Difference between revisions of "Problem (glossary)"
Jump to navigation
Jump to search
(Created page with '''<blockquote>A comprehensive, integrated plan that identifies the acquisition approach and describes the business, technical, and support strategies that management will follow ...') |
|||
Line 1: | Line 1: | ||
− | ''<blockquote>A | + | ''<blockquote>(1) A concern that has a probability of occurrence equal to one, a consequence of occurrence greater than zero, and a time-frame that is current.</blockquote>'' |
+ | |||
+ | ''<blockquote>(2) an issue that has occurred and has had a negative impact to the project. (Conrow 2008)</blockquote>'' | ||
====Source==== | ====Source==== | ||
− | + | (1) and (2) Conrow,E. 2008. "Risk Analysis for Space Systems". Paper presented at Space Systems Engineering and Risk Management Symposium, 27-29 February, 2008, Los Angeles, CA, USA. | |
===Discussion=== | ===Discussion=== |
Revision as of 19:53, 17 May 2011
(1) A concern that has a probability of occurrence equal to one, a consequence of occurrence greater than zero, and a time-frame that is current.
(2) an issue that has occurred and has had a negative impact to the project. (Conrow 2008)
Source
(1) and (2) Conrow,E. 2008. "Risk Analysis for Space Systems". Paper presented at Space Systems Engineering and Risk Management Symposium, 27-29 February, 2008, Los Angeles, CA, USA.
Discussion
Discussion as to why this is the "consensus" definition for the SEBoK.