Difference between revisions of "Matrix of Implementation Examples"
Tag: visualeditor |
|||
Line 41: | Line 41: | ||
|'''DfM''' | |'''DfM''' | ||
|Design for Maintainability | |Design for Maintainability | ||
− | |||
− | |||
− | |||
|- | |- | ||
|'''CAS''' | |'''CAS''' | ||
Line 80: | Line 77: | ||
!X | !X | ||
!X | !X | ||
− | | | + | |t |
!X | !X | ||
|- | |- | ||
Line 95: | Line 92: | ||
| | | | ||
| | | | ||
− | | | + | |t |
| | | | ||
|- | |- | ||
Line 110: | Line 107: | ||
| | | | ||
| | | | ||
− | | | + | |t |
| | | | ||
|- | |- | ||
Line 125: | Line 122: | ||
| | | | ||
| | | | ||
− | ! | + | !t |
| | | | ||
|- | |- | ||
Line 140: | Line 137: | ||
| | | | ||
| | | | ||
− | | | + | |t |
| | | | ||
|- | |- | ||
Line 155: | Line 152: | ||
| | | | ||
| | | | ||
− | | | + | |t |
| | | | ||
|- | |- | ||
Line 170: | Line 167: | ||
!X | !X | ||
!X | !X | ||
− | | | + | |t |
!X | !X | ||
|- | |- | ||
Line 185: | Line 182: | ||
!X | !X | ||
| | | | ||
− | ! | + | !t |
| | | | ||
|- | |- | ||
Line 200: | Line 197: | ||
!X | !X | ||
| | | | ||
− | ! | + | !t |
| | | | ||
|- | |- | ||
Line 215: | Line 212: | ||
!X | !X | ||
| | | | ||
− | ! | + | !t |
| | | | ||
|- | |- | ||
Line 230: | Line 227: | ||
!X | !X | ||
| | | | ||
− | ! | + | !t |
| | | | ||
|- | |- | ||
Line 245: | Line 242: | ||
| | | | ||
| | | | ||
− | | | + | |t |
!X | !X | ||
|- | |- | ||
Line 260: | Line 257: | ||
| | | | ||
!X | !X | ||
− | | | + | |t |
| | | | ||
|- | |- | ||
Line 275: | Line 272: | ||
| | | | ||
!X | !X | ||
− | | | + | |t |
| | | | ||
|- | |- | ||
Line 290: | Line 287: | ||
!X | !X | ||
| | | | ||
− | ! | + | !t |
| | | | ||
|- | |- | ||
Line 305: | Line 302: | ||
!X | !X | ||
| | | | ||
− | ! | + | !t |
| | | | ||
|- | |- | ||
Line 320: | Line 317: | ||
| | | | ||
!X | !X | ||
− | | | + | |t |
| | | | ||
|- | |- | ||
Line 335: | Line 332: | ||
!X | !X | ||
!X | !X | ||
− | | | + | |t |
| | | | ||
|- | |- | ||
Line 350: | Line 347: | ||
| | | | ||
| | | | ||
− | | | + | |t |
| | | | ||
|- | |- | ||
Line 365: | Line 362: | ||
| | | | ||
| | | | ||
− | | | + | |t |
| | | | ||
|- | |- | ||
Line 380: | Line 377: | ||
!X | !X | ||
| | | | ||
− | ! | + | !t |
| | | | ||
|- | |- | ||
Line 395: | Line 392: | ||
| | | | ||
| | | | ||
− | ! | + | !t |
| | | | ||
|- | |- | ||
Line 410: | Line 407: | ||
!X | !X | ||
| | | | ||
− | ! | + | !t |
!X | !X | ||
|- | |- | ||
Line 425: | Line 422: | ||
| | | | ||
| | | | ||
− | | | + | |t |
| | | | ||
|- | |- | ||
Line 440: | Line 437: | ||
| | | | ||
| | | | ||
− | ! | + | !t |
!X | !X | ||
|- | |- | ||
Line 455: | Line 452: | ||
| | | | ||
!X | !X | ||
− | ! | + | !t |
!X | !X | ||
|- | |- | ||
Line 470: | Line 467: | ||
| | | | ||
| | | | ||
− | ! | + | !t |
!X | !X | ||
|- | |- | ||
Line 485: | Line 482: | ||
| | | | ||
| | | | ||
− | | | + | |t |
| | | | ||
|- | |- | ||
Line 500: | Line 497: | ||
!X | !X | ||
!X | !X | ||
− | ! | + | !t |
!X | !X | ||
|- | |- | ||
Line 515: | Line 512: | ||
!X | !X | ||
| | | | ||
− | | | + | |t |
!X | !X | ||
|} | |} |
Revision as of 12:01, 29 June 2015
The following matrix maps the SEBoK Systems Engineering Implementation Examples to topics in the Systems Engineering Body of Knowledge (SEBoK), primarily Part 3. It provides both a list of potential systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset are included here for clarity. For additional information, see the implementation example of interest and the corresponding SEBoK topic.
Organization and Mapping of Case Studies to the SEBoK
The following short titles shown in Table 1 (Developed for BKCASE) are used for the Case Study implementation examples:
Case Studies | |
---|---|
BT | Business Transformation |
ATC | NextGen Air Traffic Control |
NASA | NASA's Mission to Saturn |
HST | Hubble Space Telescope |
GPS | Global Positioning System |
GPS II | Global Positioning System II |
Radiation | Medical Radiation |
FBI VCF | FBI Virtual Case File System |
MSTI | Miniature Seeker Technology Integration |
Infusion Pump | Next Generation Medical Infusion Pump |
DfM | Design for Maintainability |
CAS | Complex Adaptive Operating System |
Table 2 shows how the topics (each row) align with the Case Study implementation examples (each column):
The following short titles shown in Table 3 (Developed for BKCASE) are used for the Vignette implementation examples:
Case Studies | |
---|---|
Bag Handling | Denver Airport Baggage Handling System |
VA Sub | Virginia Class Submarine |
Route Mod | UK West Coast Route Modernisation Project |
Water Mgmt | Singapore Water Management |
FAA AAS | FAA Advanced Automation System |
Light Rail | Standard Korean Light Transit System |
Table 4 shows how the topics (each row) align with the Vignette implementation examples (each column):
SEBoK Topic (Part 3) | Bag Handling | VA Sub | Route Mod | Water Mgmt | FAA AAS | Light Rail |
---|---|---|---|---|---|---|
Business or Mission Analysis | X | X | X | |||
Stakeholder Needs and Requirements | X | X | X | |||
System Requirements | X | X | X | |||
System Architecture | X | X | X | X | X | |
System Analysis | X | X | X | X | ||
System Implementation | X | |||||
System Integration | X | X | X | |||
System Verification | X | X | X | |||
System Validation | X | X | X | |||
System Deployment | X | |||||
Operation of the System | X | X | ||||
System Maintenance | X | |||||
Logistics | X | |||||
Planning | X | X | X | X | X | |
Assessment and Control | X | X | ||||
Risk Management | X | X | X | X | X | |
Measurement | X | |||||
Decision Management | X | X | X | |||
Configuration Management | X | X | X | |||
Information Management | X | |||||
Quality Management | X |
References
Works Cited
None.
Primary References
None.
Additional References
None.
SEBoK Discussion
Please provide your comments and feedback on the SEBoK below. You will need to log in to DISQUS using an existing account (e.g. Yahoo, Google, Facebook, Twitter, etc.) or create a DISQUS account. Simply type your comment in the text field below and DISQUS will guide you through the login or registration steps. Feedback will be archived and used for future updates to the SEBoK. If you provided a comment that is no longer listed, that comment has been adjudicated. You can view adjudication for comments submitted prior to SEBoK v. 1.0 at SEBoK Review and Adjudication. Later comments are addressed and changes are summarized in the Letter from the Editor and Acknowledgements and Release History.
If you would like to provide edits on this article, recommend new content, or make comments on the SEBoK as a whole, please see the SEBoK Sandbox.
blog comments powered by Disqus