Matrix of Implementation Examples
The following matrix maps the SEBoK Systems Engineering Implementation Examples to topics in the Systems Engineering Body of Knowledge (SEBoK), primarily Part 3. It provides both a list of potential systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset are included here for clarity. For additional information, see the implementation example of interest and the corresponding SEBoK topic.
Organization and Mapping of Case Studies to the SEBoK=
The following short titles shown in Table 1 (Developed for BKCASE) are used for the implementation examples:
Case Studies | Vignettes | ||||
---|---|---|---|---|---|
HST | Hubble Space Telescope | Bag Handling | Denver Airport Baggage Handling System | ||
GPS | Global Positioning System | VA Sub | Virginia Class Submarine | ||
Radiation | Medical Radiation | Route Mod | UK West Coast Route Modernisation Project | ||
FBI VCF | FBI Virtual Case File System | Water Mgmt | Singapore Water Management | ||
MSTI | Miniature Seeker Technology Integration | FAA AAS | FAA Advanced Automation System | ||
Infusion Pump | Next Generation Medical Infusion Pump | Light Rail | Standard Korean Light Transit System |
Table two shows how the topics (each row) align with the implementation examples (each column).
SEBoK Topic (Part 3) | HST | GPS | Radiation | FBI VCF | MSTI | Infusion Pump | Bag Handling | VA Sub | Route Mod | Water Mgmt | FAA AAS | Light Rail |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Mission Analysis | X | X | X | X | X | |||||||
Stakeholder Needs and Requirements | X | X | X | X | X | |||||||
System Requirements | X | X | X | X | X | X | X | |||||
Architectural Design: Logical | X | X | X | X | X | X | X | X | ||||
Architectural Design: Physical | X | X | X | X | X | X | X | X | ||||
System Analysis | X | X | X | X | X | |||||||
System Implementation | X | X | ||||||||||
System Integration | X | X | X | X | X | X | ||||||
System Verification | X | X | X | X | X | X | X | |||||
System Validation | X | X | X | X | X | X | X | |||||
System Deployment | X | X | ||||||||||
Operation of the System | X | X | X | X | ||||||||
System Maintenance | X | |||||||||||
Logistics | X | |||||||||||
Planning | X | X | X | X | X | X | X | X | ||||
Assessment and Control | X | X | X | X | X | |||||||
Risk Management | X | X | X | X | X | X | X | X | X | X | ||
Measurement | X | X | ||||||||||
Decision Management | X | X | X | X | ||||||||
Configuration Management | X | X | X | X | ||||||||
Information Management | X | |||||||||||
Quality Management | X |
References
Works Cited
No citations have been identified for version 1.0.
Primary References
No primary references have been identified for version 1.0.
Additional References
No additional references have been identified for version 1.0.
SEBoK Discussion
Please provide your comments and feedback on the SEBoK below. You will need to log in to DISQUS using an existing account (e.g. Yahoo, Google, Facebook, Twitter, etc.) or create a DISQUS account. Simply type your comment in the text field below and DISQUS will guide you through the login or registration steps. Feedback will be archived and used for future updates to the SEBoK. If you provided a comment that is no longer listed, that comment has been adjudicated. You can view adjudication for comments submitted prior to SEBoK v. 1.0 at SEBoK Review and Adjudication. Later comments are addressed and changes are summarized in the Letter from the Editor and Acknowledgements and Release History.
If you would like to provide edits on this article, recommend new content, or make comments on the SEBoK as a whole, please see the SEBoK Sandbox.
blog comments powered by Disqus