System Realization (glossary)

From SEBoK
Revision as of 14:49, 14 September 2011 by Janthony (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Jump to navigation Jump to search

Includes the activities required to build a system , integrate disparate system elements, and ensure that the system both meets the needs of stakeholders and aligns with the requirements identified in the system definition stage.

Source

None cited.

Discussion