Difference between revisions of "Matrix of Implementation Examples"
Line 4: | Line 4: | ||
The following short titles shown in Table 1 (Developed for BKCASE) are used for the implementation examples: | The following short titles shown in Table 1 (Developed for BKCASE) are used for the implementation examples: | ||
− | < | + | <center> |
{| align="center" | {| align="center" | ||
+ | |+'''Table 1. Short Titles for the SEBoK Case Studies and Vignettes.''' (SEBoK Original) | ||
|- | |- | ||
!scope="col" colspan="2" | Case Studies | !scope="col" colspan="2" | Case Studies | ||
Line 14: | Line 15: | ||
|'''HST''' | |'''HST''' | ||
|Hubble Space Telescope | |Hubble Space Telescope | ||
− | |||
|'''Bag Handling''' | |'''Bag Handling''' | ||
|Denver Airport Baggage Handling System | |Denver Airport Baggage Handling System | ||
Line 20: | Line 20: | ||
|'''GPS''' | |'''GPS''' | ||
|Global Positioning System | |Global Positioning System | ||
− | |||
|'''VA Sub''' | |'''VA Sub''' | ||
|Virginia Class Submarine | |Virginia Class Submarine | ||
Line 26: | Line 25: | ||
|'''Radiation''' | |'''Radiation''' | ||
|Medical Radiation | |Medical Radiation | ||
− | |||
|'''Route Mod''' | |'''Route Mod''' | ||
|UK West Coast Route Modernisation Project | |UK West Coast Route Modernisation Project | ||
Line 32: | Line 30: | ||
|'''FBI VCF''' | |'''FBI VCF''' | ||
|FBI Virtual Case File System | |FBI Virtual Case File System | ||
− | |||
|'''Water Mgmt''' | |'''Water Mgmt''' | ||
|Singapore Water Management | |Singapore Water Management | ||
Line 38: | Line 35: | ||
|'''MSTI''' | |'''MSTI''' | ||
|Miniature Seeker Technology Integration | |Miniature Seeker Technology Integration | ||
− | |||
|'''FAA AAS''' | |'''FAA AAS''' | ||
|FAA Advanced Automation System | |FAA Advanced Automation System | ||
Line 44: | Line 40: | ||
|'''Infusion Pump''' | |'''Infusion Pump''' | ||
|Next Generation Medical Infusion Pump | |Next Generation Medical Infusion Pump | ||
− | |||
|'''Light Rail''' | |'''Light Rail''' | ||
|Standard Korean Light Transit System | |Standard Korean Light Transit System | ||
|} | |} | ||
− | + | </center> | |
Table 2 shows how the topics (each row) align with the implementation examples (each column). | Table 2 shows how the topics (each row) align with the implementation examples (each column). |
Revision as of 18:31, 12 September 2012
The following matrix maps the SEBoK Systems Engineering Implementation Examples to topics in the Systems Engineering Body of Knowledge (SEBoK), primarily Part 3. It provides both a list of potential systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset are included here for clarity. For additional information, see the implementation example of interest and the corresponding SEBoK topic.
Organization and Mapping of Case Studies to the SEBoK
The following short titles shown in Table 1 (Developed for BKCASE) are used for the implementation examples:
Case Studies | Vignettes | ||||
---|---|---|---|---|---|
HST | Hubble Space Telescope | Bag Handling | Denver Airport Baggage Handling System | ||
GPS | Global Positioning System | VA Sub | Virginia Class Submarine | ||
Radiation | Medical Radiation | Route Mod | UK West Coast Route Modernisation Project | ||
FBI VCF | FBI Virtual Case File System | Water Mgmt | Singapore Water Management | ||
MSTI | Miniature Seeker Technology Integration | FAA AAS | FAA Advanced Automation System | ||
Infusion Pump | Next Generation Medical Infusion Pump | Light Rail | Standard Korean Light Transit System |
Table 2 shows how the topics (each row) align with the implementation examples (each column).
SEBoK Topic (Part 3) | HST | GPS | Radiation | FBI VCF | MSTI | Infusion Pump | Bag Handling | VA Sub | Route Mod | Water Mgmt | FAA AAS | Light Rail |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Mission Analysis | X | X | X | X | X | |||||||
Stakeholder Needs and Requirements | X | X | X | X | X | |||||||
System Requirements | X | X | X | X | X | X | X | |||||
Architectural Design: Logical | X | X | X | X | X | X | X | X | ||||
Architectural Design: Physical | X | X | X | X | X | X | X | X | ||||
System Analysis | X | X | X | X | X | |||||||
System Implementation | X | X | ||||||||||
System Integration | X | X | X | X | X | X | ||||||
System Verification | X | X | X | X | X | X | X | |||||
System Validation | X | X | X | X | X | X | X | |||||
System Deployment | X | X | ||||||||||
Operation of the System | X | X | X | X | ||||||||
System Maintenance | X | |||||||||||
Logistics | X | |||||||||||
Planning | X | X | X | X | X | X | X | X | ||||
Assessment and Control | X | X | X | X | X | |||||||
Risk Management | X | X | X | X | X | X | X | X | X | X | ||
Measurement | X | X | ||||||||||
Decision Management | X | X | X | X | ||||||||
Configuration Management | X | X | X | X | ||||||||
Information Management | X | |||||||||||
Quality Management | X |
References
None.
SEBoK Discussion
Please provide your comments and feedback on the SEBoK below. You will need to log in to DISQUS using an existing account (e.g. Yahoo, Google, Facebook, Twitter, etc.) or create a DISQUS account. Simply type your comment in the text field below and DISQUS will guide you through the login or registration steps. Feedback will be archived and used for future updates to the SEBoK. If you provided a comment that is no longer listed, that comment has been adjudicated. You can view adjudication for comments submitted prior to SEBoK v. 1.0 at SEBoK Review and Adjudication. Later comments are addressed and changes are summarized in the Letter from the Editor and Acknowledgements and Release History.
If you would like to provide edits on this article, recommend new content, or make comments on the SEBoK as a whole, please see the SEBoK Sandbox.
blog comments powered by Disqus