Difference between revisions of "Life Cycle (glossary)"

From SEBoK
Jump to navigation Jump to search
Line 13: Line 13:
  
 
===Discussion===
 
===Discussion===
The life cycles most commonly used in Systems Engineering are described in the [[Life Cycle Models]] article.
+
See also [[Life Cycle Model (glossary]].
 
[[Category:Glossary of Terms]]
 
[[Category:Glossary of Terms]]
  
 
{{DISQUS}}
 
{{DISQUS}}

Revision as of 18:56, 17 March 2013

(1) The organized collection of activities, relationships and contracts which apply to a system-of-interest during its life. (Pyster 2009, 73)

(2) The evolution of a system, product, service, project or other human-made entity from conception through retirement. (ISO/IEC 2008)

(3) Development (life) cycles start with user needs and end with system decommissioning and disposal. Project cycles contain three aspects: business, budget, and technical. (Mooz, Forsberg, Cotterman 2003, 259)

Source

(1) Pyster, A. (ed.). 2009. Graduate Software Engineering 2009 (GSwE2009): Curriculum Guidelines for Graduate Degree Programs in Software Engineering. Integrated Software & Systems Engineering Curriculum Project. Hoboken, NJ, USA: Stevens Institute of Technology, September 30, 2009.

(2) ISO/IEC 2008. Systems and Software Engineering -- System Life Cycle Processes. Geneva, Switzerland: International Organisation for Standardisation / International Electrotechnical Commissions. ISO/IEC/IEEE 15288:2008.

(3) Mooz, H., K. Forsberg, H. Cotterman. 2003. Communicating Project Management. Hoboken, NJ, USA: John Wiley and Sons.

Discussion

See also Life Cycle Model (glossary.


SEBoK v. 1.9.1 released 30 September 2018

SEBoK Discussion

Please provide your comments and feedback on the SEBoK below. You will need to log in to DISQUS using an existing account (e.g. Yahoo, Google, Facebook, Twitter, etc.) or create a DISQUS account. Simply type your comment in the text field below and DISQUS will guide you through the login or registration steps. Feedback will be archived and used for future updates to the SEBoK. If you provided a comment that is no longer listed, that comment has been adjudicated. You can view adjudication for comments submitted prior to SEBoK v. 1.0 at SEBoK Review and Adjudication. Later comments are addressed and changes are summarized in the Letter from the Editor and Acknowledgements and Release History.

If you would like to provide edits on this article, recommend new content, or make comments on the SEBoK as a whole, please see the SEBoK Sandbox.

blog comments powered by Disqus