Difference between revisions of "Matrix of Implementation Examples"

From SEBoK
Jump to navigation Jump to search
Tag: visualeditor
Line 50: Line 50:
 
|'''TS'''
 
|'''TS'''
 
|Taxi Service
 
|Taxi Service
 +
|-
 +
|'''TS'''
 +
|Taxi Service
 +
|-
 +
|'''SWFTS'''
 +
|SWFTS MBSE
 +
|-
 +
|'''NHS'''
 +
|Northwest Hydro System
 
|}
 
|}
  
Line 71: Line 80:
 
!PM
 
!PM
 
!TS
 
!TS
 +
!SWFTS
 +
!NHS
 
|-
 
|-
 
|[[Systems Thinking]]
 
|[[Systems Thinking]]
Line 87: Line 98:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
 
|[[Representing Systems with Models|Models and Simulation]]
 
|[[Representing Systems with Models|Models and Simulation]]
Line 103: Line 116:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
 
|[[Product Systems Engineering]]
 
|[[Product Systems Engineering]]
Line 113: Line 128:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 135: Line 152:
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
 
|[[Enterprise Systems Engineering]]
 
|[[Enterprise Systems Engineering]]
Line 151: Line 170:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
 
|[[Systems of Systems (SoS)]]
 
|[[Systems of Systems (SoS)]]
Line 167: Line 188:
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
 
|[[Life Cycle Models]]
 
|[[Life Cycle Models]]
Line 181: Line 204:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 199: Line 224:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
 
|[[Stakeholder Needs and Requirements]]
 
|[[Stakeholder Needs and Requirements]]
Line 215: Line 242:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
 
|[[System Requirements]]
 
|[[System Requirements]]
Line 231: Line 260:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
 
|[[System Architecture]]
 
|[[System Architecture]]
Line 243: Line 274:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 263: Line 296:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
 
|[[System Implementation]]
 
|[[System Implementation]]
Line 279: Line 314:
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
 
|[[System Integration]]
 
|[[System Integration]]
Line 295: Line 332:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
 
|[[System Verification]]
 
|[[System Verification]]
Line 307: Line 346:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 323: Line 364:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 340: Line 383:
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 359: Line 404:
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
 
|[[System Maintenance]]
 
|[[System Maintenance]]
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 377: Line 426:
 
|-
 
|-
 
|[[Logistics]]
 
|[[Logistics]]
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 406: Line 457:
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 
|
 
|
 
|-
 
|-
Line 423: Line 476:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
 
|[[Risk Management]]
 
|[[Risk Management]]
Line 438: Line 493:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|
 
|
 
|-
 
|-
Line 450: Line 507:
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 471: Line 530:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
 
|[[Configuration Management]]
 
|[[Configuration Management]]
Line 485: Line 546:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 503: Line 566:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|-
 
|-
 
|[[Quality Management]]
 
|[[Quality Management]]
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 534: Line 601:
 
!X
 
!X
 
!X
 
!X
 +
|
 +
|
 
|
 
|
 
|-
 
|-
Line 549: Line 618:
 
|
 
|
 
!X
 
!X
 +
|
 +
|
 
|
 
|
 
|
 
|

Revision as of 14:34, 27 September 2016

The following matrix maps the SEBoK Systems Engineering Implementation Examples to topics in the Systems Engineering Body of Knowledge (SEBoK). It provides both a list of potential systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset are included here for clarity. For additional information, see the implementation example of interest and the corresponding SEBoK topic.

Organization and Mapping of Case Studies to the SEBoK

The following short titles shown in Table 1 (Developed for BKCASE) are used for the Case Study implementation examples:

Table 1. Short Titles for the SEBoK Case Studies. (SEBoK Original)
Case Studies
BT Business Transformation
ATC NextGen Air Traffic Control
NASA NASA's Mission to Saturn
HST Hubble Space Telescope
GPS Global Positioning System
GPS II Global Positioning System II
Radiation Medical Radiation
FBI VCF FBI Virtual Case File System
MSTI Miniature Seeker Technology Integration
Infusion Pump Next Generation Medical Infusion Pump
DfM Design for Maintainability
CAS Complex Adaptive Operating System
PM Project Management
TS Taxi Service
TS Taxi Service
SWFTS SWFTS MBSE
NHS Northwest Hydro System

Table 2 shows how the topics (each row) align with the Case Study implementation examples (each column):

Table 2. Implementation Examples. Coverage of SEBoK Topics for Each Case Study (SEBoK Original)
SEBoK Topic BT ATC NASA HST GPS GPS II Radiation FBI VCF MSTI Infusion Pump DfM CAS PM TS SWFTS NHS
Systems Thinking X X X X X X X X X
Models and Simulation X X X X X
Product Systems Engineering X X X X
Service Systems Engineering X X X
Enterprise Systems Engineering X X X X X X
Systems of Systems (SoS) X X X X
Life Cycle Models X X X X X X X
Business or Mission Analysis X X X X X X X
Stakeholder Needs and Requirements X X X X X X X X
System Requirements X X X X X X
System Architecture X X X X X X
System Analysis X X X X X
System Implementation X X X
System Integration X X X X X X X X X
System Verification X X X X X
System Validation X X X X X X
System Deployment X X X
Operation of the System X X X X X
System Maintenance
Logistics
Planning X X X X X X
Assessment and Control X X X X X
Risk Management X X X X X X X X X
Measurement X
Decision Management X X X X X
Configuration Management X X X X X
Information Management X X X X
Quality Management
Enabling Systems Engineering X X X X X X X X
Related Disciplines X X X X X


The following short titles shown in Table 3 (Developed for BKCASE) are used for the Vignette implementation examples:

Table 3. Short Titles for the Vignettes. (SEBoK Original)
Case Studies
Bag Handling Denver Airport Baggage Handling System
VA Sub Virginia Class Submarine
Route Mod UK West Coast Route Modernisation Project
Water Mgmt Singapore Water Management
FAA AAS FAA Advanced Automation System
Light Rail Standard Korean Light Transit System

Table 4 shows how the topics (each row) align with the Vignette implementation examples (each column):

Table 4. Implementation Examples. Coverage of SEBoK Topics for Each Vignette. (SEBoK Original)
SEBoK Topic (Part 3) Bag Handling VA Sub Route Mod Water Mgmt FAA AAS Light Rail
Business or Mission Analysis X X X
Stakeholder Needs and Requirements X X X
System Requirements X X X
System Architecture X X X X X
System Analysis X X X X
System Implementation X
System Integration X X X
System Verification X X X
System Validation X X X
System Deployment X
Operation of the System X X
System Maintenance X
Logistics X
Planning X X X X X
Assessment and Control X X
Risk Management X X X X X
Measurement X
Decision Management X X X
Configuration Management X X X
Information Management X
Quality Management X

References

Works Cited

None.

Primary References

None.

Additional References

None.


< Previous Article | Parent Article | Next Article >
SEBoK v. 1.9.1 released 30 September 2018

SEBoK Discussion

Please provide your comments and feedback on the SEBoK below. You will need to log in to DISQUS using an existing account (e.g. Yahoo, Google, Facebook, Twitter, etc.) or create a DISQUS account. Simply type your comment in the text field below and DISQUS will guide you through the login or registration steps. Feedback will be archived and used for future updates to the SEBoK. If you provided a comment that is no longer listed, that comment has been adjudicated. You can view adjudication for comments submitted prior to SEBoK v. 1.0 at SEBoK Review and Adjudication. Later comments are addressed and changes are summarized in the Letter from the Editor and Acknowledgements and Release History.

If you would like to provide edits on this article, recommend new content, or make comments on the SEBoK as a whole, please see the SEBoK Sandbox.

blog comments powered by Disqus