'''Table 3. Implementation Examples Developed for SEBoK.''' (SEBoK Original)
 
 
{|
 
|+
 
'''Table 2. Implementation Examples.'''Coverage of SEBoK Topics for Each Case Study and Vignette. (SEBoK Original)
 
 
!SEBoK Topic (Part 3)
 
!SEBoK Topic (Part 3)
!HST
 
!GPS
 
!Radiation
 
!FBI VCF
 
!MSTI
 
!Infusion Pump
 
 
!Bag Handling
 
!Bag Handling
 
!VA Sub
 
!VA Sub
Line 1,081: Line 656:
 
|-
 
|-
 
|[[Business or Mission Analysis]]
 
|[[Business or Mission Analysis]]
|
 
|
 
|
 
!X
 
|
 
!X
 
 
|
 
|
 
|
 
|
Line 1,095: Line 664:
 
|-
 
|-
 
|[[Stakeholder Needs and Requirements]]
 
|[[Stakeholder Needs and Requirements]]
|
 
|
 
|
 
!X
 
|
 
!X
 
 
|
 
|
 
|
 
|
Line 1,109: Line 672:
 
|-
 
|-
 
|[[System Requirements]]
 
|[[System Requirements]]
!X
 
!X
 
|
 
!X
 
|
 
!X
 
 
|
 
|
 
|
 
|
Line 1,122: Line 679:
 
!X
 
!X
 
|-
 
|-
|[[Logical Architecture Development]]
+
|[[System Architecture]]
|
 
!X
 
|
 
|
 
!X
 
!X
 
!X
 
!X
 
|
 
!X
 
!X
 
!X
 
|-
 
|[[Physical Architecture Development]]
 
|
 
!X
 
|
 
|
 
!X
 
!X
 
 
!X
 
!X
 
!X
 
!X
Line 1,151: Line 688:
 
|-
 
|-
 
|[[System Analysis]]
 
|[[System Analysis]]
|
 
!X
 
|
 
|
 
|
 
|
 
 
!X
 
!X
 
|
 
|
Line 1,165: Line 696:
 
|-
 
|-
 
|[[System Implementation]]
 
|[[System Implementation]]
|
 
!X
 
|
 
|
 
|
 
|
 
 
|
 
|
 
|
 
|
Line 1,179: Line 704:
 
|-
 
|-
 
|[[System Integration]]
 
|[[System Integration]]
!X
 
!X
 
|
 
|
 
!X
 
|
 
 
!X
 
!X
 
|
 
|
Line 1,193: Line 712:
 
|-
 
|-
 
|[[System Verification]]
 
|[[System Verification]]
|
 
!X
 
!X
 
|
 
!X
 
!X
 
 
!X
 
!X
 
|
 
|
Line 1,207: Line 720:
 
|-
 
|-
 
|[[System Validation]]
 
|[[System Validation]]
|
 
!X
 
!X
 
|
 
!X
 
!X
 
 
!X
 
!X
 
|
 
|
Line 1,221: Line 728:
 
|-
 
|-
 
|[[System Deployment]]
 
|[[System Deployment]]
|
 
!X
 
|
 
|
 
|
 
|
 
 
|
 
|
 
|
 
|
Line 1,235: Line 736:
 
|-
 
|-
 
|[[Operation of the System]]
 
|[[Operation of the System]]
|
 
!X
 
|
 
|
 
|
 
!X
 
 
|
 
|
 
|
 
|
Line 1,249: Line 744:
 
|-
 
|-
 
|[[System Maintenance]]
 
|[[System Maintenance]]
|
 
|
 
|
 
|
 
|
 
|
 
 
|
 
|
 
|
 
|
Line 1,263: Line 752:
 
|-
 
|-
 
|[[Logistics]]
 
|[[Logistics]]
|
 
|
 
|
 
|
 
|
 
|
 
 
!X
 
!X
 
|
 
|
Line 1,277: Line 760:
 
|-
 
|-
 
|[[Planning]]
 
|[[Planning]]
!X
 
|
 
|
 
!X
 
|
 
!X
 
 
!X
 
!X
 
|
 
|
Line 1,291: Line 768:
 
|-
 
|-
 
|[[Assessment and Control]]
 
|[[Assessment and Control]]
|
 
|
 
!X
 
!X
 
!X
 
|
 
 
|
 
|
 
|
 
|
Line 1,305: Line 776:
 
|-
 
|-
 
|[[Risk Management]]
 
|[[Risk Management]]
!X
 
!X
 
!X
 
!X
 
|
 
!X
 
 
!X
 
!X
 
|
 
|
Line 1,319: Line 784:
 
|-
 
|-
 
|[[Measurement]]
 
|[[Measurement]]
|
 
|
 
|
 
|
 
!X
 
|
 
 
|
 
|
 
|
 
|
Line 1,333: Line 792:
 
|-
 
|-
 
|[[Decision Management]]
 
|[[Decision Management]]
|
 
|
 
|
 
|
 
!X
 
|
 
 
!X
 
!X
 
|
 
|
Line 1,347: Line 800:
 
|-
 
|-
 
|[[Configuration Management]]
 
|[[Configuration Management]]
|
+
 
|
 
|
 
|
 
!X
 
|
 
 
!X
 
!X
 
|
 
|
Line 1,361: Line 809:
 
|-
 
|-
 
|[[Information Management]]
 
|[[Information Management]]
|
 
|
 
|
 
|
 
|
 
|
 
 
|
 
|
 
|
 
|
Line 1,375: Line 817:
 
|-
 
|-
 
|[[Quality Management]]
 
|[[Quality Management]]
|
 
|
 
|
 
|
 
|
 
|
 
 
|
 
|
 
|
 
|
Line 1,398: Line 834:
  
 
----
 
----
<center>[[Systems Engineering Implementation Examples|< Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[Case Studies|Next Article >]]</center>
+
<center>[[Systems Engineering Implementation Examples|< Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[Implementation Examples|Next Article >]]</center>
 +
 
 +
<center>'''SEBoK v. 2.9, released 20 November 2023'''</center>
  
 
[[Category: Part 7]]
 
[[Category: Part 7]]
{{DISQUS}}
 

Latest revision as of 22:37, 18 November 2023


Lead Authors: Heidi Davidz, Alice Squires, Tom Hilburn, Contributing Authors: Alex Lee, John Brackett, Richard Turner


The following matrix maps the Systems Engineering Implementation Examples to topics in the Systems Engineering Body of Knowledge (SEBoK). It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset is included here for clarity. For additional information, see the example of interest and the corresponding SEBoK topic.

Organization and Mapping of Examples to the SEBoK

The following short titles shown in Table 1 are used for the implementation examples:

Table 1. Short Titles for the SEBoK Examples. (SEBoK Original)
Case Studies
BT Business Transformation
ATC NextGen Air Traffic Control
NASA NASA's Mission to Saturn
HST Hubble Space Telescope
GPS Global Positioning System
GPS II Global Positioning System II
Radiation Medical Radiation
FBI VCF FBI Virtual Case File System
MSTI Miniature Seeker Technology Integration
Infusion Pump Next Generation Medical Infusion Pump
DfM Design for Maintainability
CAS Complex Adaptive Operating System
PM Project Management
TS Taxi Service
SWFTS SWFTS MBSE
Bag Handling Denver Airport Baggage Handling System
VA Sub Virginia Class Submarine
Route Mod UK West Coast Route Modernisation Project
Water Mgmt Singapore Water Management
FAA AAS FAA Advanced Automation System
Light Rail Standard Korean Light Transit System
TMT Thirty-Meter Telescope

Table 2 shows how the topics (each row) align with the first set of implementation examples (each column):

Table 2. Implementation Examples based on published case studies. (SEBoK Original)
SEBoK Topic BT ATC NASA HST GPS GPS II Radiation FBI VCF MSTI Infusion Pump DfM CAS PM TS SWFTS NHS
Systems Thinking X X X X X X X X X
Models and Simulation X X X X X X
Product Systems Engineering X X X X X
Service Systems Engineering X X X X
Enterprise Systems Engineering X X X X X X X
Systems of Systems (SoS) X X X X X
Life Cycle Models X X X X X X X X
Business or Mission Analysis X X X X X X X
Stakeholder Needs and Requirements X X X X X X X X X
System Requirements X X X X X X X
System Architecture X X X X X X
System Analysis X X X X X
System Implementation X X X
System Integration X X X X X X X X X
System Verification X X X X X
System Validation X X X X X X
System Deployment X X X
Operation of the System X X X X X X
System Maintenance X
Logistics
Planning X X X X X X
Assessment and Control X X X X X
Risk Management X X X X X X X X X
Measurement X
Decision Management X X X X X
Configuration Management X X X X X
Information Management X X X X
Quality Management X
Enabling Systems Engineering X X X X X X X X X
Related Disciplines X X X X X


Table 3 shows how the topics (each row) align with the second set of implementation examples (each column):

Table 3. Implementation Examples Developed for SEBoK. (SEBoK Original)
SEBoK Topic (Part 3) Bag Handling VA Sub Route Mod Water Mgmt FAA AAS Light Rail
Business or Mission Analysis X X X
Stakeholder Needs and Requirements X X X
System Requirements X X X
System Architecture X X X X X
System Analysis X X X X
System Implementation X
System Integration X X X
System Verification X X X
System Validation X X X
System Deployment X
Operation of the System X X
System Maintenance X
Logistics X
Planning X X X X X
Assessment and Control X X
Risk Management X X X X X
Measurement X
Decision Management X X X
Configuration Management X X X
Information Management X
Quality Management X

References

Works Cited

None.

Primary References

None.

Additional References

None.