Difference between revisions of "The Capability Maturity Model"

From SEBoK
Jump to navigation Jump to search
m (Text replacement - "SEBoK v. 2.9, released 13 November 2023" to "SEBoK v. 2.9, released 20 November 2023")
 
(14 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<blockquote>Paulk, M., C. Weber, B. Curtis, and M. Chrissis. 1995. The Capability Maturity Model: Guidelines for Improving the Software Process. Upper Saddle River, NJ, USA: Addison Wesley.</blockquote>
+
<blockquote>Paulk, M., C. Weber, B. Curtis, and M. Chrissis. 1995. ''The Capability Maturity Model: Guidelines for Improving the Software Process''. Upper Saddle River, NJ, USA: Addison Wesley.</blockquote>
  
 +
==Usage==
 +
This source is considered a primary reference for the [[Systems Engineering and Other Disciplines]] article.
  
 
==Annotation==
 
==Annotation==
===Systems Engineering and Other Disciplines===
+
None.
Annotation to be added for 1.0.
+
<center>'''SEBoK v. 2.9, released 20 November 2023'''</center>
  
 
[[Category:Primary Reference]]
 
[[Category:Primary Reference]]
 
{{DISQUS}}
 

Latest revision as of 23:33, 18 November 2023

Paulk, M., C. Weber, B. Curtis, and M. Chrissis. 1995. The Capability Maturity Model: Guidelines for Improving the Software Process. Upper Saddle River, NJ, USA: Addison Wesley.

Usage

This source is considered a primary reference for the Systems Engineering and Other Disciplines article.

Annotation

None.

SEBoK v. 2.9, released 20 November 2023