Difference between revisions of "Preliminary Design Review (PDR) (glossary)"

From SEBoK
Jump to navigation Jump to search
(Created page with '''<blockquote>A comprehensive, integrated plan that identifies the acquisition approach and describes the business, technical, and support strategies that management will follow ...')
 
m (Text replacement - "SEBoK v. 2.9, released 13 November 2023" to "SEBoK v. 2.9, released 20 November 2023")
(25 intermediate revisions by 5 users not shown)
Line 1: Line 1:
''<blockquote>A comprehensive, integrated plan that identifies the acquisition approach and describes the business, technical, and support strategies that management will follow to manage program risks and meet program objectives. The Acquisition Strategy should define the relationship between the acquisition phases and work efforts, and key program events such as decision points, reviews, contract awards, test activities, production lot/delivery quantities, and operational deployment objectives. (DAU February 19, 2010)</blockquote>''
+
<blockquote>''A review conducted to evaluate the progress, technical adequacy, and risk resolution of the selected design approach for one or more configuration items; to determine each design's compatibility with the requirements for the configuration item; to evaluate the degree of definition and assess the technical risk associated with the selected manufacturing methods and processes; to establish the existence and compatibility of the physical and functional interfaces among the configuration items and other items of equipment, facilities, software and personnel; and, as applicable, to evaluate the preliminary operational and support documents.'' (ISO/IEC/IEEE 24765 2009)</blockquote>
  
====Source====
+
===Source===
DAU. February 19, 2010. ''Defense Acquisition Guidebook (DAG)''. Ft. Belvoir, VA, USA: Defense Acquisition University (DAU)/U.S. Department of Defense (DoD).  
+
ISO/IEC/IEEE. 2009. ''Systems and Software Engineering - System and Software Engineering Vocabulary (SEVocab)''. Geneva, Switzerland: International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC)/ Institute of Electrical and Electronics Engineers (IEEE). ISO/IEC/IEEE 24765:2009.
  
 
===Discussion===
 
===Discussion===
Discussion as to why this is the "consensus" definition for the SEBoK.
+
None.
  
 
[[Category:Glossary of Terms]]
 
[[Category:Glossary of Terms]]
 +
 +
<center>'''SEBoK v. 2.9, released 20 November 2023'''</center>

Revision as of 22:28, 18 November 2023

A review conducted to evaluate the progress, technical adequacy, and risk resolution of the selected design approach for one or more configuration items; to determine each design's compatibility with the requirements for the configuration item; to evaluate the degree of definition and assess the technical risk associated with the selected manufacturing methods and processes; to establish the existence and compatibility of the physical and functional interfaces among the configuration items and other items of equipment, facilities, software and personnel; and, as applicable, to evaluate the preliminary operational and support documents. (ISO/IEC/IEEE 24765 2009)

Source

ISO/IEC/IEEE. 2009. Systems and Software Engineering - System and Software Engineering Vocabulary (SEVocab). Geneva, Switzerland: International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC)/ Institute of Electrical and Electronics Engineers (IEEE). ISO/IEC/IEEE 24765:2009.

Discussion

None.

SEBoK v. 2.9, released 20 November 2023