Technical Performance Measure (TPM) (glossary)

From SEBoK
Revision as of 19:32, 19 May 2022 by WikiWorks (talk | contribs) (Text replacement - "<center>'''SEBoK v. 2.6, released 13 May 2022'''</center>" to "<center>'''SEBoK v. 2.6, released 20 May 2022'''</center>")

Jump to navigation Jump to search

(1) Measures of attributes of a system element within the system to determine how well the system or system element is satisfying specified requirements. (Roedler and Jones 2005, 1-65)

(2) A product design assessment, which estimates, through engineering analysis and tests, the values of essential performance parameters of the current design as effected by risk handling actions. (BMP 2012)

Source

(1) Roedler, G. J., and C. Jones. 2005. Technical Measurement: A Collaborative Project of PSM, INCOSE, and Industry. San Diego, CA, USA: Practical Software & Systems Management (PSM)/International Council on Systems Engineering (INCOSE), INCOSE-TP-2003-020-01.

(2) BMP. 2012. "2.8 Risk Monitoring." Accessed September 13, 2012. Available at: http://www.bmpcoe.org/library/books/dsmc%20rmg%204th/69.html.

Discussion

None.

SEBoK v. 2.6, released 20 May 2022