To control the progress of a project, different types of reviews are planned.  The most commonly used are listed as follows, although the names are not universal:
 
To control the progress of a project, different types of reviews are planned.  The most commonly used are listed as follows, although the names are not universal:
* System Requirements Review is planned to verify and validate the set of system requirements before starting the detailed design activities;
+
* the System Requirements Review is planned to verify and validate the set of system requirements before starting the detailed design activities;
* Preliminary Design Review is planned to verify and validate the set of system requirements, the design artifacts, and justification elements at the end of the first engineering loop (also known as the "Design-to" gate);
+
* the Preliminary Design Review is planned to verify and validate the set of system requirements, the design artifacts, and justification elements at the end of the first engineering loop (also known as the "Design-to" gate);
* Critical Design Review is planned to verify and validate the set of system requirements, the design artifacts, and justification elements at the end of the last engineering loop (the “Build-to” and “Code-to” designs are released after this review);
+
* the Critical Design Review is planned to verify and validate the set of system requirements, the design artifacts, and justification elements at the end of the last engineering loop (the “Build-to” and “Code-to” designs are released after this review);
* [[Integration, Verification, and Validation (IV&V) (glossary)|Integration, Verification, and Validation (glossary)]] Reviews are planned as the components are assembled into higher level subsystems and elements. A sequence of reviews are held to ensure that everything integrates properly and that there is objective evidence that all requirements have been met.  There should also be an in-process validation that the system, as it is evolving, will meet the stakeholders’ requirements (see Figure 10);
+
* the [[Integration, Verification, and Validation (IV&V) (glossary)|Integration, Verification, and Validation (glossary)]] Reviews are planned as the components are assembled into higher level subsystems and elements. A sequence of reviews are held to ensure that everything integrates properly and that there is objective evidence that all requirements have been met.  There should also be an in-process validation that the system, as it is evolving, will meet the stakeholders’ requirements (see Figure 10);
* Final Validation Review is carried out at the end of the integration phase; and
+
* the Final Validation Review is carried out at the end of the integration phase; and
* Other Project Reviews related to management can be planned in order to control the correct progress of work, based on the type of system and associated risks.
+
* other project reviews related to management can be planned in order to control the correct progress of work, based on the type of system and associated risks.
  
  
Line 98: Line 98:
 
===Utilization Stage===
 
===Utilization Stage===
  
A significant aspect of product life cycle management is the provisioning of supporting systems that are vital in sustaining operation of the product.  While the supplied product or service may be seen as the Narrow System of Interest (NSOI) for an acquirer, the acquirer also must incorporate the supporting systems into a Wider System of Interest.  These supporting systems should be seen as system assets that, when needed, are activated in responding to a situation that has emerged in respect to operation of the NSOI.  The collective name for the set of supporting systems is the Integrated Logistics Support (ILS) System.  Some typical types of ILS systems are indicated in Figure 7.
+
A significant aspect of product life cycle management is the provisioning of supporting systems that are vital in sustaining operation of the product.  While the supplied product or service may be seen as the narrow system of interest (NSOI) for an acquirer, the acquirer also must incorporate the supporting systems into a wider system of interest.  These supporting systems should be seen as system assets that, when needed, are activated in responding to a situation that has emerged in respect to operation of the NSOI.  The collective name for the set of supporting systems is the Integrated Logistics Support (ILS) system.  Some typical types of ILS systems are indicated in Figure 7.
  
 
The ILS portrayed in the figure identifies several typical elements of this ILS system.  The elements are system assets for a supplying enterprise that are instantiated and put into operation in responding to logistics related situations.
 
The ILS portrayed in the figure identifies several typical elements of this ILS system.  The elements are system assets for a supplying enterprise that are instantiated and put into operation in responding to logistics related situations.

Revision as of 08:05, 8 September 2011

There are a large number of life cycle process models. These models fall into three major categories:

  1. Primarily prespecified and sequential processes
  2. Primarily evolutionary and concurrent processes (e.g., the Rational Unified Process and various forms of the Vee and spiral models)
  3. Primarily interpersonal and unconstrained processes (e.g., agile development, Scrum, Extreme Programming, Dynamic System Development Method, and innovation-based processes)

This article discusses the Vee model as the primary example of the first category. The second two categories are discussed in the article System Life Cycle Process Models: Iterative.

A Primarily Prespecified and Sequential Process Model: The Vee Model

The sequential version of the Vee model is shown in Figure 1. Its core involves a sequential progression of plans, specifications, and products that are baselined and put under configuration management. The vertical two-headed arrow enables projects to perform concurrent opportunity and risk analyses, and continuous in-process validation.

Left side of the Vee model (Forsberg, Mooz, and Cotterman 2005. Pg 111)

Figure 1. Left side of the sequential Vee model (Forsberg 2005, 111)


The Vee model endorses the INCOSE Systems Engineering Handbook 2011 definition of life cycle stages and their purposes or activities, as shown in Table 1 below.

Generic life cycle stages, their purposes, and decision gate options(INCOSE Systems Engineering Handbook 2011, p 25; also ISO/IEC 15288:2008)

Table 1. Generic life cycle stages, their purposes, and decision gate options (INCOSE 2011, 25)

Application of the Vee Model

Lawson (2010) elaborates on the activities in each life cycle stage and notes that it is useful to consider the structure of a generic life cycle stage model for any type of system of interest as portrayed in Figure 2 (Lawson 2010). This (T) model indicates that one or more definition stages precede a production stage(s) where the implementation (acquisition, provisioning, or development) of two or more system elements has been accomplished.

Generic (T) Stage Structure of System Life Cycle Models

Figure 2. Generic (T) stage structure of system life cycle models (Lawson 2010, Figures 6-2 to 6-5)

The generic life cycle stages for a variety of different organizations, from standards (ISO/IEC) to commercial to government, are shown in Figure 3. Note that although different in detail, all have a similar sequential format that emphasizes the core activities as noted in Figure 2.

Comparisons of life cycle models (Forsberg, Mooz, and Cotterman 2005, p 87 updated)

Figure 3. Comparisons of life cycle models (Forsberg, Mooz, and Cotterman 2005, 87)

Fundamentals of Life Cycle Stages and Program Management Phase

The notion of life cycle is related to the notion of program management that was presented in the previous section. Note that:

  • The term "stage" refers to the different states of the system during its life cycle; some stages may overlap in time such as the utilization stage and the support stage. The term “stage” is used in ISO/IEC/IEEE 15288.
  • The term "phase" refers to the different steps of the program that supports and manages the life of the system; the phases usually do not overlap. The term “phase” is used in many well-established models as equivalent to “stage.”

Program management employs phases, milestones, and decision gates during which the stages of the system evolve. The stages contain the activities performed to achieve goals; the phases serve to control and the manage the sequence of stages and the transitions between each stage. For each project it is essential that the team define and publish the terms and related definitions used on respective projects to minimize confusion.

As an example, Figure 4 shows a typical program management sequence. This classical program is composed of the following phases:

  • The pre-study phase
  • The feasibility phase—This phase consists of studying the feasibility of alternative concepts to reach a second decision gate before initiating the execution stage. It is the “go-ahead decision” based on:
    • whether a concept is feasible and is considered able to counter an identified threat or exploit an opportunity,
    • whether a concept is sufficiently mature to warrant continued development of a new product or line of products, and
    • whether to approve a proposal generated in response to a request for proposal.

During the feasibility phase stakeholders' requirements and system requirements are identified, viable solutions are designed and studied, and virtual prototypes are engineered and can be implemented.

  • The execution phase—This phase includes activities related to four stages of the system: development, production, utilization and support. Typically there are two decision gates and two milestones associated with execution activities. The first milestone provides the opportunity for management to review the plans for execution before giving the go-ahead. The second milestone provides the opportunity to review progress before the decision is made to initiate production. The decision gates during execution can be used to determine whether to produce the developed system-of-interest and whether to improve it or retire it.

These program management views apply not only to the system-of-interest but also to its elements and structure.

Program Management and Engineering Views of the System Life Cycle

Figure 4. Program Management and Engineering Views of the sequential System Life Cycle (ISO/IEC 19760:2003)

Life Cycle Stages

Exploratory Research Stage

The most important phase in the project cycle is the user requirements analysis and agreement phase, which is part of the exploratory research stage. The first step is to define the user (and stakeholder) requirements and constraints.

A key part of this process is to establish the feasibility of meeting the user requirements.

Except for the first and last decision gates of a project, the gates are performed simultaneously. See Figure 5.

Scheduling the Development Phases

Figure 5. Scheduling the Development Phases (Faisandier 2010)

Reviews

To control the progress of a project, different types of reviews are planned. The most commonly used are listed as follows, although the names are not universal:

  • the System Requirements Review is planned to verify and validate the set of system requirements before starting the detailed design activities;
  • the Preliminary Design Review is planned to verify and validate the set of system requirements, the design artifacts, and justification elements at the end of the first engineering loop (also known as the "Design-to" gate);
  • the Critical Design Review is planned to verify and validate the set of system requirements, the design artifacts, and justification elements at the end of the last engineering loop (the “Build-to” and “Code-to” designs are released after this review);
  • the Integration, Verification, and Validation (glossary) Reviews are planned as the components are assembled into higher level subsystems and elements. A sequence of reviews are held to ensure that everything integrates properly and that there is objective evidence that all requirements have been met. There should also be an in-process validation that the system, as it is evolving, will meet the stakeholders’ requirements (see Figure 10);
  • the Final Validation Review is carried out at the end of the integration phase; and
  • other project reviews related to management can be planned in order to control the correct progress of work, based on the type of system and associated risks.


Right side of the Vee Model

Figure 6. Right side of the Vee Model (Forsberg, Mooz, and Cotterman 2005, 115)

Production Stage

The production stage is where the system-of-interest is produced or manufactured. Product modifications may be required to resolve production problems, to reduce production costs, or to enhance product or system-of-interest capabilities. Any of these may influence system requirements and may require system re-qualification , re-verification , or re-validation . All such changes require SE assessment before changes are approved.

Utilization Stage

A significant aspect of product life cycle management is the provisioning of supporting systems that are vital in sustaining operation of the product. While the supplied product or service may be seen as the narrow system of interest (NSOI) for an acquirer, the acquirer also must incorporate the supporting systems into a wider system of interest. These supporting systems should be seen as system assets that, when needed, are activated in responding to a situation that has emerged in respect to operation of the NSOI. The collective name for the set of supporting systems is the Integrated Logistics Support (ILS) system. Some typical types of ILS systems are indicated in Figure 7.

The ILS portrayed in the figure identifies several typical elements of this ILS system. The elements are system assets for a supplying enterprise that are instantiated and put into operation in responding to logistics related situations.

It is vital to have a holistic view when defining, producing and operating system products and services. In Figure 7, the relationship between system design and development and the ILS requirements is portrayed.

Typical Integrated Logistics Support (ILS) Supporting Systems (Blanchard 2004)

Figure 7. Typical Integrated Logistics Support (ILS) Supporting Systems (Blanchard 2004)

Relating ILS to the System Life Cycle

Figure 8. Relating ILS to the System Life Cycle (ASD-STAN 2009, Fig 1, 2009 Products and Services S3000L, www.asd-stn.org.)


The requirements for reliability resulting in the need of maintainability and testability are driving factors.

Support Stage

In the support stage, the system-of-interest is provided services that enable continued operation. Modifications may be proposed to resolve supportability problems, to reduce operational costs, or to extend the life of a system. These changes require SE assessment to avoid loss of system capabilities while under operation. The corresponding technical process is the maintenance process.

Retirement Stage

In the retirement stage, the system-of-interest and its related services are removed from operation. SE activities in this stage are primarily focused on ensuring that disposal requirements are satisfied. In fact, planning for disposal is part of the system definition during the concept stage. Experience in the 20th century repeatedly demonstrated the consequences when system retirement and disposal are not considered from the outset. Early in the 21st century, many countries have changed their laws to hold the creator of a system-of-interest accountable for proper end-of-life disposal of the system.

References

Citations

Faisandier, A. Engineering and Architecting Multidisciplinary Systems (forthcoming).

Forsberg, K., H. Mooz, and H. Cotterman. Visualizing Project Management, 3rd ed. (New York: Wiley and Sons, Inc., 2005).

INCOSE, “Systems Engineering Handbook,” version 3.2.1, document INCOSE-TP-2003-002-03.2.1, International Council on Systems Engineering.

Lawson, H. A Journey Through the Systems Landscape (London: College Publications, 2010).

Primary References

Boehm, B., J. Lane, S. Koolmanojwong, and R. Turner. Embracing the Spiral Model: Creating Successful Systems with the Incremental Commitment Spiral Model (Boston: Addison Wesley, forthcoming).

Boehm, B. and R. Turner. Balancing Agility and Discipline (Boston: Addison Wesley, 2004).

Fairley, R. Managing and Leading Software Projects (New York: Wiley and Sons, Inc., 2009).

Fosburg, K., H. Mooz, and H. Cotterman. Visualizing Project Management, 3rd ed. (New York: Wiley and Sons, Inc., 2005).

Faisandier, A. Engineering and Architecting Multidisciplinary Systems (forthcoming).

INCOSE, “Systems Engineering Handbook,” version 3.2.1, document INCOSE-TP-2003-002-03.2.1, International Council on Systems Engineering.

Lawson, H. A Journey Through the Systems Landscape (London: College Publications, 2010).

Pew, R. and A. Mayor, eds. Human-System Integration in the System Development Process: A New Look (Washington, D.C.: The National Academies Press, 2007).

“Principles Behind the Agile Manifesto,” The Agile Manifesto, last modified 2001, accessed on December 15, 2009, http://www.agilemanifesto.org/principles.html.

Royce, W. E. Software Project Management (Boston: Addison Wesley, 1998).

Additional References

Anderson, D. Kanban (Sequim, WA: Blue Hole Press, 2010).

Baldwin, C. and K. Clark. Design Rules: The Power of Modularity (Boston: Massachusetts Institute of Technology (MIT) Press, 2000).

Beck, K. Extreme Programming Explained (Boston: Addison Wesley, 1999).

Biffl, S. A. Aurum, B. Boehm, H. Erdogmus, and P. Gruenbacher, eds. Value-Based Software Engineering (New York: Springer, 2005).

Boehm, B. and W. May. “A Spiral Model of Software Development and Enhancement.” IEEE Computer 21, no. 5 (1988): 61-72.

---. “Some Future Trends and Implications for Systems and Software Engineering.” Systems Engineering 9, no. 1 (2006), 1-19.

Boehm, B., A. Egyed, J. Kwan, D. Port, A. Shah, and R. Madachy. “Using the Win-Win Spiral Model: A Case Study.” IEEE Computer 31, no. 7 (2006): 33-44.

Checkland, P. Systems Thinking, Systems Practice (New York: Wiley and Sons, Inc., 1981).

Crosson, S. and B. Boehm. “Adjusting Software Life Cycle Anchor Points: Lessons Learned in a System of Systems Context” (proceedings, SSTC, Salt Lake City, UT, 2009).

Dingsoyr, T., T. Dyba, and N. Moe, eds. “Agile Software Development: Current Research and Future Directions.” In Architected Agile Solutions for Software-Reliant Systems, by B. Boehm, J. Lane, S. Koolmanjwong, and R. Turner, PAGES NEEDED. New York: Springer, 2010.

Dorner, D. The Logic of Failure (New York: Basic Books, 1996).

Forsberg, K. “'If I Could Do That, Then I Could...' System Engineering in a Research and Development Environment” (proceedings, Fifth INCOSE Summer Symposium, LOCATION, 1995).

---. “Projects Don't Begin with Requirements.” Paper presented at the IEEE Systems Conference, San Diego, April 2010.

Gilb, T. Competitive Engineering (Oxford, UK: Elsevier Butterworth-Heinmann, 2005).

Goldratt, E. The Goal (Great Barrington, MA: North River Press, 1984).

Hitchins, D. Systems Engineering: A 21st Century Systems Methodology (New York: Wiley and Sons, Inc., 2007).

Holland, J. Emergence (Jackson, TN: Perseus Books, 1998).

ISO/IEC, “Systems and Software Engineering—System Life Cycle Processes,” document ISO/IEC 15288:2008, International Organization for Standardization (ISO)/International Electronical Commission (IEC).

ISO/IEC, “A Guide for Application of ISO/IEC 15288—System Life Cycle Processes,” document ISO/IEC 19760:2003, International Organization for Standardization (ISO)/International Electronical Commission (IEC).

ISO/IEC, “Systems and Software Engineering, Part 1: Guide for Life Cycle Management,” document ISO/IEC 24748-1:2010, International Organization for Standardization (ISO)/International Electronical Commission (IEC).

Krutchen, P. The Rational Unified Process (Boston: Addison Wesley, 1999).

Landis, T. R. Lockheed Blackbird Family (A-12, YF-12, D-21/M-21 & SR-71)” (North Branch, MD: Specialty Press, 2010).

Madachy, R. Software Process Dynamics (New York: Wiley and Sons, Inc., 2008).

Maranzano, J., et al. “Architecture Reviews: Practice and Experience.” IEEE Software 22, no. 2 (2005): 34-43.

National Research Council of the National Academies. Pre-Milestone A and Early-Phase Systems Engineering (Washington, D.C.: The National Academies Press, 2008).

Osterweil, L. “Software Processes Are Software Too” (proceedings, ICSE 9, Monterey, CA, 1987).

Poppendeick, M. and T. Lean Software Development: An Agile Toolkit (Boston: Addison Wesley, 2003).

“Principles Behind the Agile Manifesto,” The Agile Manifesto, last modified 2001, accessed on December 15, 2009, http://www.agilemanifesto.org/principles.html.

Rechtin, E. System Architecting: Creating and Building Complex Systems (Upper Saddle River, NJ: Prentice Hall, 1991).

Rechtin, E. and M. Maier. The Art of System Architecting (Boca Raton, FL: CRC Press, 1997).

Schwaber, K. and M. Beedle. Agile Software Development with Scrum (Upper Saddle River, NJ: Prentice Hall, 2002).

“Top Five Quality Software Projects,” Crosstalk, January 2002; July 2003; July 2004; September 2005, http://www.crosstalkonline.org http://www.crosstalkonline.org.

Warfield, J. Societal Systems: Planning, Policy, and Complexity (New York: Wiley and Sons, Inc., 1976).

Womack, J. and D. Jones. Lean Thinking (New York: Simon & Schuster, 1996).