Difference between revisions of "Tailoring (glossary)"
Jump to navigation
Jump to search
Wikiexpert (talk | contribs) m (Removed protection from "tailoring ") |
m (Text replacement - "SEBoK v. 2.9, released 13 November 2023" to "SEBoK v. 2.9, released 20 November 2023") |
||
(21 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
− | + | <blockquote>Adapted from notes/discussion of "tailoring guide" (ISO/IEC/IEEE 2009): Tailoring a process adapts the process description for a particular end. For example, a project creates its defined process by tailoring the organization's set of standard processes to meet the objectives, constraints, and environment of the project. (ISO/IEC/IEEE 2009)</blockquote> | |
− | === | + | ===Sources=== |
− | + | ISO/IEC/IEEE. 2009. ''Systems and Software Engineering - System and Software Engineering Vocabulary''. Geneva, Switzerland: International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC)/ Institute of Electrical and Electronics Engineers (IEEE). ISO/IEC/IEEE 24765:2009. | |
===Discussion=== | ===Discussion=== | ||
− | + | None. | |
[[Category:Glossary of Terms]] | [[Category:Glossary of Terms]] | ||
+ | <center>'''SEBoK v. 2.9, released 20 November 2023'''</center> |
Latest revision as of 22:10, 18 November 2023
Adapted from notes/discussion of "tailoring guide" (ISO/IEC/IEEE 2009): Tailoring a process adapts the process description for a particular end. For example, a project creates its defined process by tailoring the organization's set of standard processes to meet the objectives, constraints, and environment of the project. (ISO/IEC/IEEE 2009)
Sources
ISO/IEC/IEEE. 2009. Systems and Software Engineering - System and Software Engineering Vocabulary. Geneva, Switzerland: International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC)/ Institute of Electrical and Electronics Engineers (IEEE). ISO/IEC/IEEE 24765:2009.
Discussion
None.