Difference between revisions of "Matrix of Implementation Examples"
Line 51: | Line 51: | ||
|+'''Table 2. Implementation Examples.''' Coverage of SEBoK Topics for Each Case Study (SEBoK Original) | |+'''Table 2. Implementation Examples.''' Coverage of SEBoK Topics for Each Case Study (SEBoK Original) | ||
!SEBoK Topic (Part 3) | !SEBoK Topic (Part 3) | ||
+ | !BT | ||
+ | !ATC | ||
+ | !NASA | ||
!HST | !HST | ||
!GPS | !GPS | ||
Line 62: | Line 65: | ||
|- | |- | ||
|[[Business or Mission Analysis]] | |[[Business or Mission Analysis]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 73: | Line 79: | ||
|- | |- | ||
|[[Stakeholder Needs and Requirements]] | |[[Stakeholder Needs and Requirements]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 84: | Line 93: | ||
|- | |- | ||
|[[System Requirements]] | |[[System Requirements]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
!X | !X | ||
!X | !X | ||
Line 95: | Line 107: | ||
|- | |- | ||
|[[System Architecture]] | |[[System Architecture]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
!X | !X | ||
Line 106: | Line 121: | ||
|- | |- | ||
|[[System Analysis]] | |[[System Analysis]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
!X | !X | ||
Line 117: | Line 135: | ||
|- | |- | ||
|[[System Implementation]] | |[[System Implementation]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
!X | !X | ||
Line 128: | Line 149: | ||
|- | |- | ||
|[[System Integration]] | |[[System Integration]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
!X | !X | ||
!X | !X | ||
Line 139: | Line 163: | ||
|- | |- | ||
|[[System Verification]] | |[[System Verification]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
!X | !X | ||
Line 150: | Line 177: | ||
|- | |- | ||
|[[System Validation]] | |[[System Validation]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
!X | !X | ||
Line 161: | Line 191: | ||
|- | |- | ||
|[[System Deployment]] | |[[System Deployment]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
!X | !X | ||
Line 172: | Line 205: | ||
|- | |- | ||
|[[Operation of the System]] | |[[Operation of the System]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
!X | !X | ||
Line 183: | Line 219: | ||
|- | |- | ||
|[[System Maintenance]] | |[[System Maintenance]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 194: | Line 233: | ||
|- | |- | ||
|[[Logistics]] | |[[Logistics]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 205: | Line 247: | ||
|- | |- | ||
|[[Planning]] | |[[Planning]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
!X | !X | ||
| | | | ||
Line 216: | Line 261: | ||
|- | |- | ||
|[[Assessment and Control]] | |[[Assessment and Control]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 227: | Line 275: | ||
|- | |- | ||
|[[Risk Management]] | |[[Risk Management]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
!X | !X | ||
!X | !X | ||
Line 238: | Line 289: | ||
|- | |- | ||
|[[Measurement]] | |[[Measurement]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 249: | Line 303: | ||
|- | |- | ||
|[[Decision Management]] | |[[Decision Management]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 260: | Line 317: | ||
|- | |- | ||
|[[Configuration Management]] | |[[Configuration Management]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 271: | Line 331: | ||
|- | |- | ||
|[[Information Management]] | |[[Information Management]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 282: | Line 345: | ||
|- | |- | ||
|[[Quality Management]] | |[[Quality Management]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 476: | Line 542: | ||
|- | |- | ||
|[[Configuration Management]] | |[[Configuration Management]] | ||
+ | |||
!X | !X | ||
| | | |
Revision as of 14:45, 24 June 2015
The following matrix maps the SEBoK Systems Engineering Implementation Examples to topics in the Systems Engineering Body of Knowledge (SEBoK), primarily Part 3. It provides both a list of potential systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset are included here for clarity. For additional information, see the implementation example of interest and the corresponding SEBoK topic.
Organization and Mapping of Case Studies to the SEBoK
The following short titles shown in Table 1 (Developed for BKCASE) are used for the Case Study implementation examples:
Case Studies | |
---|---|
BT | Business Transformation |
ATC | NextGen Air Traffic Control |
NASA | NASA's Mission to Saturn |
HST | Hubble Space Telescope |
GPS | Global Positioning System |
Radiation | Medical Radiation |
FBI VCF | FBI Virtual Case File System |
MSTI | Miniature Seeker Technology Integration |
Infusion Pump | Next Generation Medical Infusion Pump |
DfM | Design for Maintainability |
LTRS | Launch and Test Range System (LTRS) |
CAS | Complex Adaptive Operating System |
Table 2 shows how the topics (each row) align with the Case Study implementation examples (each column):
SEBoK Topic (Part 3) | BT | ATC | NASA | HST | GPS | Radiation | FBI VCF | MSTI | Infusion Pump | DfM | LTRS | CAS |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Business or Mission Analysis | X | X | ||||||||||
Stakeholder Needs and Requirements | X | X | ||||||||||
System Requirements | X | X | X | X | ||||||||
System Architecture | X | X | X | |||||||||
System Analysis | X | |||||||||||
System Implementation | X | |||||||||||
System Integration | X | X | X | |||||||||
System Verification | X | X | X | X | ||||||||
System Validation | X | X | X | X | ||||||||
System Deployment | X | |||||||||||
Operation of the System | X | X | ||||||||||
System Maintenance | ||||||||||||
Logistics | ||||||||||||
Planning | X | X | X | |||||||||
Assessment and Control | X | X | X | |||||||||
Risk Management | X | X | X | X | X | |||||||
Measurement | X | |||||||||||
Decision Management | X | |||||||||||
Configuration Management | X | |||||||||||
Information Management | ||||||||||||
Quality Management |
The following short titles shown in Table 3 (Developed for BKCASE) are used for the Vignette implementation examples:
Case Studies | |
---|---|
Bag Handling | Denver Airport Baggage Handling System |
VA Sub | Virginia Class Submarine |
Route Mod | UK West Coast Route Modernisation Project |
Water Mgmt | Singapore Water Management |
FAA AAS | FAA Advanced Automation System |
Light Rail | Standard Korean Light Transit System |
Table 4 shows how the topics (each row) align with the Vignette implementation examples (each column):
SEBoK Topic (Part 3) | Bag Handling | VA Sub | Route Mod | Water Mgmt | FAA AAS | Light Rail |
---|---|---|---|---|---|---|
Business or Mission Analysis | X | X | X | |||
Stakeholder Needs and Requirements | X | X | X | |||
System Requirements | X | X | X | |||
System Architecture | X | X | X | X | X | |
System Analysis | X | X | X | X | ||
System Implementation | X | |||||
System Integration | X | X | X | |||
System Verification | X | X | X | |||
System Validation | X | X | X | |||
System Deployment | X | |||||
Operation of the System | X | X | ||||
System Maintenance | X | |||||
Logistics | X | |||||
Planning | X | X | X | X | X | |
Assessment and Control | X | X | ||||
Risk Management | X | X | X | X | X | |
Measurement | X | |||||
Decision Management | X | X | X | |||
Configuration Management | X | X | X | |||
Information Management | X | |||||
Quality Management | X |
References
Works Cited
None.
Primary References
None.
Additional References
None.
SEBoK Discussion
Please provide your comments and feedback on the SEBoK below. You will need to log in to DISQUS using an existing account (e.g. Yahoo, Google, Facebook, Twitter, etc.) or create a DISQUS account. Simply type your comment in the text field below and DISQUS will guide you through the login or registration steps. Feedback will be archived and used for future updates to the SEBoK. If you provided a comment that is no longer listed, that comment has been adjudicated. You can view adjudication for comments submitted prior to SEBoK v. 1.0 at SEBoK Review and Adjudication. Later comments are addressed and changes are summarized in the Letter from the Editor and Acknowledgements and Release History.
If you would like to provide edits on this article, recommend new content, or make comments on the SEBoK as a whole, please see the SEBoK Sandbox.
blog comments powered by Disqus