Difference between revisions of "Matrix of Implementation Examples"
Tag: visualeditor |
m (Text replacement - "SEBoK v. 2.9, released 13 November 2023" to "SEBoK v. 2.9, released 20 November 2023") |
||
(70 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
− | The following matrix maps the | + | ---- |
+ | '''''Lead Authors:''''' ''Heidi Davidz, Alice Squires, Tom Hilburn'', '''''Contributing Authors:''''' ''Alex Lee, John Brackett, Richard Turner'' | ||
+ | ---- | ||
+ | The following matrix maps the [[Systems Engineering Implementation Examples]] to topics in the [[SEBoK Table of Contents|Systems Engineering Body of Knowledge (SEBoK)]]. It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset is included here for clarity. For additional information, see the example of interest and the corresponding SEBoK topic. | ||
− | ==Organization and Mapping of | + | ==Organization and Mapping of Examples to the SEBoK== |
− | The following short titles shown in Table 1 | + | The following short titles shown in Table 1 are used for the implementation examples: |
{| align="center" | {| align="center" | ||
− | |+'''Table 1. Short Titles for the SEBoK | + | |+'''Table 1. Short Titles for the SEBoK Examples.''' (SEBoK Original) |
|- | |- | ||
! scope="col" colspan="2" | Case Studies | ! scope="col" colspan="2" | Case Studies | ||
+ | |- | ||
+ | |'''BT''' | ||
+ | |Business Transformation | ||
+ | |- | ||
+ | |'''ATC''' | ||
+ | |NextGen Air Traffic Control | ||
+ | |- | ||
+ | |'''NASA''' | ||
+ | | NASA's Mission to Saturn | ||
|- | |- | ||
|'''HST''' | |'''HST''' | ||
Line 14: | Line 26: | ||
|'''GPS''' | |'''GPS''' | ||
|Global Positioning System | |Global Positioning System | ||
+ | |- | ||
+ | |'''GPS II''' | ||
+ | |Global Positioning System II | ||
|- | |- | ||
|'''Radiation''' | |'''Radiation''' | ||
Line 26: | Line 41: | ||
|'''Infusion Pump''' | |'''Infusion Pump''' | ||
|Next Generation Medical Infusion Pump | |Next Generation Medical Infusion Pump | ||
+ | |- | ||
+ | |'''DfM''' | ||
+ | |Design for Maintainability | ||
+ | |- | ||
+ | |'''CAS''' | ||
+ | |Complex Adaptive Operating System | ||
+ | |- | ||
+ | |'''PM''' | ||
+ | |Project Management | ||
+ | |- | ||
+ | |'''TS''' | ||
+ | |Taxi Service | ||
+ | |- | ||
+ | |'''SWFTS''' | ||
+ | |SWFTS MBSE | ||
+ | |- | ||
+ | |'''Bag Handling''' | ||
+ | |Denver Airport Baggage Handling System | ||
+ | |- | ||
+ | |'''VA Sub''' | ||
+ | |Virginia Class Submarine | ||
+ | |- | ||
+ | |'''Route Mod''' | ||
+ | |UK West Coast Route Modernisation Project | ||
+ | |- | ||
+ | |'''Water Mgmt''' | ||
+ | |Singapore Water Management | ||
+ | |- | ||
+ | |'''FAA AAS''' | ||
+ | |FAA Advanced Automation System | ||
+ | |- | ||
+ | |'''Light Rail''' | ||
+ | |Standard Korean Light Transit System | ||
+ | |- | ||
+ | |'''TMT''' | ||
+ | |Thirty-Meter Telescope | ||
|} | |} | ||
− | Table 2 shows how the topics (each row) align with the | + | Table 2 shows how the topics (each row) align with the first set of implementation examples (each column): |
{| align="center" | {| align="center" | ||
− | |+'''Table 2. Implementation Examples.''' | + | |+'''Table 2. Implementation Examples based on published case studies.''' (SEBoK Original) |
− | !SEBoK Topic | + | !SEBoK Topic |
+ | !BT | ||
+ | !ATC | ||
+ | !NASA | ||
!HST | !HST | ||
!GPS | !GPS | ||
+ | !GPS II | ||
!Radiation | !Radiation | ||
!FBI VCF | !FBI VCF | ||
!MSTI | !MSTI | ||
!Infusion Pump | !Infusion Pump | ||
+ | !DfM | ||
+ | !CAS | ||
+ | !PM | ||
+ | !TS | ||
+ | !SWFTS | ||
+ | !NHS | ||
+ | |- | ||
+ | |[[Systems Thinking]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |[[Representing Systems with Models|Models and Simulation]] | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | |- | ||
+ | |[[Product Systems Engineering]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | |- | ||
+ | |[[Service Systems Engineering]] | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
+ | |- | ||
+ | |[[Enterprise Systems Engineering]] | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
+ | |- | ||
+ | |[[Systems of Systems (SoS)]] | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
+ | |- | ||
+ | |[[Life Cycle Models]] | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
|- | |- | ||
|[[Business or Mission Analysis]] | |[[Business or Mission Analysis]] | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
| | | | ||
+ | !X | ||
| | | | ||
+ | !X | ||
| | | | ||
!X | !X | ||
| | | | ||
+ | | | ||
+ | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Stakeholder Needs and Requirements]] | |[[Stakeholder Needs and Requirements]] | ||
+ | !X | ||
+ | !X | ||
| | | | ||
+ | !X | ||
| | | | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
| | | | ||
!X | !X | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
!X | !X | ||
+ | | | ||
|- | |- | ||
|[[System Requirements]] | |[[System Requirements]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
| | | | ||
!X | !X | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
|- | |- | ||
|[[System Architecture]] | |[[System Architecture]] | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
| | | | ||
+ | !X | ||
!X | !X | ||
| | | | ||
Line 71: | Line 292: | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[System Analysis]] | |[[System Analysis]] | ||
+ | | | ||
+ | | | ||
+ | !X | ||
| | | | ||
!X | !X | ||
| | | | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
| | | | ||
|- | |- | ||
|[[System Implementation]] | |[[System Implementation]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
!X | !X | ||
| | | | ||
| | | | ||
+ | !X | ||
| | | | ||
| | | | ||
|- | |- | ||
|[[System Integration]] | |[[System Integration]] | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
!X | !X | ||
!X | !X | ||
Line 94: | Line 345: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
| | | | ||
|- | |- | ||
|[[System Verification]] | |[[System Verification]] | ||
+ | | | ||
+ | | | ||
+ | !X | ||
| | | | ||
!X | !X | ||
+ | | | ||
!X | !X | ||
| | | | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[System Validation]] | |[[System Validation]] | ||
+ | !X | ||
+ | | | ||
| | | | ||
+ | | | ||
+ | !X | ||
!X | !X | ||
!X | !X | ||
Line 111: | Line 382: | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[System Deployment]] | |[[System Deployment]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
!X | !X | ||
+ | | | ||
| | | | ||
| | | | ||
Line 121: | Line 408: | ||
|- | |- | ||
|[[Operation of the System]] | |[[Operation of the System]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
+ | !X | ||
!X | !X | ||
| | | | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
| | | | ||
!X | !X | ||
Line 135: | Line 432: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[Logistics]] | |[[Logistics]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 146: | Line 463: | ||
|[[Planning]] | |[[Planning]] | ||
!X | !X | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
+ | | | ||
| | | | ||
| | | | ||
Line 151: | Line 472: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Assessment and Control]] | |[[Assessment and Control]] | ||
| | | | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
| | | | ||
|- | |- | ||
|[[Risk Management]] | |[[Risk Management]] | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
!X | !X | ||
!X | !X | ||
Line 167: | Line 508: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Measurement]] | |[[Measurement]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 174: | Line 525: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
|[[Decision Management]] | |[[Decision Management]] | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
+ | !X | ||
| | | | ||
| | | | ||
+ | !X | ||
+ | !X | ||
!X | !X | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 190: | Line 557: | ||
| | | | ||
!X | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
|[[Information Management]] | |[[Information Management]] | ||
| | | | ||
+ | | | ||
+ | !X | ||
| | | | ||
| | | | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
| | | | ||
Line 207: | Line 594: | ||
| | | | ||
| | | | ||
− | | | + | | |
− | + | | | |
− | + | | | |
− | + | | | |
− | | | + | | |
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
|- | |- | ||
− | ! | + | |[[Enabling Systems Engineering]] |
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
+ | | | ||
|- | |- | ||
− | | | + | |[[Related Disciplines]] |
− | | | + | | |
− | | | + | | |
− | | | + | | |
− | | | + | | |
− | | | + | | |
− | + | !X | |
− | + | !X | |
− | + | !X | |
− | | | + | | |
− | + | !X | |
− | | | + | | |
− | + | !X | |
− | | | + | | |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|} | |} | ||
+ | |||
− | Table | + | Table 3 shows how the topics (each row) align with the second set of implementation examples (each column): |
{| align="center" | {| align="center" | ||
− | |+'''Table | + | |+'''Table 3. Implementation Examples Developed for SEBoK.''' (SEBoK Original) |
!SEBoK Topic (Part 3) | !SEBoK Topic (Part 3) | ||
!Bag Handling | !Bag Handling | ||
Line 391: | Line 800: | ||
|- | |- | ||
|[[Configuration Management]] | |[[Configuration Management]] | ||
+ | |||
!X | !X | ||
| | | | ||
Line 424: | Line 834: | ||
---- | ---- | ||
− | <center>[[Systems Engineering Implementation Examples|< Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[ | + | <center>[[Systems Engineering Implementation Examples|< Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[Implementation Examples|Next Article >]]</center> |
+ | |||
+ | <center>'''SEBoK v. 2.9, released 20 November 2023'''</center> | ||
[[Category: Part 7]] | [[Category: Part 7]] | ||
− |
Latest revision as of 22:37, 18 November 2023
Lead Authors: Heidi Davidz, Alice Squires, Tom Hilburn, Contributing Authors: Alex Lee, John Brackett, Richard Turner
The following matrix maps the Systems Engineering Implementation Examples to topics in the Systems Engineering Body of Knowledge (SEBoK). It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset is included here for clarity. For additional information, see the example of interest and the corresponding SEBoK topic.
Organization and Mapping of Examples to the SEBoK
The following short titles shown in Table 1 are used for the implementation examples:
Case Studies | |
---|---|
BT | Business Transformation |
ATC | NextGen Air Traffic Control |
NASA | NASA's Mission to Saturn |
HST | Hubble Space Telescope |
GPS | Global Positioning System |
GPS II | Global Positioning System II |
Radiation | Medical Radiation |
FBI VCF | FBI Virtual Case File System |
MSTI | Miniature Seeker Technology Integration |
Infusion Pump | Next Generation Medical Infusion Pump |
DfM | Design for Maintainability |
CAS | Complex Adaptive Operating System |
PM | Project Management |
TS | Taxi Service |
SWFTS | SWFTS MBSE |
Bag Handling | Denver Airport Baggage Handling System |
VA Sub | Virginia Class Submarine |
Route Mod | UK West Coast Route Modernisation Project |
Water Mgmt | Singapore Water Management |
FAA AAS | FAA Advanced Automation System |
Light Rail | Standard Korean Light Transit System |
TMT | Thirty-Meter Telescope |
Table 2 shows how the topics (each row) align with the first set of implementation examples (each column):
Table 3 shows how the topics (each row) align with the second set of implementation examples (each column):
SEBoK Topic (Part 3) | Bag Handling | VA Sub | Route Mod | Water Mgmt | FAA AAS | Light Rail |
---|---|---|---|---|---|---|
Business or Mission Analysis | X | X | X | |||
Stakeholder Needs and Requirements | X | X | X | |||
System Requirements | X | X | X | |||
System Architecture | X | X | X | X | X | |
System Analysis | X | X | X | X | ||
System Implementation | X | |||||
System Integration | X | X | X | |||
System Verification | X | X | X | |||
System Validation | X | X | X | |||
System Deployment | X | |||||
Operation of the System | X | X | ||||
System Maintenance | X | |||||
Logistics | X | |||||
Planning | X | X | X | X | X | |
Assessment and Control | X | X | ||||
Risk Management | X | X | X | X | X | |
Measurement | X | |||||
Decision Management | X | X | X | |||
Configuration Management | X | X | X | |||
Information Management | X | |||||
Quality Management | X |
References
Works Cited
None.
Primary References
None.
Additional References
None.