Difference between revisions of "Matrix of Implementation Examples"
Line 108: | Line 108: | ||
!X | !X | ||
|- | |- | ||
− | + | |[[Architectural Design: Logical]] | |
| | | | ||
!X | !X | ||
Line 122: | Line 122: | ||
!X | !X | ||
|- | |- | ||
− | + | |[[Architectural Design: Physical]] | |
| | | | ||
!X | !X | ||
Line 136: | Line 136: | ||
!X | !X | ||
|- | |- | ||
− | + | |[[System Analysis]] | |
| | | | ||
!X | !X | ||
Line 150: | Line 150: | ||
!X | !X | ||
|- | |- | ||
− | + | |[[System Implementation]] | |
| | | | ||
!X | !X | ||
Line 164: | Line 164: | ||
!X | !X | ||
|- | |- | ||
− | + | |[[System Integration]] | |
!X | !X | ||
!X | !X | ||
Line 178: | Line 178: | ||
!X | !X | ||
|- | |- | ||
− | + | |[[System Verification]] | |
| | | | ||
!X | !X | ||
Line 192: | Line 192: | ||
!X | !X | ||
|- | |- | ||
− | + | |[[System Validation]] | |
| | | | ||
!X | !X | ||
Line 206: | Line 206: | ||
!X | !X | ||
|- | |- | ||
− | + | |[[System Deployment]] | |
| | | | ||
!X | !X | ||
Line 220: | Line 220: | ||
!X | !X | ||
|- | |- | ||
− | + | |[[Operation of the System]] | |
| | | | ||
!X | !X | ||
Line 234: | Line 234: | ||
!X | !X | ||
|- | |- | ||
− | + | |[[System Maintenance]] | |
| | | | ||
| | | | ||
Line 248: | Line 248: | ||
!X | !X | ||
|- | |- | ||
− | + | |[[Logistics]] | |
| | | | ||
| | | | ||
Line 262: | Line 262: | ||
| | | | ||
|- | |- | ||
− | + | |[[Planning]] | |
!X | !X | ||
| | | | ||
Line 276: | Line 276: | ||
!X | !X | ||
|- | |- | ||
− | + | |[[Assessment and Control]] | |
| | | | ||
| | | | ||
Line 290: | Line 290: | ||
!X | !X | ||
|- | |- | ||
− | + | |[[Risk Management]] | |
!X | !X | ||
!X | !X | ||
Line 304: | Line 304: | ||
!X | !X | ||
|- | |- | ||
− | + | |[[Measurement]] | |
| | | | ||
| | | | ||
Line 318: | Line 318: | ||
!X | !X | ||
|- | |- | ||
− | + | |[[Decision Management]] | |
| | | | ||
| | | | ||
Line 332: | Line 332: | ||
| | | | ||
|- | |- | ||
− | + | |[[Configuration Management]] | |
| | | | ||
| | | | ||
Line 346: | Line 346: | ||
| | | | ||
|- | |- | ||
− | + | |[[Information Management]] | |
| | | | ||
| | | | ||
Line 360: | Line 360: | ||
| | | | ||
|- | |- | ||
− | + | |[[Quality Management]] | |
| | | | ||
| | | |
Revision as of 17:35, 9 August 2012
The following matrix maps the SEBoK Systems Engineering Implementation Examples to knowledge areas in the Systems Engineering Body of Knowledge (SEBoK), primarily Part 3. It provides both a list of potential systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset are included here for clarity. For additional information, see the implementation example of interest and the corresponding SEBoK topic.
The following short titles shown in Table 1 (Developed for BKCASE) are used for the implementation examples:
Case Studies | Vignettes | ||||
---|---|---|---|---|---|
HST | Hubble Space Telescope | Bag Handling | Denver Airport Baggage Handling System | ||
GPS | Global Positioning System | VA Sub | Virginia Class Submarine | ||
Radiation | Medical Radiation | Route Mod | UK West Coast Route Modernisation Project | ||
FBI VCF | FBI Virtual Case File System | Water Mgmt | Singapore Water Management | ||
MSTI | Miniature Seeker Technology Integration | FAA AAS | FAA Advanced Automation System | ||
Infusion Pump | Next Generation Medical Infusion Pump | Light Rail | Standard Korean Light Transit System |
References
Works Cited
No citations have been identified for version 1.0.
Primary References
No primary references have been identified for version 1.0.
Additional References
No additional references have been identified for version 1.0.
Comments from SEBok 0.5 Wiki
No comments were logged for this article in the SEBoK 0.5 wiki. Because of this, it is especially important for reviewers to provide feedback on this article. Please see the discussion prompts below.
SEBoK Discussion
Please provide your comments and feedback on the SEBoK below. You will need to log in to DISQUS using an existing account (e.g. Yahoo, Google, Facebook, Twitter, etc.) or create a DISQUS account. Simply type your comment in the text field below and DISQUS will guide you through the login or registration steps. Feedback will be archived and used for future updates to the SEBoK. If you provided a comment that is no longer listed, that comment has been adjudicated. You can view adjudication for comments submitted prior to SEBoK v. 1.0 at SEBoK Review and Adjudication. Later comments are addressed and changes are summarized in the Letter from the Editor and Acknowledgements and Release History.
If you would like to provide edits on this article, recommend new content, or make comments on the SEBoK as a whole, please see the SEBoK Sandbox.
blog comments powered by DisqusSEBoK Topic | HST | GPS | Radiation | FBI VCF | MSTI | Infusion Pump | Bag Handling | VA Sub | Route Mod | Water Mgmt | FAA AAS | Light Rail |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Mission Analysis | X | X | X | X | X | |||||||
Stakeholder Needs and Requirements | X | X | X | X | X | |||||||
System Requirements | X | X | X | X | X | X | X | |||||
Architectural Design: Logical | X | X | X | X | X | X | X | X | ||||
Architectural Design: Physical | X | X | X | X | X | X | X | X | ||||
System Analysis | X | X | X | X | X | |||||||
System Implementation | X | X | ||||||||||
System Integration | X | X | X | X | X | X | ||||||
System Verification | X | X | X | X | X | X | X | |||||
System Validation | X | X | X | X | X | X | X | |||||
System Deployment | X | X | ||||||||||
Operation of the System | X | X | X | X | ||||||||
System Maintenance | X | |||||||||||
Logistics | X | |||||||||||
Planning | X | X | X | X | X | X | X | X | ||||
Assessment and Control | X | X | X | X | X | |||||||
Risk Management | X | X | X | X | X | X | X | X | X | X | ||
Measurement | X | X | ||||||||||
Decision Management | X | X | X | X | ||||||||
Configuration Management | X | X | X | X | ||||||||
Information Management | X | |||||||||||
Quality Management | X |